1.0 INTRODUCTION AND OVERVIEW OF PROJECT
Kajang Municipality intends to redevelop the stadium into an Innovative Research Park. The
park is intended to take advantage of a number of universities and research centres in Kajang
area to turn the municipality into centre for innovative, high value added industries. However
the administration is in no position to fund the proposed project. You are required to propose a
viable solution to ensure the success of the project. Explain the responsibility of all parties
involved in the project, the benefit of your proposal and the problem that might occur in the
future.
2.0 BACKGROUND OF SUGGESTED SITE
The center of Kajang is the bustling Old Town, where all the roads meet. Most of the colonial-
era buildings were constructed around 1920s to 1930s. The architecture of these shophouses is a
combination of traditional Chinese and European designs. The ground floor was used mostly for
commercial activities and the upper floor as the family living quarter.
One of Kajang's landmarks is Stadium Kajang which is situated in the heart of the town.
It is near a popular hangout place among the locals named Haji Samuri, which is also home to
the famous dish satay Kajang. People come from all over Malaysia to taste the satay here. The
stadium can accommodate up to 5,000 people and is used throughout the year for the community
soccer competitions.
Stadium Kajang are often used for sports day and funfairs. Many football matches were
held there in the 1960s and 1970s. The police, military and schools would have their sports day
at the stadium as it had an eight-lane 400m running track. It was also often rented to funfair
operators. During the pre-war era, it was just a field with grass tennis courts and a clubhouse. It
was only fenced up during the 1980s. The Kajang Stadium has persevered through many decades
and seen some important football matches.
3.0 CONCEPT OF PRIVATIZATION METHOD
The term “privatization” refers to the process of private, usually for-profit businesses taking over
the provision of public, government provided services. This includes contracting with or selling
to private parties the functions or firms previously controlled or owned by governments.
Privatization covers a wide spectrum of government operations, management, and ownership
arrangements. Some types of privatization which may be considered.
a. “Outsourcing” means that a government agency delegates some of its in-house
operations or processes to a third party. It is a contracting transaction where the
government agency purchases services from a private firm while keeping ownership and
ultimate responsibility for the underlying processes. They inform the private firm of what
they want and how they want the work performed. The private firm can be authorized to
operate as well as redesign basic processes in order to ensure even greater cost and
efficiency benefits.
b. “Design, Build, Operate (DBO)” means negotiating a contract with a private firm for
design and construction services with comprehensive operating agreements for new,
expanded, or upgraded facilities. The project components are procured from the private
sector in a single contract with financing secured by the public sector. From design
through operation, these contracts can extend for periods of up to 20 years or more.
c. “Public-Private Partnership” refers to a cooperative arrangement between a local
government and a private organization in which both parties assume some responsibility
for operating a program or service. Each party brings something to the arrangement that
contributes to the operation of that particular service.
d. “Asset Sale” means the sale of government-owned assets to private companies, such as
the sale of water/wastewater and electric utility assets.
Proponents of privatization often point to success stories which demonstrate cost savings, while
opponents express concerns about accountability and undermining organized labor, which results
in jobs without health, pension, and other benefits.
The most common type of privatization is contracting out programs or services to a
private company or another governmental entity to operate. The contracting government is still
responsible for the service, but someone else actually provides the service. This is usually the
most popular method of privatization that is accomplished through a Request for Proposal
(RFP) process or an Invitation to Bid (ITB).
In the RFP process, any and all qualified businesses may submit a proposal to the
government agency that describes in detail how they would perform the particular service and for
what cost. Through this competitive process, it is not necessarily the lowest cost that “wins” the
contract, but that which demonstrates that a service can be both improved and operated more
economically at the same time. An Invitation to Bid is the standard sealed competitive bid in
which the lowest bidder usually gets the job.
Contracts may take a variety of forms, including fixed price contracts, unit price
contracts and cost plan contracts. They usually are quite detailed. It is important that a contractor
can be held accountable for the performance of the service as desired by the government, and
that the expectation of such performance is clearly defined. The contract should be capable of
being terminated under pre-established conditions if necessary, and include options for the
government in such a situation. There are typically more opportunities for privatization than
local officials realize for solving problems involving government-owned assets, facility
operations, services, debt structure, and other facilities and infrastructure.
4.0 OBJECTIVES OF PRIVATIZATION
5.0 RESPONSIBILITIES OF BOTH GOVERNMENT AND PRIVATE COMPANY IN
PRIVATIZATION
5.1 RESPONSIBILITIES OF MPKJ
MPKJ should always be planned as part of an integrated public transport system, not as a
separate money-making venture.
MPKJ should make sure that the tram lines should go where the demand is (present or
planned), not where there is a disused railway line or other surplus land.
Monitor of the tram service in the city should be maintained. If a tram interchange is
necessary it should be at-grade and involve as short a walk as possible. Frequencies of all
services should be good enough that exact time keeping and connections are not
necessary.
MPKJ have to monitor the cost structure and ticketing should be totally integrated with
the rest of the public transport system.
All improvements to tram facilities should be designed with potential conversion in mind.
The release areas at the edge of Kajang may be suitable as it can be planned for from the
beginning. This would be dependent on the population density being high enough to
support a line, and that tram would take people to at least a major centre without having
to change.
5.2 RESPONSIBILITIES OF INNOVATIVE RESEARCH PARK PROJECT
The innovative research park project in the city should be maintained.
There are many possible improvements.
Promoters are the entrepreneurs who take the full risk of the concert. They can be local
(meaning they work only in one city or area), regional (several states), national or
international. If they lose, they can lose big, but as acts get more successful they squeeze
them and limit the promoter's upside. The result is a friendly game of "hide the pickle"
that promoters routinely play in rendering statements of how much has been earned.
6.0 PROS AND CONS OF INNOVATIVE RESEARCH PARK PRIVATIZATION
6.1 PROS OF PROVATIZATION
 Privatisation places the risk in the hands of business or Private Enterprise.
 Private enterprise is more responsive to customer complaints and innovation.
 The Government should not be a player and an umpire.
 Privatisation provides a one off cash boost for Government.
 Privatisation leads to lower prices and greater supply.
 Competition in privatization increases differentiation.
6.2 CONS OF PRIVATIZATION
 Privatisation is expensive and generates a lot of income in fees for specialist advisers
such as banks.
 Public monopolies have been turned into private monopolies with too little
competition, so consumers have not benefited as much as had been hoped. This is the
main reason why it has been necessary to create regulators This is an important point.
It partly depends on how the privatisation took place. For example, the railways were
privatised in bit of a rush and there might have been other ways to do it so that more
competition was created. It partly depends on the market. Some markets are 'natural
monopolies' where competition is difficult. For example, it would be very wasteful
and expensive to build two sets of track into Liverpool Street just to create some
competition. Natural monopolies create a special justification for public ownership in
the general public interest.
 The nationalised industries were sold off too quickly and too cheaply. With patience a
better price could have been had with more beneficial results on the government's
revenue. In almost all cases the share prices rose sharply as soon as dealing began
after privatisation.
 The privatised businesses have sold off or closed down unprofitable parts of the
business (as businesses normally do) and so services eg transport in rural areas have
got worse.
 Wider share ownership did not really happen as many small investors took their
profits and didn't buy anything else.

More Related Content

What's hot

Public private partnerships
Public private partnershipsPublic private partnerships
Public private partnershipspasicUganda
 
Introduction to Public Private Partnerships (PPP’s) - June 2010
Introduction to Public Private Partnerships (PPP’s) - June 2010Introduction to Public Private Partnerships (PPP’s) - June 2010
Introduction to Public Private Partnerships (PPP’s) - June 2010Loay Ghazaleh MBA, BSc Civil Eng.
 
International logistics case study
International logistics case studyInternational logistics case study
International logistics case studyAFSAL TI
 
1 ppp presentation
1 ppp presentation1 ppp presentation
1 ppp presentationIvan-Cavric
 
Open contracting presentation in Tanzania: Extraction Sector
Open contracting  presentation in Tanzania: Extraction SectorOpen contracting  presentation in Tanzania: Extraction Sector
Open contracting presentation in Tanzania: Extraction SectorGeorge N. Mwita, PhD
 
Public-Private Partnerships - Business & Legal Issues
Public-Private Partnerships - Business & Legal IssuesPublic-Private Partnerships - Business & Legal Issues
Public-Private Partnerships - Business & Legal IssuesLou Milrad
 
Public Private Partnership
Public Private Partnership Public Private Partnership
Public Private Partnership Peter Parycek
 
Spectrum to Coal Scams
Spectrum to Coal ScamsSpectrum to Coal Scams
Spectrum to Coal ScamsShantanu Basu
 
Public Private Patnership
Public Private Patnership Public Private Patnership
Public Private Patnership Sagar Srivastava
 
Public private partnership
Public private partnershipPublic private partnership
Public private partnershipDivyajit Kumar
 

What's hot (14)

Public private partnerships
Public private partnershipsPublic private partnerships
Public private partnerships
 
Public private partnerships in India
Public private partnerships in IndiaPublic private partnerships in India
Public private partnerships in India
 
Introduction to Public Private Partnerships (PPP’s) - June 2010
Introduction to Public Private Partnerships (PPP’s) - June 2010Introduction to Public Private Partnerships (PPP’s) - June 2010
Introduction to Public Private Partnerships (PPP’s) - June 2010
 
FINAL PROJECT
FINAL PROJECTFINAL PROJECT
FINAL PROJECT
 
International logistics case study
International logistics case studyInternational logistics case study
International logistics case study
 
public private partnership
 public private partnership public private partnership
public private partnership
 
1 ppp presentation
1 ppp presentation1 ppp presentation
1 ppp presentation
 
Open contracting presentation in Tanzania: Extraction Sector
Open contracting  presentation in Tanzania: Extraction SectorOpen contracting  presentation in Tanzania: Extraction Sector
Open contracting presentation in Tanzania: Extraction Sector
 
Public-Private Partnerships - Business & Legal Issues
Public-Private Partnerships - Business & Legal IssuesPublic-Private Partnerships - Business & Legal Issues
Public-Private Partnerships - Business & Legal Issues
 
Public Private Partnership
Public Private Partnership Public Private Partnership
Public Private Partnership
 
Spectrum to Coal Scams
Spectrum to Coal ScamsSpectrum to Coal Scams
Spectrum to Coal Scams
 
Public Private Patnership
Public Private Patnership Public Private Patnership
Public Private Patnership
 
Public private partnership
Public private partnershipPublic private partnership
Public private partnership
 
The Texxi Mission
The Texxi MissionThe Texxi Mission
The Texxi Mission
 

Similar to Privatisation

Privatization
PrivatizationPrivatization
Privatizationselamat91
 
THE SIMPLE MICROECONOMICS OF PUBLIC-PRIVATE PARTNERSHIPS.pdf
THE SIMPLE MICROECONOMICS OF PUBLIC-PRIVATE PARTNERSHIPS.pdfTHE SIMPLE MICROECONOMICS OF PUBLIC-PRIVATE PARTNERSHIPS.pdf
THE SIMPLE MICROECONOMICS OF PUBLIC-PRIVATE PARTNERSHIPS.pdfDeepak Jha
 
208 - Geopolitics & World Economic Systems unit3
208 - Geopolitics & World Economic Systems unit3208 - Geopolitics & World Economic Systems unit3
208 - Geopolitics & World Economic Systems unit3ASM's IBMR- Chinchwad
 
Social equity in infrastructure
Social equity in infrastructureSocial equity in infrastructure
Social equity in infrastructureParth Joshi
 
ASSESSING THE RELEVANCE OF QUANTITY SURVEYORS IN PUBLIC PRIVATE PARTNERSHIP I...
ASSESSING THE RELEVANCE OF QUANTITY SURVEYORS IN PUBLIC PRIVATE PARTNERSHIP I...ASSESSING THE RELEVANCE OF QUANTITY SURVEYORS IN PUBLIC PRIVATE PARTNERSHIP I...
ASSESSING THE RELEVANCE OF QUANTITY SURVEYORS IN PUBLIC PRIVATE PARTNERSHIP I...Audrey Britton
 
UNDERSTANDING_PPPs.pdf
UNDERSTANDING_PPPs.pdfUNDERSTANDING_PPPs.pdf
UNDERSTANDING_PPPs.pdfAlkaPandya5
 
Public Private Partnership: Specific Characteristics in Different Sectors
Public Private Partnership: Specific Characteristics in Different Sectors Public Private Partnership: Specific Characteristics in Different Sectors
Public Private Partnership: Specific Characteristics in Different Sectors SilvaSuvahRaisa
 
Pgpm14 infrastructure development
Pgpm14 infrastructure developmentPgpm14 infrastructure development
Pgpm14 infrastructure developmentsakariya88
 
Place of Power Sector in Public-Private Partnership: A Veritable Tool to Prom...
Place of Power Sector in Public-Private Partnership: A Veritable Tool to Prom...Place of Power Sector in Public-Private Partnership: A Veritable Tool to Prom...
Place of Power Sector in Public-Private Partnership: A Veritable Tool to Prom...IJMERJOURNAL
 
Chapter1 PPPs: An Overview
Chapter1   PPPs: An OverviewChapter1   PPPs: An Overview
Chapter1 PPPs: An OverviewGowri Sundaresan
 

Similar to Privatisation (20)

Task 3
Task 3Task 3
Task 3
 
Privatization
PrivatizationPrivatization
Privatization
 
THE SIMPLE MICROECONOMICS OF PUBLIC-PRIVATE PARTNERSHIPS.pdf
THE SIMPLE MICROECONOMICS OF PUBLIC-PRIVATE PARTNERSHIPS.pdfTHE SIMPLE MICROECONOMICS OF PUBLIC-PRIVATE PARTNERSHIPS.pdf
THE SIMPLE MICROECONOMICS OF PUBLIC-PRIVATE PARTNERSHIPS.pdf
 
208 - Geopolitics & World Economic Systems unit3
208 - Geopolitics & World Economic Systems unit3208 - Geopolitics & World Economic Systems unit3
208 - Geopolitics & World Economic Systems unit3
 
Social equity in infrastructure
Social equity in infrastructureSocial equity in infrastructure
Social equity in infrastructure
 
ASSESSING THE RELEVANCE OF QUANTITY SURVEYORS IN PUBLIC PRIVATE PARTNERSHIP I...
ASSESSING THE RELEVANCE OF QUANTITY SURVEYORS IN PUBLIC PRIVATE PARTNERSHIP I...ASSESSING THE RELEVANCE OF QUANTITY SURVEYORS IN PUBLIC PRIVATE PARTNERSHIP I...
ASSESSING THE RELEVANCE OF QUANTITY SURVEYORS IN PUBLIC PRIVATE PARTNERSHIP I...
 
UNDERSTANDING_PPPs.pdf
UNDERSTANDING_PPPs.pdfUNDERSTANDING_PPPs.pdf
UNDERSTANDING_PPPs.pdf
 
Public Private Partnership: Specific Characteristics in Different Sectors
Public Private Partnership: Specific Characteristics in Different Sectors Public Private Partnership: Specific Characteristics in Different Sectors
Public Private Partnership: Specific Characteristics in Different Sectors
 
Pgpm14 infrastructure development
Pgpm14 infrastructure developmentPgpm14 infrastructure development
Pgpm14 infrastructure development
 
Privatisation
PrivatisationPrivatisation
Privatisation
 
Place of Power Sector in Public-Private Partnership: A Veritable Tool to Prom...
Place of Power Sector in Public-Private Partnership: A Veritable Tool to Prom...Place of Power Sector in Public-Private Partnership: A Veritable Tool to Prom...
Place of Power Sector in Public-Private Partnership: A Veritable Tool to Prom...
 
Task 3
Task 3Task 3
Task 3
 
Task 3
Task 3Task 3
Task 3
 
Abt ppp
Abt pppAbt ppp
Abt ppp
 
C0362021025
C0362021025C0362021025
C0362021025
 
Servbond.mk.pdf
Servbond.mk.pdfServbond.mk.pdf
Servbond.mk.pdf
 
Chapter1 PPPs: An Overview
Chapter1   PPPs: An OverviewChapter1   PPPs: An Overview
Chapter1 PPPs: An Overview
 
Ppp Guide
Ppp GuidePpp Guide
Ppp Guide
 
Ppp Guide
Ppp GuidePpp Guide
Ppp Guide
 
Ppp Guide
Ppp GuidePpp Guide
Ppp Guide
 

Recently uploaded

Scanning the Internet for External Cloud Exposures via SSL Certs
Scanning the Internet for External Cloud Exposures via SSL CertsScanning the Internet for External Cloud Exposures via SSL Certs
Scanning the Internet for External Cloud Exposures via SSL CertsRizwan Syed
 
The Fit for Passkeys for Employee and Consumer Sign-ins: FIDO Paris Seminar.pptx
The Fit for Passkeys for Employee and Consumer Sign-ins: FIDO Paris Seminar.pptxThe Fit for Passkeys for Employee and Consumer Sign-ins: FIDO Paris Seminar.pptx
The Fit for Passkeys for Employee and Consumer Sign-ins: FIDO Paris Seminar.pptxLoriGlavin3
 
Developer Data Modeling Mistakes: From Postgres to NoSQL
Developer Data Modeling Mistakes: From Postgres to NoSQLDeveloper Data Modeling Mistakes: From Postgres to NoSQL
Developer Data Modeling Mistakes: From Postgres to NoSQLScyllaDB
 
DevoxxFR 2024 Reproducible Builds with Apache Maven
DevoxxFR 2024 Reproducible Builds with Apache MavenDevoxxFR 2024 Reproducible Builds with Apache Maven
DevoxxFR 2024 Reproducible Builds with Apache MavenHervé Boutemy
 
SALESFORCE EDUCATION CLOUD | FEXLE SERVICES
SALESFORCE EDUCATION CLOUD | FEXLE SERVICESSALESFORCE EDUCATION CLOUD | FEXLE SERVICES
SALESFORCE EDUCATION CLOUD | FEXLE SERVICESmohitsingh558521
 
New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024
New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024
New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024BookNet Canada
 
Gen AI in Business - Global Trends Report 2024.pdf
Gen AI in Business - Global Trends Report 2024.pdfGen AI in Business - Global Trends Report 2024.pdf
Gen AI in Business - Global Trends Report 2024.pdfAddepto
 
DevEX - reference for building teams, processes, and platforms
DevEX - reference for building teams, processes, and platformsDevEX - reference for building teams, processes, and platforms
DevEX - reference for building teams, processes, and platformsSergiu Bodiu
 
SAP Build Work Zone - Overview L2-L3.pptx
SAP Build Work Zone - Overview L2-L3.pptxSAP Build Work Zone - Overview L2-L3.pptx
SAP Build Work Zone - Overview L2-L3.pptxNavinnSomaal
 
What is DBT - The Ultimate Data Build Tool.pdf
What is DBT - The Ultimate Data Build Tool.pdfWhat is DBT - The Ultimate Data Build Tool.pdf
What is DBT - The Ultimate Data Build Tool.pdfMounikaPolabathina
 
Moving Beyond Passwords: FIDO Paris Seminar.pdf
Moving Beyond Passwords: FIDO Paris Seminar.pdfMoving Beyond Passwords: FIDO Paris Seminar.pdf
Moving Beyond Passwords: FIDO Paris Seminar.pdfLoriGlavin3
 
Are Multi-Cloud and Serverless Good or Bad?
Are Multi-Cloud and Serverless Good or Bad?Are Multi-Cloud and Serverless Good or Bad?
Are Multi-Cloud and Serverless Good or Bad?Mattias Andersson
 
How to write a Business Continuity Plan
How to write a Business Continuity PlanHow to write a Business Continuity Plan
How to write a Business Continuity PlanDatabarracks
 
Generative AI for Technical Writer or Information Developers
Generative AI for Technical Writer or Information DevelopersGenerative AI for Technical Writer or Information Developers
Generative AI for Technical Writer or Information DevelopersRaghuram Pandurangan
 
Hyperautomation and AI/ML: A Strategy for Digital Transformation Success.pdf
Hyperautomation and AI/ML: A Strategy for Digital Transformation Success.pdfHyperautomation and AI/ML: A Strategy for Digital Transformation Success.pdf
Hyperautomation and AI/ML: A Strategy for Digital Transformation Success.pdfPrecisely
 
Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024BookNet Canada
 
Passkey Providers and Enabling Portability: FIDO Paris Seminar.pptx
Passkey Providers and Enabling Portability: FIDO Paris Seminar.pptxPasskey Providers and Enabling Portability: FIDO Paris Seminar.pptx
Passkey Providers and Enabling Portability: FIDO Paris Seminar.pptxLoriGlavin3
 
Transcript: New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024
Transcript: New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024Transcript: New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024
Transcript: New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024BookNet Canada
 
Digital Identity is Under Attack: FIDO Paris Seminar.pptx
Digital Identity is Under Attack: FIDO Paris Seminar.pptxDigital Identity is Under Attack: FIDO Paris Seminar.pptx
Digital Identity is Under Attack: FIDO Paris Seminar.pptxLoriGlavin3
 
Advanced Computer Architecture – An Introduction
Advanced Computer Architecture – An IntroductionAdvanced Computer Architecture – An Introduction
Advanced Computer Architecture – An IntroductionDilum Bandara
 

Recently uploaded (20)

Scanning the Internet for External Cloud Exposures via SSL Certs
Scanning the Internet for External Cloud Exposures via SSL CertsScanning the Internet for External Cloud Exposures via SSL Certs
Scanning the Internet for External Cloud Exposures via SSL Certs
 
The Fit for Passkeys for Employee and Consumer Sign-ins: FIDO Paris Seminar.pptx
The Fit for Passkeys for Employee and Consumer Sign-ins: FIDO Paris Seminar.pptxThe Fit for Passkeys for Employee and Consumer Sign-ins: FIDO Paris Seminar.pptx
The Fit for Passkeys for Employee and Consumer Sign-ins: FIDO Paris Seminar.pptx
 
Developer Data Modeling Mistakes: From Postgres to NoSQL
Developer Data Modeling Mistakes: From Postgres to NoSQLDeveloper Data Modeling Mistakes: From Postgres to NoSQL
Developer Data Modeling Mistakes: From Postgres to NoSQL
 
DevoxxFR 2024 Reproducible Builds with Apache Maven
DevoxxFR 2024 Reproducible Builds with Apache MavenDevoxxFR 2024 Reproducible Builds with Apache Maven
DevoxxFR 2024 Reproducible Builds with Apache Maven
 
SALESFORCE EDUCATION CLOUD | FEXLE SERVICES
SALESFORCE EDUCATION CLOUD | FEXLE SERVICESSALESFORCE EDUCATION CLOUD | FEXLE SERVICES
SALESFORCE EDUCATION CLOUD | FEXLE SERVICES
 
New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024
New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024
New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024
 
Gen AI in Business - Global Trends Report 2024.pdf
Gen AI in Business - Global Trends Report 2024.pdfGen AI in Business - Global Trends Report 2024.pdf
Gen AI in Business - Global Trends Report 2024.pdf
 
DevEX - reference for building teams, processes, and platforms
DevEX - reference for building teams, processes, and platformsDevEX - reference for building teams, processes, and platforms
DevEX - reference for building teams, processes, and platforms
 
SAP Build Work Zone - Overview L2-L3.pptx
SAP Build Work Zone - Overview L2-L3.pptxSAP Build Work Zone - Overview L2-L3.pptx
SAP Build Work Zone - Overview L2-L3.pptx
 
What is DBT - The Ultimate Data Build Tool.pdf
What is DBT - The Ultimate Data Build Tool.pdfWhat is DBT - The Ultimate Data Build Tool.pdf
What is DBT - The Ultimate Data Build Tool.pdf
 
Moving Beyond Passwords: FIDO Paris Seminar.pdf
Moving Beyond Passwords: FIDO Paris Seminar.pdfMoving Beyond Passwords: FIDO Paris Seminar.pdf
Moving Beyond Passwords: FIDO Paris Seminar.pdf
 
Are Multi-Cloud and Serverless Good or Bad?
Are Multi-Cloud and Serverless Good or Bad?Are Multi-Cloud and Serverless Good or Bad?
Are Multi-Cloud and Serverless Good or Bad?
 
How to write a Business Continuity Plan
How to write a Business Continuity PlanHow to write a Business Continuity Plan
How to write a Business Continuity Plan
 
Generative AI for Technical Writer or Information Developers
Generative AI for Technical Writer or Information DevelopersGenerative AI for Technical Writer or Information Developers
Generative AI for Technical Writer or Information Developers
 
Hyperautomation and AI/ML: A Strategy for Digital Transformation Success.pdf
Hyperautomation and AI/ML: A Strategy for Digital Transformation Success.pdfHyperautomation and AI/ML: A Strategy for Digital Transformation Success.pdf
Hyperautomation and AI/ML: A Strategy for Digital Transformation Success.pdf
 
Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
 
Passkey Providers and Enabling Portability: FIDO Paris Seminar.pptx
Passkey Providers and Enabling Portability: FIDO Paris Seminar.pptxPasskey Providers and Enabling Portability: FIDO Paris Seminar.pptx
Passkey Providers and Enabling Portability: FIDO Paris Seminar.pptx
 
Transcript: New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024
Transcript: New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024Transcript: New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024
Transcript: New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024
 
Digital Identity is Under Attack: FIDO Paris Seminar.pptx
Digital Identity is Under Attack: FIDO Paris Seminar.pptxDigital Identity is Under Attack: FIDO Paris Seminar.pptx
Digital Identity is Under Attack: FIDO Paris Seminar.pptx
 
Advanced Computer Architecture – An Introduction
Advanced Computer Architecture – An IntroductionAdvanced Computer Architecture – An Introduction
Advanced Computer Architecture – An Introduction
 

Privatisation

  • 1. CIVIL & STRUCTURE DEPARTMENT FACULTY OF ENGINEERING & BUILT ENVIRONMENT THE NATIONAL UNIVERSITY OF MALAYSIA REPORT OF PROJECT SUSTAINABLE URBAN PLANNING SEMESTER II, SESSION 2012/2013 KKKH4284 SUSTAINABLE URBAN PLANNING Assignment Title: TASK 3 PRIVATISATION Lecturer: PROF. IR. DR. RIZA ARIQ ABDULLAH BIN O.K RAHMAT Group Member: NURSYAHIDA BINTI BAHARIN A128791
  • 2. 1.0 INTRODUCTION AND OVERVIEW OF PROJECT Kajang Municipality intends to redevelop the stadium into an Innovative Research Park. The park is intended to take advantage of a number of universities and research centres in Kajang area to turn the municipality into centre for innovative, high value added industries. However the administration is in no position to fund the proposed project. You are required to propose a viable solution to ensure the success of the project. Explain the responsibility of all parties involved in the project, the benefit of your proposal and the problem that might occur in the future. 2.0 BACKGROUND OF SUGGESTED SITE The center of Kajang is the bustling Old Town, where all the roads meet. Most of the colonial- era buildings were constructed around 1920s to 1930s. The architecture of these shophouses is a combination of traditional Chinese and European designs. The ground floor was used mostly for commercial activities and the upper floor as the family living quarter. One of Kajang's landmarks is Stadium Kajang which is situated in the heart of the town. It is near a popular hangout place among the locals named Haji Samuri, which is also home to the famous dish satay Kajang. People come from all over Malaysia to taste the satay here. The stadium can accommodate up to 5,000 people and is used throughout the year for the community soccer competitions. Stadium Kajang are often used for sports day and funfairs. Many football matches were held there in the 1960s and 1970s. The police, military and schools would have their sports day at the stadium as it had an eight-lane 400m running track. It was also often rented to funfair operators. During the pre-war era, it was just a field with grass tennis courts and a clubhouse. It was only fenced up during the 1980s. The Kajang Stadium has persevered through many decades and seen some important football matches. 3.0 CONCEPT OF PRIVATIZATION METHOD The term “privatization” refers to the process of private, usually for-profit businesses taking over the provision of public, government provided services. This includes contracting with or selling
  • 3. to private parties the functions or firms previously controlled or owned by governments. Privatization covers a wide spectrum of government operations, management, and ownership arrangements. Some types of privatization which may be considered. a. “Outsourcing” means that a government agency delegates some of its in-house operations or processes to a third party. It is a contracting transaction where the government agency purchases services from a private firm while keeping ownership and ultimate responsibility for the underlying processes. They inform the private firm of what they want and how they want the work performed. The private firm can be authorized to operate as well as redesign basic processes in order to ensure even greater cost and efficiency benefits. b. “Design, Build, Operate (DBO)” means negotiating a contract with a private firm for design and construction services with comprehensive operating agreements for new, expanded, or upgraded facilities. The project components are procured from the private sector in a single contract with financing secured by the public sector. From design through operation, these contracts can extend for periods of up to 20 years or more. c. “Public-Private Partnership” refers to a cooperative arrangement between a local government and a private organization in which both parties assume some responsibility for operating a program or service. Each party brings something to the arrangement that contributes to the operation of that particular service. d. “Asset Sale” means the sale of government-owned assets to private companies, such as the sale of water/wastewater and electric utility assets. Proponents of privatization often point to success stories which demonstrate cost savings, while opponents express concerns about accountability and undermining organized labor, which results in jobs without health, pension, and other benefits. The most common type of privatization is contracting out programs or services to a private company or another governmental entity to operate. The contracting government is still responsible for the service, but someone else actually provides the service. This is usually the most popular method of privatization that is accomplished through a Request for Proposal (RFP) process or an Invitation to Bid (ITB).
  • 4. In the RFP process, any and all qualified businesses may submit a proposal to the government agency that describes in detail how they would perform the particular service and for what cost. Through this competitive process, it is not necessarily the lowest cost that “wins” the contract, but that which demonstrates that a service can be both improved and operated more economically at the same time. An Invitation to Bid is the standard sealed competitive bid in which the lowest bidder usually gets the job. Contracts may take a variety of forms, including fixed price contracts, unit price contracts and cost plan contracts. They usually are quite detailed. It is important that a contractor can be held accountable for the performance of the service as desired by the government, and that the expectation of such performance is clearly defined. The contract should be capable of being terminated under pre-established conditions if necessary, and include options for the government in such a situation. There are typically more opportunities for privatization than local officials realize for solving problems involving government-owned assets, facility operations, services, debt structure, and other facilities and infrastructure. 4.0 OBJECTIVES OF PRIVATIZATION 5.0 RESPONSIBILITIES OF BOTH GOVERNMENT AND PRIVATE COMPANY IN PRIVATIZATION 5.1 RESPONSIBILITIES OF MPKJ MPKJ should always be planned as part of an integrated public transport system, not as a separate money-making venture. MPKJ should make sure that the tram lines should go where the demand is (present or planned), not where there is a disused railway line or other surplus land. Monitor of the tram service in the city should be maintained. If a tram interchange is necessary it should be at-grade and involve as short a walk as possible. Frequencies of all services should be good enough that exact time keeping and connections are not necessary.
  • 5. MPKJ have to monitor the cost structure and ticketing should be totally integrated with the rest of the public transport system. All improvements to tram facilities should be designed with potential conversion in mind. The release areas at the edge of Kajang may be suitable as it can be planned for from the beginning. This would be dependent on the population density being high enough to support a line, and that tram would take people to at least a major centre without having to change. 5.2 RESPONSIBILITIES OF INNOVATIVE RESEARCH PARK PROJECT The innovative research park project in the city should be maintained. There are many possible improvements. Promoters are the entrepreneurs who take the full risk of the concert. They can be local (meaning they work only in one city or area), regional (several states), national or international. If they lose, they can lose big, but as acts get more successful they squeeze them and limit the promoter's upside. The result is a friendly game of "hide the pickle" that promoters routinely play in rendering statements of how much has been earned. 6.0 PROS AND CONS OF INNOVATIVE RESEARCH PARK PRIVATIZATION 6.1 PROS OF PROVATIZATION  Privatisation places the risk in the hands of business or Private Enterprise.  Private enterprise is more responsive to customer complaints and innovation.  The Government should not be a player and an umpire.  Privatisation provides a one off cash boost for Government.  Privatisation leads to lower prices and greater supply.  Competition in privatization increases differentiation. 6.2 CONS OF PRIVATIZATION  Privatisation is expensive and generates a lot of income in fees for specialist advisers such as banks.
  • 6.  Public monopolies have been turned into private monopolies with too little competition, so consumers have not benefited as much as had been hoped. This is the main reason why it has been necessary to create regulators This is an important point. It partly depends on how the privatisation took place. For example, the railways were privatised in bit of a rush and there might have been other ways to do it so that more competition was created. It partly depends on the market. Some markets are 'natural monopolies' where competition is difficult. For example, it would be very wasteful and expensive to build two sets of track into Liverpool Street just to create some competition. Natural monopolies create a special justification for public ownership in the general public interest.  The nationalised industries were sold off too quickly and too cheaply. With patience a better price could have been had with more beneficial results on the government's revenue. In almost all cases the share prices rose sharply as soon as dealing began after privatisation.  The privatised businesses have sold off or closed down unprofitable parts of the business (as businesses normally do) and so services eg transport in rural areas have got worse.  Wider share ownership did not really happen as many small investors took their profits and didn't buy anything else.