Contents
Software.................................................................................................................................................6
System software...............................................................................................................................6
Application Software........................................................................................................................6
Product based and Project based..............................................................................................6
Software Testing...................................................................................................................................6
Software Testing Methods......................................................................................................................7
Manual Testing: ..................................................................................................................................7
Automation Testing ............................................................................................................................7
Roles and Responsibilities of a Functionality Test Engineer:..................................................................7
SDLC [system development life cycle] ....................................................................................................8
Common problems in SDLC:- ............................................................................................................11
SDLC Models:-.......................................................................................................................................12
Waterfall Model: -.............................................................................................................................12
Prototype Model:-.............................................................................................................................13
Incremental Model:- .........................................................................................................................14
RAD Model:-......................................................................................................................................15
Fish Model:- ......................................................................................................................................16
Static Testing: -..............................................................................................................................16
Dynamic Testing:-..........................................................................................................................16
Verification:- .................................................................................................................................16
Validation:-....................................................................................................................................17
V-Model: - .........................................................................................................................................17
Agile Model:-.....................................................................................................................................18
Quality management:-..........................................................................................................................19
Quality Assurance .............................................................................................................................19
Quality Control:-................................................................................................................................19
Testing Approaches:- ............................................................................................................................20
Exhaustive testing:-...........................................................................................................................20
Optimal Testing:-...............................................................................................................................20
Testing Methodologies .........................................................................................................................20
White Box testing:- ...........................................................................................................................20
2
Black Box Testing:- ............................................................................................................................20
Gray Box Testing:-.............................................................................................................................21
Testing levels in SDLC:- .........................................................................................................................21
Requirements Review:-.....................................................................................................................21
Design Review:-.................................................................................................................................21
Unit Testing:-.....................................................................................................................................22
Integration testing:-..........................................................................................................................23
Big Bang Theory:-..........................................................................................................................23
Incremental Approach:-................................................................................................................23
System Testing:-....................................................................................................................................26
Functionality Testing:-.......................................................................................................................26
Object properties coverage:-........................................................................................................27
Error Handling Coverage:-............................................................................................................27
I/P Domain coverage:- ..................................................................................................................27
Calculation coverage:-...................................................................................................................30
Database Coverage:-.....................................................................................................................30
Links coverage:-.............................................................................................................................31
Non – functionality Testing:-.............................................................................................................31
Graphical User Interface testing:-.................................................................................................31
Usability Testing:-..........................................................................................................................32
Performance testing: - ..................................................................................................................32
Security testing:- ...........................................................................................................................33
Recovery testing: - .....................................................................................................................34
Portability testing/compatibility testing:-..................................................................................34
Configuration testing: - ..............................................................................................................34
Installation testing: -...................................................................................................................34
Sanitation testing / Garbage testing:-......................................................................................35
Comparative testing/ parallel testing: -....................................................................................35
User acceptance testing: -................................................................................................................35
Alpha testing: -................................................................................................................................35
Beta testing: -..................................................................................................................................35
Some Other Testing Activities: - ......................................................................................................37
Sanity testing (build stable or not): -............................................................................................37
Ad-hoc testing: - .............................................................................................................................37
3
Exploratory testing: -......................................................................................................................37
Jump / Monkey: -............................................................................................................................38
Localization testing:-......................................................................................................................38
Internationalization testing: -.........................................................................................................38
Mutation testing (senior developer): -..........................................................................................38
Re- testing: -....................................................................................................................................38
Regression testing: -......................................................................................................................38
Maintenance testing:- ....................................................................................................................39
Software Testing Life Cycle..............................................................................................................40
Test initiation: - ...............................................................................................................................40
Test planning:-................................................................................................................................41
Components in Test Plan Document:-........................................................................................41
Test Case Design:- ........................................................................................................................44
Inputs to Derive Test cases:-....................................................................................................45
Fundamentals of Test Cases:-.................................................................................................46
Types of test cases:-..................................................................................................................46
Test Case Template:- ................................................................................................................47
Test Cases Review:-..................................................................................................................51
Requirement Traceability Matrix:-............................................................................................51
Test Execution:-..............................................................................................................................51
Test Set:- .....................................................................................................................................52
Test Execution Flow:- ................................................................................................................52
Level-o: Sanity/Smoke Test:- ...................................................................................................52
Level-1: Real Testing/Comprehensive Testing:- ...................................................................53
Level 2:Re& regression testing :-.............................................................................................53
Level3: Final Regression Testing:-.........................................................................................53
Defect Reporting:-..........................................................................................................................54
Defect Template:-.......................................................................................................................54
Defect life cycle: -.......................................................................................................................55
Test closure: - .................................................................................................................................57
Test cases for 1litere bottle. .............................................................................................................57
Test cases for 4 GB Pen drive .........................................................................................................57
Test cases for a Lift which allows maximum 6 persons ...............................................................58
4
5
6
Software
Set of instructions, programs document to perform the specific task.
Software can be categorized into two types
1. System software
2. Application software
System software
These soft wares are used to provide interface between the system components.
Ex: - All OS’s like windows, Linux,…etc.
Application Software
These are developed based on client business needs in order to perform their
activities
 In App s/w again divided into two types
Product based and Project based
a) Product based: - When we develop the application based on standard
requirements and that can be sell to any customer in the market
Ex: - Ms Word is a product of Microsoft,
QTP is a product of HP
b) Project based:-When we develop the application based on the specific client
requirements and that should be delivered that particular client only.
Ex:-www.constanza.com is a project for “constanza” client.
www.qaramu.com is a project for “Ramakrishna”
Software Testing It is a process to identify correctness, completeness and
measure quality of developed Software Application.
 S/W Testing will help to deliver reliable Application to the customer and it will
reduce maintenance cost of project.
 Objective of Software testing is to identify defects, when change defects
quality improves
Defect: - It is a deviation b/w expected result to the actual result in Application under
test
i) Defect can also be called bug or issue
Correctness: - Variable implemented functionality is working as per expectations or
not by performing operations
7
Completeness:- Verify all the client business needs or requirements are covered or
not in terms of the functionalities in this Application
In a simple S/W testing is a combination of verification and validation
Software Quality: - As per produces products (Development team) when App fulfilled
client with all the client requirements when he will say it is a qualify Application
As per client or customer and user point of view when App fit for use, according to
his business needs then we will say that is a quality Application.
Following are the major factors depends software quality:
1) Budget or cost 2) In time release 3) Reliability
i) Meet client requirements in terms
of functionality
ii) Meet client expectations
Software Testing Methods
In general organization follows 2 types of methods to validate application
1). Manual testing 2). Automation testing
Manual Testing: Without using any automation tools test engineer will verify actual
behaviour of App by performing the operations or transactions. For manual testing
test engineer will prepare test cases which are used to validate Applications
Advantage: - simple & easy
Disadvantages:-
 Time consuming [more time taken to execute]
 Human errors
Automation Testing: Automating the human activities [Test cases execution] in
order to validate Applications is called Automation Testing
Advantages: - 1) less time to execute 2) There is no possibility of human errors
Disadvantages: - 1) Automation tools are expensive 2) Skilled automation test
engineers are required
Roles and Responsibilities of a Functionality Test Engineer:
1) Analyse the client requirements [BRS& FRS]
2) Identify the test Scenario’s 3) Prepare Test cases
8
4) Develop Automation script
5) Review on Test cases & Automation Test script
6) Execution of Test cases and script
7) Defect Reporting
8) Retesting & regression testing
SDLC [system development life cycle]
It describes development process of a software project or product to fulfill
the client requirement with in the specified cost & time
Following are the phases involved in SDLC
1) Requirements collection
2) Requirement Analysis
3) Design
4) Coding
5) Testing
6) Release & maintenance
B. A Requirement collection BRS | URS | CRS |
Budget
B.A Feasibility study In Time
Reliability
SA Requirement Analysis FRS SRS
GUI Design doc
DA Design Data Base design doc
App design doc
Dev Coding S.C.Document
Developer Unit and Integration Testing (W.B.T)
QA Tester Testing System Testing (B.B.T)
Client User Acceptance Testing
Release and Maintenance
9
Here:-
BA ………….. Business analyst
SA …………… system Analyst
BRS ……………. Business requirement specification
DA …………… Design Architect
URS …………… User requirement specification
GUI …………. Graphical user interface
CRS …………… Client requirement specification
ADD/TDD ………..…. Application / technical design document
SRS/FRS ………….. System/Functional requirement specification
SCD ………….. Source code document
HLD ………….. High level design doc
LLD …………… Low level design doc
Requirements collection: - It is an initial activity performed in SDLC
In this phase B.A will collect requirements with an interaction of client and
collected requirements will be documented as BRSURSCRS
BRS: - It describes brief description of core logic of client business needs in terms of
who are the user for the Application & required services for those users in that
application
EX: - Online Banking
Admin
Banker
Customer
After preparation of BRS doc they perform feasibility study to
check project is acceptable or not in order to develop where as BA will play a key
role in feasibility study
Following are the factors analysed in feasibility study:-
1) Budget feasibility
2) Time feasibility
3) Requirements are reliable or not in terms of technology to develop
10
After feasibility study if project is acceptable then business analyst will
intimate to the client by releasing RFP and SLA documents.
Requirement Analysis:-
In the phase system analyst will analyse client business needs from BRS
based on that he will prepare detailed document called FRS/ SRS
FRS describes detailed functionality of each component like which date it
should accept & how the component should work
Design: - In this phase design Architect will design application architecture to fulfil
the client requirements which are specified at FRS. In this phase following are the
doc prepared by DA
1) GUI design doc
2) Data base Design Doc
3) Application Design Doc / TDD
i) GUI Design Doc :- It contains prototypes of an application
 Prototype will help to foresee the future implementation
of an application & better understandability of
functionalities
 Proto type is a sample application without functionality (
dummy screens )
 Prototypes are not mandatory for all projects
ii) Data base Design Doc :- It describes about database structure and
application in terms of no of tables relation b/w those tables & rules
implemented in database
iii) ADD/ Technical Design doc :- it contains 2 types of sub doc’s 1)
HLD 2) LLD
HLD: - It describes no of modules required for a project & relation
b/w those modules
Ex:- For a Hospital management system may contain following
modules.
HMS
Front
Desk
Regist
ration
Billing
Pharmacy
Clinical
chart
Patient
chart
11
Modularization: splitting the projects with set of modules for easy development of
application is called Modularization
Module: It is a some portion of application which have ssthe set of similar
requirements of functionalities
LLD: - There should be individual LLD for each module in order to develop the logic
while writing the programs
Note: - Design docs are important for developers in order to write the programs
Coding / Implementation: - In this phase developers will write the program using
programming language (for windows based application) or scripting languages (for
web based application)
O/p of this phase is source code document (s.c.doc)
Testing:- After completion of coding programs are available for execution. Initially
developers will perform unit test & integration testing using W.B.T (white box testing
techniques)
After that separate testing team will perform system testing using B.B.T (Black Box
Testing)
Then client also performs user acceptance testing
Release & Maintenance:-
Release: - After system testing & creating user acceptance testing on our work
product then we deliver application to the client for further use at live environment is
called “Release or Go live or Production
Maintenance: - while using the application client can identify some defects or he may
require some other functionality in the existing system then he will send change
request (C.R) to the development team
Based on initial agreement (SLA), CCB (change control board) will work on
change request
Common problems in SDLC:-
1) Poor Requirements:- when requirements are incomplete & not clear to
understand that will be a problem to develop the application
2) Unrealistic schedule :- If too much of work is crammed/ assigned in too little
time that will be a problem
3) Inadequate testing/ Incomplete testing :-
In present scenario it is difficult to estimate how much testing is sufficient
to validate application
12
4) Dynamic changes in requirement :- When client continuously sending
changes in requirements then that will be a problem
5) Miscommunication: - lack of communication b/w Developers , clients , DA ,
SA..Etc.
Defect repair cost with respect to SDLC phases:-
SDLC phases DRC
Requirement 0%
Design 10%
Coding 30%
Testing 50%
Maintenance 100%
Note: - Early stages identify the defects will take less cost to resolve compare to later
stages identified defects.
Note: - software testing will help to reduce maintenance cost for a project
SDLC Models:- Based on need of customer & complexity of requirement we can
adopt the anyone of the following SDLC models to develop the application
1) Water fall Model
2) Prototype Model
3) Incremental model
4) Spiral Model
5) RAD Model
6) Fish model
7) V model
8) Agile Model
Waterfall Model: -
This model is also called as linear sequential waterfall model
This model is preferable for “small” projects which have “clear” requirements
In this model entire system or application developed in sequential i.e. If one
phase is completed, then they start next phase
13
Waterfall Model
Advantages: - It is easy & simple to develop application
Disadvantages; - This model is not suitable for dynamic changes in the requirement
And early stages identifying defects is not possible.
Prototype Model:-
Prototype:- It is a sample application without functionality(Dummy screens)
If Client not Demo to
satisfy Client
If client satisfied
Requirements Collection
Requirements Analysis
Design
Coding
Testing
Release & Maintenance
Requirements Collection
Requirements Analysis
Design
Develop Prototypes
Client Evaluation
Collect Feedback
Refine Requirements
Coding
Testing
Release&Maintaince
14
 Prototype model is preferable when requirements are not clear or in complete.
 In this model based on initial requirements we develop prototype which are
given presentation to the customer based on client satisfaction we develop
the application.
Advantages: - In this model we can get complete requirements from client before
actual coding using prototype.
Disadvantage:-It is not reusable & developing prototype is an additional activity for
developers.
Incremental Model:-
 This Model is preferable for big projects which have the risk to develop
Sequential approach.
 In this approach application is divided into modules & then they developed
and tested and delivered to the client module by module.
 Whereas the first module are implemented should be a core functionality
of the system
Requirements For Notepad:-
1.0 File Menu
11.0 Basic File Menu option
1.1.1Page setup and Print
2.0 Edit Menu
2.1.0 Basic Edit Menu Option
2.1.1 Find Replace Under
3.0 View menu
4.0.0 Format
5.0 Help.
Advantages:-
 Risk management is easy.
 Early stages of application implementation and deliverables are possible.
Disadvantages:-
 It is an open ended SDLC Model there is no fixed deadlines to complete
whole project.
1.1.0
2.1.0
D C T R
1.1.1
2.1.1
D C T R
3.0
4.0
D C T R
15
Spiral Model:-
 This model is preferable for which projects successful implementation,
estimations are not possible at early stages.
 It is used for research applications and machine criticality applications
Spiral Model
 In this approach application developed like in incremental model
whereas early stages deliverable are not possible
Advantages:-
 Less possibility defects in the final product.
 Less resource is required to develop the application
Disadvantages:-
 Time consuming process(5 to 10 years)
RAD Model:-
 This model is suitable when client required whole system (or) application in an
extremely short span of time like 60-90 days.
 In this approach we use already existing predefined functionality components
from other environment.
Advantages:-
 Possibility to deliver application in short time of span.
Disadvantages:-
 Required predefined components may not available
M1 R.A
DC
T
M2 R.A
D
C
T
M3
R.A
D
16
 Application environment may not supported existing predefined projects.
Fish Model:-
 It is not a practical approach to develop the applications
 It describes theoretical mapping b/w development activities to testing
activities.
R.A Design Coding R&M
Sy.T
R.c{B.R.S} {F.R.S} {T.D.D} {S.C.D}
Review Review W.B.T B.B.T C.R
Static Testing: - It is a process of finding mistakes without execution of programs.
Dynamic Testing:-It is the process of finding mistakes with execution times of
programs (or) app’s.
Verification:-It is the process to check are we developing product right or not.
 It is a static testing approach.
 In General verification performed on requirements documents {B.R.S and
F.R.S}, Design Doc,Source code, test plan doc, test cases……etc.
Following are the verification techniques:-
 Peer Review
 walkthrough
 Inspection
Peer Review:-
 It is an informal meeting
 Author will deliver document to reviewer to identify any mistakes
Walkthrough:-
17
 It is a semi informal meeting with 2 to 3 members
 In this meeting author will explain about document to reviewers
Inspection:-
 It is a formalized meeting with 5 to 6 members
 In this meeting following members involved.
Author: - Owner of the document
Reviewer/Inspector: - The person responsible to identify mistakes
Presenter: - Who explains about the document to reviewers.
Recorder/Scribe: - Who will prepare meeting note.
Moderator: - Manager of the meeting.
Validation:-
 It is a process to check developed product right or not?
 In general it is performed on application source code and functionalities.
Following are the Validation Techniques:-
 Unit testing
 Integration testing
 Functionality testing…..etc.
V-Model: - V stands for verification & validation.
Requirements Collection
Requirements Analysis
H.L.D
L.L.D
Coding
Unit Test
Integration Test
t
System Testing
User Acceptance Testing
18
This model is suitable for big projects which have the clear requirements
 In general organizations prefer V-Model to develop application
 In this V-Model testing activity starts early stages with development
activities.
 Meeting point in v-model is “coding” on source code we can perform
verification and validation.
Advantages:- In this model early stages identifying mistakes is possible.
Disadvantages:-In this model app developed in sequential approach due to that it is
not suitable to handle dynamic changes in the requirement.
Agile Model:-
 In this model client closely associated with development team.
 In this model application developed like in incremental modelwhereas after
implementation of each feature (or) unit or component that will be delivered
testing team and client time to get approval before we plan for next
component (or) unit.
 In this model within a week (or) 2 weeks we expect deliverables to client
Collect feedback
Client Requirements
Unit/component
Implemented
Testing UAT
Approved then plan
for next
Unit/component
Testing UAT
19
Advantages:-
 This model is suitable to handle dynamic changes in the requirement.
 We can deliver reliable application to the customer
Disadvantages:-
 Planning the different team activity is difficult to task.
Quality management:-
It is a Process of preventing the defects while developing the application & to ensure
there are no defects in the final product.
Following are the terms involved in Quality management
 Quality Assurance
 Quality control
Quality Assurance
This team involves throughout SDLC to define process, monitor strength of
development process& to provide suggestions to improve the development process.
In this team management persons involved like project manager, Test manager,
domain experts…….etc.
Quality Control:-
This team is responsible to identify any defects in final product and to solve those
defects before deliver application to the customer
Difference b/w QA &QC-
QA QC
------ ------
1. It is a process oriented 1. It is a product oriented
2. It involves throughout the SDLC 2.It involves after product is developed
3. It is a defects preventive approach 3.It is a defects detective approach
4. Reviews are the QA activities 4.S/W testing is example of QC
. activity
20
Testing Approaches:-
These are 2 types of approaches to validate app.
Exhaustive testing:-
 Testing the app with all possible combinations is called
“Exhaustive testing”
 In present scenario exhaustive testing is not possible
Optimal Testing:-
 Testing the app with best possible combinations is called “optimal
testing”
 In general we prefer optimal testing only
Testing Methodologies:-
To derive best possible test cases till achieve the completeness of testing in app
source code& functionally we testing methodologies.
There are 3 types of methodologies
1. White Box testing
2. Black Box testing (BBT)
3. Gray Box testing
White Box testing:-
 It is also called as “Glass Box Testing or Open/Clear testing or
Structural testing”
 WBT Techniques are used to validate source code of an app using
programming knowledge
 In general developers are used to following WBT techniques to
derive test cases for code coverage.
1) Statements coverage 2) Path (or) branch coverage
Black Box Testing:-
 It also called “Closed Box testing”
 Without any programming knowledge to validate app functionality using
requirement knowledge we use BBT Techniques
 Following are the BBT Techniques we use to derive test cases
 Boundary value Analysis
 Equivalence class partition
21
WBT BBT
 It is a design & structural > it is specification based testing
Based testing
 It is internal logic driven testing > It is business transaction
Driven testing
 It is for code coverage > It is for requirements coverage
Note: - lack of objective developers will validate only application source code they
are not responsible for requirements coverage, due to that organisation maintain
separate testing team for requirements coverage
Gray Box Testing:-
 it is a combination of WBT & BBT.
 To perform GBT the person should have programming knowledge&
complete requirements knowledge
 It can be developed by developers & test engineers
 It not provide complete code coverage & requirements coverage due to that
it’s not preferable
Testing levels in SDLC:-
1) Requirements review
2) Design review
3) Unit testing
4) Integration testing
5) System testing
6) User acceptance testing
Requirements Review:-
After preparation of required documents review will be conducted to analyse
following factors
a) All the client requirements covered (or) not
b) Recorded information is correct (or) not
c) Requirements are reliable (or)not to develop the app
d) Requirement are understandable (or)not
Design Review:-
After preparation of design document review will be conducted to analyse
following factors.
1) All the requirements covered (or) not in design
2) Design logic is correct or not
22
3) Design logic is understandable (or) not
NOTE;- For requirements review & Design review they use verification
techniques like peer review, walkthrough & Inspection.
Unit Testing:-
 It is an initial validation testing technique.
 Unit testing also called as “component/module testing”.
 After coding computer programs are available for execution In order to
validate, “Testing on individual component (or)unit within the app is called
“Unit Testing””
 It is performed by developers by using WBT techniques
Following are the factors they validate in the Unit Testing:-
1).Statements Coverage;-
Verify all the statements are participating (or) not at least once during runtime and
right techniques are used or not to avoid repeatable statements in the program.
Ex:- User defined functions, Sub programs……
2).Iterative or loop Statements Coverage:-
Verify loop statements are terminating as per expectations (or) not
Ex;-For loop, do while…….etc
3). Conditional statement coverage;-
 Verify we use right conditions inconditional statements or not
Ex;- if condition ,nested if,switch command…….etc.
4).Path/branch coverage:-
 Verify execution flow of the program based on condition true or false
5).Cyclomatic complexity:-
 It is a metric to measure no of independent paths required to execute a
program
No of paths=2(number of conditions)-1
23
Integration testing:-
 After unit testing in order to the system (or) app developers will connect
those individual modules or units or components
 “Verify interface (or) data communication or functionally b/w units (or)
components (or) modules is called Integration testing.”
 In general, all the module implementation at same time may not possible
whereas based on modules availability we using following approaches in
integration testing.
There are two types
1) Big Bang Theory 2) Incremental Approach
Big Bang Theory:-
This approach says when some of modules under development process
then we need to wait to until those modules are developed in order to
perform “Integration Testing”
Drawbacks:-
In this approach resource will be idle due to that in time release may not be possible
Incremental Approach:-
 This approach says based on availability of modules we can perform level by
level integration testing
 In this we use temporary programs like stub& driver when some of module
under development process.
Following are the approaches we use in Incremental integration testing;-
1) TOP-Down Approach
2) Bottom-up approach
3) Hybrid/sandwich approach
Top-down Approach:-
 In this approach we perform integration testing from main module to
available sub modules when some of sub modules under
development process
24
 In This approach we use stub
Top down Approach
Stub:-
It is a temporary program implemented by developers ,Itis used when sub module
under development process.
Bottom up Approach:-
In this approach we will perform integration testing from sub module to main
module when main module under development process.
Main
Sub1
Main
Stub
Main
Sub1 Sub2
Driver
25
Driver:-
It is a temporary program implemented by developers; it is used to main module
under development process.
In provides connection to sub modules.
DRIVER
-----------
1) It is a temporary program
2) When main module under development process then driver is used
3) It provide connection to the sub modules
4) Driver is a calling program
Stub
-------
1) It is also temporary program.
2) When sub module under development process then we use stub
3) It provide temporary result to main module
4) It is a called program
Hybrid/Sandwiched Approach:-
 When main module & some of sub modules under development process
then we verify available modules interface, we use stub & driver.
Sub1
Sub2
Driver
Main
Sub3
Sub4
Stub
26
There are 2-levels of Integration testing
Low –level Integrating Testing:-
When we verify interference with in the system (or) application component
is called “low-level integration testing”.
High-level Integration Testing:-
When we verify interference b/w different app’s is called “High-level
Integration Testing”.
Ex;- verify transactions in ICICI bank ATM centre using HDFC Bank Debit
card.
Note: - Integration testing can perform by developers and test engineers.
 Developers will perform integration testing after unit testing by WBT
 Test engineer will perform integration testing during system testing using BBT
technologies
System Testing:-
After unit test and Integration testing development team release build to the separate
team
 Build means set of integrated modules in excusable form(.exe files)
 After receiving initial stable build from developers test engines will perform
system testing
Def.:- “Validate whole system based on client requirements and expectations is
called “System Testing”
Following are the testing techniques are used in system Testing;-
1) Functionality Testing
2) Non- functionality testing
Functionality Testing:-
 It is also called as “requirements testing” In this test we validate application
functionality as per client business needs.
 Any type app’s functionality testing is mandatory, due to that organization
maintains separate functionality testing team.
27
Functionality testing can be performed manually (or) using some of the following
functionality testing tool.
Q.T.P -> H.P (2002)
Win Runner -> H.P (1994)
SILK -> BOARLAND
Rational robot -> IBM
Selenium -> Open source tool (true tool)
Following are factors to validate in functionality testing:-
Object properties coverage:-
 Verify application object properties are changing or not based on operations
performed on application.
EXS:-enable,disable,items count….etc.
Error Handling Coverage:-
 Verify app behaviour when we performed invalid operations
EX:-
 Application should provide Error messages, warning messages, pop-
up windows…..etc.
 Verify login window providing any error messages when we
performed invalid operations.
I/P Domain coverage:-
Verify I/P objects are accepting customer expected data (or) not like edit (or)text
boxes
Ex;- verify I/P objects are accepting customer expected data (or) not like edit (or)
text boxes
Ex;- Verify “name” edit box should allow Alphanumeric from 4-16 characters.
Note:-Test engineer is responsible to drive test data in order to validate application
To derive best possible test data we using following BBT techniques
1) Boundary value Analysis (BVA)
28
2) Equivalence class partition (ECP)
Boundary value Analysis (BVA):-
 This technique is used to validate i/p condition in terms of range (or) size
 This technique says there will be 3 possible conditions to validate, possible
conditions are
Note:-
 In general there will be high possibility of error in and around the boundary
condition, those we can identify with these techniques.
 When boundary conditions are correct for a ip object then it will accept within
the specified rangesize.
Ex:-Prepare text data using BVA for a “name” text box which should allow 4-16
characters.
BVA(Size)
Min ………… 4 = Valid
Max ………… 16 = Valid
Min-1 ………… 3 = Invalid
Max-1 ………… 15 = Valid
Min+1 ………… 5 = Valid
Max+1 ………….. 17 = Invalid
Ex:-Prepare text data for a “Mobile No “edit box which should allow only 10
digit number where as starting digit should be ‘9’.
Minimum Maximum
Minimum-1 Maximum-1
Minimum + 1 Maximum +1
29
BVA(Size)
Min ………… 9000000000 = Valid
Max ………… 9999999999 = Valid
Min-1 ………… 8999999999 = Invalid
Max-1 ………… 9999999998 = Valid
Min+1 ………… 9000000001 = Valid
Max+1 ………….. 1ooooooooo = Invalid
Disadvantages;-
 With this technique it is not possible to validate for data type for i/p object
like alphabet, numeric, special characters…..etc.
 With this technique we can validate i/p condition with only boundary values
& their adjacent values (i.e. middle values are not possible to test)
Equivalence class partition (ECP):-
This technique is used to validate i/p condition in terms of data types.
 This technique says divide test data into equivalence classes & take some
Sample data from each class to validate i/p condition.
Classes are
Valid
Invalid
Ex;- Prepare test data to validate withdraw condition for ATM which allows from 100
to 20,000 where amount should multiples of 100.
Valid Invalid
100<=Amount<=20,000/-
{Amount should be multiples of 100}
Amount<100,Amount>20,000/-
{Amount which is not multiples of 100}
30
EX:-Prepare test data to validate “Name” edit box which should allow alphanumeric.
ECP(Data Type)
Valid Invalid
a-z
A-Z
0-9
All special characters
 Verify “Name” edit box valid test data {combination of valid size from BVA &
valid data type from ECP}
 Verify name Edit with invalid test data {combination of invalid size from BVA
& valid data type from ECP}
Ex:- m09bnsbf45645 Ex:- fdcxbn@345(Invalid)
Calculation coverage:-
“Verify application generates expected o/p values (or) not based on given i/p data”.
Ex:-Verify calculation coverage on fight reservation app for 5th
order no record.
Database Coverage:-
Application Front End
S.No Emp.
name
Emp.
Dept
Date
of
JngEmp.Reg
Emp.Name :
Emp.Dept :
Date of Jng :
Submit DeleteUpdate
Data Base
31
 Verify database content with respect to operations performed on app front
end like submit/INSERT/update & delete operations
 In this test we also verify the relation b/w frontend objects to database
fields.
Note:-
 To find database structure for an app we refer database design
document
To validate database content we should get permission from DBA.
Links coverage:-
Verify implemented links are working correct or not in web based apps like
image links, test links, broken links……etc.
Non – functionality Testing:-
Based on customer Exceptions we validate non functionality factors using following
testing techniques.
 Graphical User Interface testing.
 Usability testing
 Performance testing
 Security testing
 Recovery testing
 Compatibility testing
 Configuration testing
 Installation testing
 Sanitation testing
 Comparative testing
Graphical User Interface testing:-
In this test to verify factors which are related to look & feel of an application
Following are factors related to user interface
a) Availability of components
b) Font size or font style
c) Controls spelling
d) Controls visibility
e) Back ground colour of screen
f) Clarity of image objects like logos, graphs….etc.
32
Usability Testing:-
“In this test to verify user friendliness of an application to perform operations
(ease of use)“
Following are factors related to usability test:-
a) Error messages are meaningful or not
b) Function keys implementation
c) Combination keys implementation (ctrl+p)
d) Short navigations
e) Tab implementations
Performance testing: -
After functionality testing separate testing team will conduct PT. In general
organization maintain separate PT team where they do PT
Using following performance testing tools
 Load runner
 Silk performer
 Web load
 Rational robot performer
Following are the techniques are used in performance testing
a) Load / Scalability
b) Stress testing
c) Soak / endurance testing
d) Data volume testing
Load testing:-
 In this test we verify application allow customer expected load (concurrent
users) on customer expected configuration system or not
 In this test we use with in the load limit to estimate performance of an
application
Stress Testing: -
 In this test we verify the peak limit of concurrent user to perform
operations on application
 In this test we use beyond the load limit
33
Endurance test: -
 In this test we verify how much time continuously we can perform
transactions on an application
Data volume testing: -
 To verify how much data we can transfer in a specified time in terms of
kilobytes for second
Security testing:-
In this to verify privacy for end-user transactions in the application
Following are factors we validate in security testing
Authorization / Authentication: -
 Verify app allows valid users & preventing invalid users or not
Access control: -
 Verify app providing right services or not based on type of user
Session id: -
 It is a dynamic value generated in application server when we login the
application
Verify session id will expire or not in following scenario
 When system or application is ideal for some time after login the
application
 When we log out application
 When we click on back arrow in browser after login
Cookies: -
 These are temporary files created in the local system when we access the
application
 Verify cookies will expire or not when we close the application
34
Recovery testing: -
Verify how well application able to recover from abnormal state to normal state
Normal state
Abnormal state
Recovery procedures
Normal state
Note: - Based on expected interruptions developers will create recovery procedures
Ex: - Verify recovery copy mechanism for Ms Word application when system
suddenly restarted
Portability testing/compatibility testing:-
Verify application support customer expected operating systems, network
environment, compilers.
In compatibility test we use following testing techniques
Forward CT: - Verify application support higher version OS & browsers
Backward CT: - Verify application support previous / lower versions of OS &
browsers
Configuration testing: -
 It is also called as hardware compatibility testing. In this test we verify
application able to support customer expected configuration systems or not
like RAM, HD….etc.
Installation testing: -
 In this test mainly we verify application able to install as for “Read me”
File guidelines or not
Following are the other factors which we verify in installation testing
a) Setup programs availability
b) During installation any user interface messages from application
c) How much memory space it occupied in hard disk
d) All the related files are copied or not
35
e) How many instances we can install application
f) Repair or uninstall programs availability
g) Application name in all programs list
h) Quick launch icon on desktop
Sanitation testing / Garbage testing:-
 In this test we verify any extra features are implemented in the
application, which are not specified in the user requirements
Note: - When we identify any extra features in application then we need to intimate to
the client based on his feedback we report to the developers.
Comparative testing/ parallel testing: -
 Comparing our product with other existing competitive products in the
market in order to identify strengths & weakness of our product is called
“comparative testing”
Based on customer expectations we can give some of the non-functionality
testing techniques
User acceptance testing: -
It is perform after system testing by client team
 The objective of UAT is to check application ready for release or not
 In UAT we use 2 types of testing techniques
1) Alpha testing
2) Beta testing
Alpha testing: -
It is performed at developer’s side in control environment, if any defects are identified
those are resolved immediately and should get approval from the client
Beta testing: -
It is performed at client side in uncontrolled environment, if any defects are identified
those will be recorded & sent to the developers
36
SOFTWARE TESTING
Verification (Static testing) Validation (Dynamic testing)
(Are we developing right product or not) [Are we developed product
. Right or not)
{Preview, Walk through, Inspection
Requirement review, Design review}
WBT BBT UAT
Developers Test Engineer Client
Programming knowledge requirements knowledge Business knowledge
Internal structures of app system testing App ready for release or not
[Code coverage]
Functionality testing
Unit testing integration testing Non-Functionality testing
(High & low level)
Big Bang
Incremental
Alpha test (Dev.-con) Beta test (Cl-Un)
37
Some Other Testing Activities: -
1) Sanity testing
2) Ad-hoc / Random testing
3) Exploratory testing
4) Jump/monkey testing
5) Localization testing
6) Internationalization testing
7) Mutation testing
8) Re- testing
9) Regression testing
10)Maintenance testing
Sanity testing (build stable or not): -
It is also called as build verification test or tester acceptance test or stability test or
Build acceptance test.
 It is an initial validation performed by testing team whenever build deployed
or installed at test environment
 In sanity test we validate major functionalities of an application with valid data
& navigational flow of an application to confirm build is stable or not, further
activities( i.e. test cases execution or detailed validation)
Note: - If sanity test failed we suspend test cases execution & we rejected the build
to developers
For a rejected build developing team will release Patch files to the test engineers
Ad-hoc testing: -
It is an informal testing activity without proper planning and documentation, It is
performed like test engineer using their previous experience
In following scenarios we can perform Ad-hoc testing: -
1) When requirement documents are not cleared
2) When we want to validate already tested application for confirmation
3) It is also called as Random testing
Exploratory testing: -
Due to lack of domain knowledge by learning application functionality test engineer
validate those functionality
38
Jump / Monkey: -
 Due to lack of time to validate major functionalities in the application.
 In this scenario we select test cases based on priority
Localization testing:-
In this test to verify application support customer expected local languages or not
Ex:- Verify WWW.google.co.in web application will support customer expected
Indian local languages or not
Internationalization testing: -
 In this test to verify app support international languages, currency and
time zone as for customer expectations
Mutation testing (senior developer): -
 It is performed by senior developer by changing logic in the program or
unit to estimate unit testing team performance
Note: - Defect seeding: - To estimate unit testing team efficiency, injecting known
defects is called “Defect seeding”
Re- testing: -
 It is performed on modified build to check defects are resolved or not
Note: - In sometimes when we validate same functionality with multiple set of test
data is also called as Re-testing activity
Ex: - Validity login functionality with multiple set of test data
Regression testing: -
 It is performed on modified build to find any side effects on existing
functionalities with respect to modifications
Following scenarios we perform regression testing: -
1) When defects are resolved in modified application (partial regression testing)
2) When new features are added in existing system based on change request
From client {complete regression testing}
39
{Regression testing}
{Re testing}
Defect Reporting
Re and Regression testing
Maintenance testing:-
 When new functionalities added in the system based on
change request ,those we validate in this testing
FRS T.E
Prepare
test cases
BuildDev.Tm
Passed Failed
Developers
Modified
Build
40
Software Testing Life Cycle
S/W testing is one of the phase in SDLC,whereas40% of activities performed
in testing of SDLC
 S/W testing is important to validate application in order to deliver reliable
application to the customer
 STLC describes set of activities performed by separate testing team in order
to validate application as for client requirements.
Following are the phases involved in STLC: -
a) Test initiation
b) Test planning
c) Test case design
d) Test execution
e) Defect reporting
f) Test closure
Test initiation: -
After getting a new project for testing test manager will initialize test activities by
preparing test strategy document
B.R.S & F.R.S
Organization {Standards
And available resources}
Test strategy: - It is an organization specific document which is prepared early
stages of project validation
 It describes testing approach, standards to be followed during testing &
available resources to validate application
Following factors analysed to prepare test strategy Documents:-
a) Application analysis using requirements documents like BRS & FRS
b) Organization standards like CMM levels
c) Available resources for Automation testing , defect reporting , configuration
management .
d) Risk analysis :-
i) Technology Risk: - Problems related to S/w & H/w
TM Test Initiation Test Strategy Doc
41
ii) Resource risk: - Availability of test engineers
iii) Support risk: - Availability of clarification team
iv) Scheduled Risk:- Factors which effect schedules to perform testing
. Activities
Test planning:-
In this phase test lead will responsible to prepare test plan document.
For any type of application a clear test plan document is mandatory for successful
validation of the application.
Test plan:-
 It is a build oriented document
 Build to build information may changes in test plan document i.e.
“Dynamic Document”
 It describes testing approaches, test environment, resources, test
engineer names, allocated task, schedule….. etc.
B.R.S & F.R.S
Test Strategy Doc
Build # N
Components in Test Plan Document:-
1) Title:- Name of the project.
Ex;-HDFC Bank System plan V1.0
2) History of the document:-
 It describes author of the test plan, when test plan document prepared,
when review conducted, who conducted review.
Introduction:-
a) Project overview:- It describes brief description about project
b) Purpose of test plan:- It describes core intension of testplan
TL Test planning Test Plan Document
42
c) Referred document:- It describes which documents are referred to prepared
test plan
 In general requirement documents are referred.
Ex: - HDFC BANK-BRS V1.0
HDFC BANK-FRS V1.0
d) Scope:-
1) In scope:- It describes possible testing activities under current test plan
document
2) Out of scope:- It describes which testing activities are not possible under
current test plan document
1) Features to be tested;-
It describes available module& functionally in current build to validate.
5) Features not to be tested: - It describes which modules & functionalities are not
required to validate in current build.
6) Entry Criteria and Exit Criteria:-
Entry criteria:- It describes when we can perform test cases execution for dynamic
testing
Following are the entry criteria conditions:-
 All the test cases should be prepared & reviewed
 Build should deployed (or) installed at test environment
 Build should pass sanity test
 Test sets (or)test suits should be prepared
 Test environment setup should be completed
Exit criteria:- It describes when we can stop testing.
Following are the exit criteria conditions:-
 All the test cases should be executed at least once
 certain % of test cases should passed(92-95)
 Defeats which are identified during execution those defects status should be
“closed” or “Differed”
 Budget &time constraints
 When UAT completed
43
7) Suspension & Resumption criteria:-
Suspension criteria:-
It describes when we can suspend of test execution activities
Following are the suspension criteria conditions:-
1) When build failed sanity test
2) When there is change request from the client
3) When there is a “showstopper/ fatal/critical defects”
Resumption criteria: -
It describes when we can resumed our test execution
Following are the resumption criteria conditions: -
 When patch is release for rejected build
 When requirements are refined based on change request acceptance
 When showstopper defects are resolved
8) Testing approach: -
It describes testing techniques to validate corresponding test factors
Ex: -
Sanity test to check stability of build
User interface testing to check look & feel of an application
Functionality testing to check application behaviour based on user operations
9) Roles& Responsibilities:-
It describes test engineers names & allocated task.
10) Test Deliverables:-
It describes which documents we need to prepare during testing & which we deliver
to the client
44
Ex:-
 Test cases review report
 Requirement traceability matrix (RTM)
 Defects profile
 Test summary report
Test Environment:-
 It is also called “Test bed”
 it describes S/W &H/W configuration in the system to perform test execution
 In general test environment will be designed based on client live environment
Risks & mitigations:-
It describes possible risks at test environment & solutions for those risks
Training needs:-
It describes required training sessions for testing team
Schedule:-
It describes time lines to perform each testing activity.
NOTE:-After preparing test plan document test lead will conduct review on test plan
document along with senior teat engineers, after review test plan document deliver to
the test engineers.
Test Case Design:-
In this phase test engineer is responsible to derive test cases for allocated module.
B.R.S & F.R.S
Use Case Doc
Test Scenarios
TE Test Case Design Test Case Design Doc
45
Test case:-
It consist set of steps (or) sequence of steps with the user action and
subsequent response from the system
 Test case describes validation procedure of the each functionality in the
system
 Every test case should have “Pre-Condition” (when to execute Tc)
Pre-condition:-
It describes things to ensure in AUT before execution of Test case [i.e. When to
execute Test case]
Ex:- 1) verify delete mail functionality in Gmail inbox
Precondition:-
There should be some mails exit in Gmail inbox
Ex:- To verify login validation
Precondition:-
There should be some existing users for that application.
Inputs to Derive Test cases:-
1) Requirements like BRS & FRS
2) Use Cases:-
 It is an optional document, when requirements are complex to understand
in FRS then they provide use cases for us.
 Use case describes functionality behaviour from user prospective in
terms of “Actors action” &“system response”
“Better under standbility of FRS we use cases”
3) Test scenario:-
“It describes functionality /Requirement /Test condition which we need to validate”
Note:-
Test scenarios are not mandatory for projects
Advantages of Test Scenarios:-
46
 Based on test scenario we can identify number of test cases need to be
drafted
 it will give the complete test coverage with the test cases
Note:- A scenario can have one (or) more test cases.
Difference among the use cases, test scenario, test case
Use Case Test Scenario Test Case
 It describes
the functionality
behavior
{How system
Should work}
 It describes the
test condition or
a requirement
to validate
{What to test}
 It describes the
Execution/validation
Procedure[How to
Test]
Fundamentals of Test Cases:-
 Every test case should be simple, easy and understandable
 There is no duplicate test cases
 Test cases should be consistent
Following are the Test case Design Techniques:-
 Boundary value analysis (range or size)
 Equivalence class partition (data type)
Error Guessing:-
 It is an experience based technique there is no specific format.
 In general Domain experts/Functionality expert will identify possible
number of test cases related to error guessing techniques.
Types of test cases:-
There can be 4 types of test cases
1) User interference TC’S:-
These tc’s are derived to verify look &feel of the application
Ex;- Availability of components, front size or front style… etc.
2) Usability Test cases:-
These TC’S are derived to verify user friendliness of app to perform
operations
47
Ex;- Error messages, tab implementation, function key implementation…etc.
3) Validation TC’S:-
 These TC’S are derived to validate application input object
 These also called as field level validation test cases
Ex:- List box, Edit box.
4) Functionality Test cases:-
These test cases are derived to validate application behaviour based on
user operations.
Ex:- Push button, image link, text link
Note:-
 Usability, uses interface and validation Tc’s will be part in functionality Tc’s
 based on functionality & validation there can be 2 types of Tc’s
Positive Test cases:-
Test cases which have the primary flow of events or +ve flow of events to
validate
Ex:- Test case with valid inputs
Negative Test cases:-
Test cases which have the –ve flow of events or alternative flow of events to
validate.
Test Case Template:-
 In general organizations maintain their own templates to derive test
cases.
 Template contains predefined components to prepare test case
Project: - Name of the project
Module: - Name of the module
Created by: - Name of the test engineer.
Created on: - On which date test cases are derived.
Reviewed By: - Person responsible to conduct review on Test cases.
Review on:- On which date review conducted.
Referred documents: - i/p s to derive Test cases like requirement document.
48
Test case Id (or) Name:-
 It is a unique identifier for Test case which should be unique for
entire project
 In general provide name for a Test case we should follow some
format:
 Tco1-Project Name-Module-Functionality.
Test case Description:-
 It describes core intension or objective of test case.
Priority:-
 Describes importance of test case for execution
 Priority is derived based on importance of functionality with respect to client
business needs
 There can be 3 levels of priority
1) High
2) Medium
3) low
Advantages of Priority:-
 Due to lack of time we can execute first high priority Test cases and next
level priority Test cases.
Step Name:-
 It describes no of steps in a test case
Ex:- step1, step2…….. Etc.
Test Data:-
 It describes i/p provided to the system during execution of test case.
 Test Engineer need to identify required test data and that should be
provided under “Test Data” column.
Step Description:-
 Describes user action /operation to be performed on the application during
execution of test cases.
Note:- In a test case every step should describe at least one user operation and
subsequent response from the system.
49
Expected Result:-
 It is an expected behaviour of the Application Under Test(AUT)
 Expected result will be drafted from the client requirements.
Actual Result:-
 It describes actual behaviour of the Application Under Test(AUT) or System
Under Test(SUT)
 Actual result will be drafted from AUT
Status:-
 It describes status of steps in terms of pass or fail.
Pass:-
 When expected result matches with actual result
Fail:-
 When expected result not matches with actual result
Note:-
Actual result & status both are provided during Test cases execution time.
QC path /subject:-
 In general we derive Test cases in excel sheet and then we export those
test cases into QC.
Note:- To export Test cases from Excel sheet to Quality centre we should have
Excel Add-In’s for quality centre.
EX:- Write test case to verify delete functionality in Gmail- inbox.
Project : Gmail Reviewed By :
Module : Inbox Reviewed On :
Created By : Shiva Referred Doc : Gmail-BRS v1.0
Gmail-FRS v1.0
Created On : _/_/_
50
Ex:- Write Test cases for a login window functionalities validation in flight reservation
application.
Business Rules:-
1) Application path ”c:program filesHpQuick test professionalsamples
fightappflight4a.exe”
2) Login window should contain “Agent name:”, “password:”,edit boxes
,ok,cancel and Help buttons& flight image
3) Existing Agent name =”Ravi”& password=”mercury”
4) Cancel button to close login window
5) Help button to get information based on control in agent name & password
fields.
Test scenarios:-
Tso1:- Launching application
Tso2:- Login validation
Tso3:- closing login window
Tso4:- Help functionality
Test Case
Id/Name
Test Case
Description
Priority Step
Name
Test Data Step Description Expected Result
Tco1-
Gmail-
Inbox-
Delete mail
Functionalit
y
This test case
to verify
delete mail
functionality
Medium Step1 Select one mail
and click on
delete
Selected mail
should be deleted
Step2 Select More than
one mail and click
on delete
Selected mails
should be deleted
Step3 Open mail and
click on delete
Opened mail
should be deleted
Step4 Select mails
read/unread
criteria
Corresponding
mails should be
deleted.
Step 5 Click on delete
without select
Error message
should be popup
Step6 Select all the
mails and click on
delete
All mails should
be deleted
51
Test Cases Review:-
After writing test cases review will be conducted to check correctness &
completeness of the Test cases.
 Test cases review will be conducted in 2 levels
Peer Review:-
 Within the TE’s by interchanging they written test cases review will be
conducted .
Test Lead’s Review:-
 After peer review test cases send to test lead where Test Lead will conduct
review to conform written test cases are sufficient or not to validate the
application.
Requirement Traceability Matrix:-
 During Test cases review we prepare RTM/TM in order to analyse all the
requirements covered or not with written test cases.
 To prepare RTM/TM we map the each Test case to the corresponding
requirement.
Ex;- Prepare Traceability matrix for login window Test case coverage
Test Execution:-
 After test case review test lead will give the permission to execute test cases
in order to validate application
 In generally test cases are not executed individually, whereas we prepare
Test set /Test suits/Test Batch and those are taken for execution activity.
Req.ID Test Scenario/Requirement TC ID/Name TC Description
52
Test Set:-
 It is a collection of Test cases based on the application flow or
dependency of functionalities in application.
 Test Set will help to analyse test execution coverage & it is easy to
execute test case.
Test Execution Flow:-
Defect
Fixing
Release patch
Following are the Test execution Levels:-
Level-o: Sanity/Smoke Test:-
 It is performed whenever build deployed /installed at test
environment.
Developers Testing Team
Level-0
Sanity/Smoke
Level-0
Real/Compreh
ensive Testing
Failed
Mismatch
Level-2
Re& Regression Testing
Modified Build
No mismatches
Level-3 : Final
Regression Testing
UAT
Test Closure
53
 In this test major functionalities we validate to conform build is
stable or not for further testing activities.
Level-1: Real Testing/Comprehensive Testing:-
 When build is stable then we execute test cases using test sets/test
suits in order to validate application.
Following are the activities performed by Test Engineer during test
cases execution:[Manual Testing Approach]
Step1:- Perform operation on AUT as for “Step description” in the test case
Step2:-Verify actual behaviour of application with respect to “Expected Result” in .
test case.
Step3:- Record actual behaviour of AUT under “actual result” column & provide . .
. “status” for a step.
 Following are the statuses for Test cases:-
Passed:- When excepted results matching with actual results
Failed;- If any deviation b/w expected result & actual result
Blocked;- Due to parent functionality failure, when Test case not possible to execute
. in the current test then provide status as Blocked.
Not Completed:- When some of the status in a test case not at executed.
No Run:- When the test case not at executed, it is a default status for a test case.
Level 2:Re& regression testing :-
Re testing:- It is performed on modified build to ensure defects are resolved or not.
Regression Testing:- It is performed to find any side effects on existing system with
respect to modifications.
Note:- Re-testing & Regression testing will be performed in the same level.
Level3: Final Regression Testing:-
 It is also called as “Pre-Release testing or “End to End scenario
testing”
 In this test some of the functionalities are validated from login
session to logout session based on defect density during
comprehensive testing.
54
Defect Density:-
Number of defects identified in a specific area or module
Defect Reporting:-
 During Test cases execution if any defects are identified then Test Engineer
should prepare defect profile and those are sent to the test lead and
developers.
 In general defects can reported manually or using some of the defect
reporting tools like Quality centre is a HP product, Clear Quest is IBM product
Defect Template:-
1) Defect ID:-
2) Reported By:-
3) Reported On:-
4) Reported To:-
5) Test Set:- Name of test set in which test case fail, Test case id/Name: Name
. of the test case along with the step which have the deviation.
6) Project: - Name of the project
7) Module: - In which module defect identified.
8) Build version Id: - Version number
9) Reproducible defect: - (yes/no)
 When defect is identified then test engineers has to recheck the
same functionality , If defect is raised again then it will be
considered as “Reproducible Defect”
 During rechecking the functionality defect is not raised then it will
be consider as not reproducible defect
Note :- When defect is reproducible then we need to provide more information to
developers like defect snapshot& reproducible steps in a test case
10)Priority:-It describes importance of the defect to resolve , When as priority
defined importance of the functionality in which we identified defect
There can be 3 levels of priority
a) High
b) Medium
c) Low
55
11)Severity:-
 It describes seriousness of the defect in the system functionality to
execute other test cases.
 It also describes the impact of the defect in the system functionality
There can be 4 levels of severity
1) Critical fatal: - There is no work around to continue the test execution without
. solving those defects
2) High: - It is a high functionality defect where we have work around to
continue test execution
3) Medium:- For medium and low functionalities defects
4) Low: - For look & feel and usability related defects.
Note: - Priority and severity both are called “Defect parameters based on that
developers will identify which defects they need to resolve first.
12)Status: - It describes scale of the defect, In general when we report 1st
time
to developers which have the status as “New”
13)Summary: - It describes brief description about the defect
Summary
Defect ID : Project :
Reported by : Module :
Reported on : Build :
Reported to : Version ID :
Reproducible : Priority :
Severity :
Defect life cycle: -
It describes various status of defects from it identification to closed.
(Or)
The time gap between defect identification time to defect closed time is called
”Defect Life cycle”
Following are the status provided by Test Engineer: -
New: - When 1st
time we reporting about deviation to developers Closed: - When test
engineer satisfied about defect resolve work in modified build .
56
……………………………Development Team…………………………………
Start
Is it a
new test
Select the test case
for execution
Analyse
Result
Prepare a defect report
with Status=New and
send to Dev. Team
Is it in
scope
Is it already
reported?
Status=Rejected Status=Duplicate
Defect accepted by Dev.
Team: Status=Open
Dev. Team Resolves the
defect: Status=Fixed
End DLC
End DLC
Document the Result
and move to next test
case
Re testing and
Regression testing
Is Defect
Fixed?
Defect can be closed
Status=Closed
Need to Reopen the
defect: Status=Reopen
57
Following are the status provided by Developers:-
1) Duplicate: - When defect is similar to earlier defect
2) Add: - When developers require more information about defect.
3) Rejected: - When developers are not accepting that as a defect.
4) Defect: - Developers are accepted that as a defect but those defects will be
consider in the next release of the application to the customer due to low
priority & low severity
5) Open: - When developers are accepted i.e. defect & they are ready to resolve
6) Fixed: - When defect is resolved in modified build.
7) Defect age: - The time gap b/w the defect identification date to closed date.
8) Later defect: - Defects which are identified in the later stages of testing .
9) Marked defects: - some defects may hide some other defects
10)User acceptance test completed: -Test lead will analysed exit criteria
condition which are specified in the test plan to stop the testing activities.
Test closure: - It is performed by test lead after execution of all the test cases
& user acceptance test completed.
Ex: - 1
Test cases for 1litere bottle.
 Verify company name
 Verify quantity as 1litere or not
 Verify price of water bottle
 Verify bottle sealed or not.
 Verify manufacturing &expire date.
 Verify purity of water
 Verify colour of water bottle
 Verify cooling capacity of water bottle
Ex:2
Test cases for 4 GB Pen drive
 Verify company name
 Verify memory capacity
 Verify price of pen drive
 Verify warranty for a pen drive
 Verify model of pen drive
 Verify pen drive detecting or not
58
 Verify operations on pen drive like copy, paste, Delete, save & format
 Verify pen drive allowing 4 GB data or not to save
 Verify pen drive providing any information or not when we try to
save more than 4GB data
 Verify safe removal operation
 Verify impact on existing data when pen drive removed during
process
Test cases for a Lift which allows maximum 6 persons
 Verify lift allows 6 persons or not
 Verify doors will close automatic or manual
 Verify power consumption
 Verify lift providing any information or not when it is over loaded
 Verify lift should not move when doors not closed properly
 Verify lift will stop correct floor level or not
 Verify lift providing correct floor numbers or not
 Verify lift providing any information or not on which direction it is moving
 Verify possibility to open doors in emergency
 Verify internal switch board working condition
 Verify how lift will stop when we operates different floor numbers randomly
 Verify light working condition.
Ex: - TC’s for following components
1) Teacup 2) Pen 3) watch 4) Mobile 5) Phone 6) Fan
Ex: - TC’s for employee search page business needs
1) Application URL: - www.Empsearch.com
2) Employee search page should contain Emp.Name:,Emp.Dept.:,Date of
Joining(From: and To: ) input fields,Search,clear button and search result
table.
3) We can search employee record using either Emp name or Emp.Dept or DOJ.
4) Clear button should clear the data.

More Related Content

What's hot

Plum AXE Plus 2 Manual / User Guide
Plum AXE Plus 2 Manual / User GuidePlum AXE Plus 2 Manual / User Guide
Plum AXE Plus 2 Manual / User Guidemanualsheet
 
Nintex installation guide
Nintex installation guideNintex installation guide
Nintex installation guideparallelminds
 
Polymath hardware manual rev. 2.1
Polymath   hardware manual rev. 2.1Polymath   hardware manual rev. 2.1
Polymath hardware manual rev. 2.1Henrique Barroso
 
Manual mikrotik
Manual mikrotikManual mikrotik
Manual mikrotikAlex Dau
 
BI Apps Reports 5 QlikSense Desktop
BI Apps Reports 5  QlikSense DesktopBI Apps Reports 5  QlikSense Desktop
BI Apps Reports 5 QlikSense DesktopSunny U Okoro
 
FYP1_GSN-Spring16-02
FYP1_GSN-Spring16-02FYP1_GSN-Spring16-02
FYP1_GSN-Spring16-02Ahmad Faizan
 

What's hot (9)

Refman3.0
Refman3.0Refman3.0
Refman3.0
 
Plum AXE Plus 2 Manual / User Guide
Plum AXE Plus 2 Manual / User GuidePlum AXE Plus 2 Manual / User Guide
Plum AXE Plus 2 Manual / User Guide
 
Nintex installation guide
Nintex installation guideNintex installation guide
Nintex installation guide
 
Polymath hardware manual rev. 2.1
Polymath   hardware manual rev. 2.1Polymath   hardware manual rev. 2.1
Polymath hardware manual rev. 2.1
 
Manual mikrotik
Manual mikrotikManual mikrotik
Manual mikrotik
 
Manual fet-pro430
Manual fet-pro430Manual fet-pro430
Manual fet-pro430
 
Install
InstallInstall
Install
 
BI Apps Reports 5 QlikSense Desktop
BI Apps Reports 5  QlikSense DesktopBI Apps Reports 5  QlikSense Desktop
BI Apps Reports 5 QlikSense Desktop
 
FYP1_GSN-Spring16-02
FYP1_GSN-Spring16-02FYP1_GSN-Spring16-02
FYP1_GSN-Spring16-02
 

Viewers also liked

Viewers also liked (20)

New microsoft office word document
New microsoft office word documentNew microsoft office word document
New microsoft office word document
 
Gert common morality ol 505(1)
Gert common morality ol 505(1)Gert common morality ol 505(1)
Gert common morality ol 505(1)
 
Music magazine
Music magazineMusic magazine
Music magazine
 
Manual g3w store
Manual g3w storeManual g3w store
Manual g3w store
 
40
4040
40
 
Afis scoala de iarna
Afis   scoala de iarnaAfis   scoala de iarna
Afis scoala de iarna
 
Tripticopalta
TripticopaltaTripticopalta
Tripticopalta
 
Importacni de las tic
Importacni de las ticImportacni de las tic
Importacni de las tic
 
Reklama sutaž vianoce
Reklama sutaž vianoceReklama sutaž vianoce
Reklama sutaž vianoce
 
Franklin robalino resumen de leshop
Franklin robalino resumen de leshopFranklin robalino resumen de leshop
Franklin robalino resumen de leshop
 
1 6
1 61 6
1 6
 
Bloque ii practica i
Bloque ii practica iBloque ii practica i
Bloque ii practica i
 
Derby Genoa Samp_arenzano
Derby Genoa Samp_arenzanoDerby Genoa Samp_arenzano
Derby Genoa Samp_arenzano
 
40 41
40 4140 41
40 41
 
Curso adm 475 contabilidad tributaria
Curso adm 475   contabilidad tributariaCurso adm 475   contabilidad tributaria
Curso adm 475 contabilidad tributaria
 
28 29
28 2928 29
28 29
 
Without you
Without youWithout you
Without you
 
Sistema de llenado-teoria de control-jose Gonzalez
Sistema de llenado-teoria de control-jose GonzalezSistema de llenado-teoria de control-jose Gonzalez
Sistema de llenado-teoria de control-jose Gonzalez
 
Taula habilitats
Taula habilitatsTaula habilitats
Taula habilitats
 
Kit de estudio_k_ayglevis sierra_[1]
Kit de estudio_k_ayglevis sierra_[1]Kit de estudio_k_ayglevis sierra_[1]
Kit de estudio_k_ayglevis sierra_[1]
 

Similar to Manual testing materia with content pdf

Chitubox user manual v1.0 en
Chitubox user manual v1.0 enChitubox user manual v1.0 en
Chitubox user manual v1.0 enDaveRFlorizone
 
zJOS System Events Automation Users Guide
zJOS System Events Automation Users GuidezJOS System Events Automation Users Guide
zJOS System Events Automation Users GuideDeru Sudibyo
 
O C S Inventory N G Installation And Administration Guide 1
O C S  Inventory  N G  Installation And  Administration  Guide 1O C S  Inventory  N G  Installation And  Administration  Guide 1
O C S Inventory N G Installation And Administration Guide 1rossodavide
 
Zend Server Ce Reference Manual V403
Zend Server Ce Reference Manual V403Zend Server Ce Reference Manual V403
Zend Server Ce Reference Manual V403SMKF Plus Bani Saleh
 
White lcd serials user manual v3.1
White lcd serials user manual v3.1White lcd serials user manual v3.1
White lcd serials user manual v3.1Manuel Llerenas
 
Teamviewer manual by PW
Teamviewer manual by PWTeamviewer manual by PW
Teamviewer manual by PWtesttodel
 
Plesk 8.0 for Linux/UNIX
Plesk 8.0 for Linux/UNIXPlesk 8.0 for Linux/UNIX
Plesk 8.0 for Linux/UNIXwebhostingguy
 
Plesk 8.0 for Linux/UNIX
Plesk 8.0 for Linux/UNIXPlesk 8.0 for Linux/UNIX
Plesk 8.0 for Linux/UNIXwebhostingguy
 
Voicenger - System Requirements Specification
Voicenger - System Requirements SpecificationVoicenger - System Requirements Specification
Voicenger - System Requirements SpecificationVlad Petre
 
Utilize PC Fundamentals www.utilizewindows.com
Utilize PC Fundamentals www.utilizewindows.comUtilize PC Fundamentals www.utilizewindows.com
Utilize PC Fundamentals www.utilizewindows.comMarko Ivančić
 
Dns320 manual 100
Dns320 manual 100Dns320 manual 100
Dns320 manual 100markvw3
 
Application of microsoft word
Application of  microsoft wordApplication of  microsoft word
Application of microsoft wordFast Movers
 
Maa wp sun_apps11i_db10g_r2-2
Maa wp sun_apps11i_db10g_r2-2Maa wp sun_apps11i_db10g_r2-2
Maa wp sun_apps11i_db10g_r2-2Sal Marcus
 
Maa wp sun_apps11i_db10g_r2-2
Maa wp sun_apps11i_db10g_r2-2Maa wp sun_apps11i_db10g_r2-2
Maa wp sun_apps11i_db10g_r2-2Sal Marcus
 
Sony Xperia XZ2 Premium Manual/User Guide
Sony Xperia XZ2 Premium Manual/User GuideSony Xperia XZ2 Premium Manual/User Guide
Sony Xperia XZ2 Premium Manual/User Guidemanualsheet
 

Similar to Manual testing materia with content pdf (20)

Chitubox user manual v1.0 en
Chitubox user manual v1.0 enChitubox user manual v1.0 en
Chitubox user manual v1.0 en
 
zJOS System Events Automation Users Guide
zJOS System Events Automation Users GuidezJOS System Events Automation Users Guide
zJOS System Events Automation Users Guide
 
O C S Inventory N G Installation And Administration Guide 1
O C S  Inventory  N G  Installation And  Administration  Guide 1O C S  Inventory  N G  Installation And  Administration  Guide 1
O C S Inventory N G Installation And Administration Guide 1
 
UsersGuide
UsersGuideUsersGuide
UsersGuide
 
UsersGuide
UsersGuideUsersGuide
UsersGuide
 
Zend Server Ce Reference Manual V403
Zend Server Ce Reference Manual V403Zend Server Ce Reference Manual V403
Zend Server Ce Reference Manual V403
 
White lcd serials user manual v3.1
White lcd serials user manual v3.1White lcd serials user manual v3.1
White lcd serials user manual v3.1
 
Software Development Plan
Software Development PlanSoftware Development Plan
Software Development Plan
 
Teamviewer manual by PW
Teamviewer manual by PWTeamviewer manual by PW
Teamviewer manual by PW
 
MSICENTER.pdf
MSICENTER.pdfMSICENTER.pdf
MSICENTER.pdf
 
Plesk 8.0 for Linux/UNIX
Plesk 8.0 for Linux/UNIXPlesk 8.0 for Linux/UNIX
Plesk 8.0 for Linux/UNIX
 
Plesk 8.0 for Linux/UNIX
Plesk 8.0 for Linux/UNIXPlesk 8.0 for Linux/UNIX
Plesk 8.0 for Linux/UNIX
 
Voicenger - System Requirements Specification
Voicenger - System Requirements SpecificationVoicenger - System Requirements Specification
Voicenger - System Requirements Specification
 
Shideshare
ShideshareShideshare
Shideshare
 
Utilize PC Fundamentals www.utilizewindows.com
Utilize PC Fundamentals www.utilizewindows.comUtilize PC Fundamentals www.utilizewindows.com
Utilize PC Fundamentals www.utilizewindows.com
 
Dns320 manual 100
Dns320 manual 100Dns320 manual 100
Dns320 manual 100
 
Application of microsoft word
Application of  microsoft wordApplication of  microsoft word
Application of microsoft word
 
Maa wp sun_apps11i_db10g_r2-2
Maa wp sun_apps11i_db10g_r2-2Maa wp sun_apps11i_db10g_r2-2
Maa wp sun_apps11i_db10g_r2-2
 
Maa wp sun_apps11i_db10g_r2-2
Maa wp sun_apps11i_db10g_r2-2Maa wp sun_apps11i_db10g_r2-2
Maa wp sun_apps11i_db10g_r2-2
 
Sony Xperia XZ2 Premium Manual/User Guide
Sony Xperia XZ2 Premium Manual/User GuideSony Xperia XZ2 Premium Manual/User Guide
Sony Xperia XZ2 Premium Manual/User Guide
 

Recently uploaded

Team Lead Succeed – Helping you and your team achieve high-performance teamwo...
Team Lead Succeed – Helping you and your team achieve high-performance teamwo...Team Lead Succeed – Helping you and your team achieve high-performance teamwo...
Team Lead Succeed – Helping you and your team achieve high-performance teamwo...Association for Project Management
 
Mythology Quiz-4th April 2024, Quiz Club NITW
Mythology Quiz-4th April 2024, Quiz Club NITWMythology Quiz-4th April 2024, Quiz Club NITW
Mythology Quiz-4th April 2024, Quiz Club NITWQuiz Club NITW
 
4.9.24 School Desegregation in Boston.pptx
4.9.24 School Desegregation in Boston.pptx4.9.24 School Desegregation in Boston.pptx
4.9.24 School Desegregation in Boston.pptxmary850239
 
ClimART Action | eTwinning Project
ClimART Action    |    eTwinning ProjectClimART Action    |    eTwinning Project
ClimART Action | eTwinning Projectjordimapav
 
Q-Factor General Quiz-7th April 2024, Quiz Club NITW
Q-Factor General Quiz-7th April 2024, Quiz Club NITWQ-Factor General Quiz-7th April 2024, Quiz Club NITW
Q-Factor General Quiz-7th April 2024, Quiz Club NITWQuiz Club NITW
 
4.16.24 Poverty and Precarity--Desmond.pptx
4.16.24 Poverty and Precarity--Desmond.pptx4.16.24 Poverty and Precarity--Desmond.pptx
4.16.24 Poverty and Precarity--Desmond.pptxmary850239
 
Using Grammatical Signals Suitable to Patterns of Idea Development
Using Grammatical Signals Suitable to Patterns of Idea DevelopmentUsing Grammatical Signals Suitable to Patterns of Idea Development
Using Grammatical Signals Suitable to Patterns of Idea Developmentchesterberbo7
 
CLASSIFICATION OF ANTI - CANCER DRUGS.pptx
CLASSIFICATION OF ANTI - CANCER DRUGS.pptxCLASSIFICATION OF ANTI - CANCER DRUGS.pptx
CLASSIFICATION OF ANTI - CANCER DRUGS.pptxAnupam32727
 
ICS2208 Lecture6 Notes for SL spaces.pdf
ICS2208 Lecture6 Notes for SL spaces.pdfICS2208 Lecture6 Notes for SL spaces.pdf
ICS2208 Lecture6 Notes for SL spaces.pdfVanessa Camilleri
 
Expanded definition: technical and operational
Expanded definition: technical and operationalExpanded definition: technical and operational
Expanded definition: technical and operationalssuser3e220a
 
Textual Evidence in Reading and Writing of SHS
Textual Evidence in Reading and Writing of SHSTextual Evidence in Reading and Writing of SHS
Textual Evidence in Reading and Writing of SHSMae Pangan
 
Active Learning Strategies (in short ALS).pdf
Active Learning Strategies (in short ALS).pdfActive Learning Strategies (in short ALS).pdf
Active Learning Strategies (in short ALS).pdfPatidar M
 
4.16.24 21st Century Movements for Black Lives.pptx
4.16.24 21st Century Movements for Black Lives.pptx4.16.24 21st Century Movements for Black Lives.pptx
4.16.24 21st Century Movements for Black Lives.pptxmary850239
 
Indexing Structures in Database Management system.pdf
Indexing Structures in Database Management system.pdfIndexing Structures in Database Management system.pdf
Indexing Structures in Database Management system.pdfChristalin Nelson
 
4.11.24 Poverty and Inequality in America.pptx
4.11.24 Poverty and Inequality in America.pptx4.11.24 Poverty and Inequality in America.pptx
4.11.24 Poverty and Inequality in America.pptxmary850239
 
Grade 9 Quarter 4 Dll Grade 9 Quarter 4 DLL.pdf
Grade 9 Quarter 4 Dll Grade 9 Quarter 4 DLL.pdfGrade 9 Quarter 4 Dll Grade 9 Quarter 4 DLL.pdf
Grade 9 Quarter 4 Dll Grade 9 Quarter 4 DLL.pdfJemuel Francisco
 
Tree View Decoration Attribute in the Odoo 17
Tree View Decoration Attribute in the Odoo 17Tree View Decoration Attribute in the Odoo 17
Tree View Decoration Attribute in the Odoo 17Celine George
 
4.11.24 Mass Incarceration and the New Jim Crow.pptx
4.11.24 Mass Incarceration and the New Jim Crow.pptx4.11.24 Mass Incarceration and the New Jim Crow.pptx
4.11.24 Mass Incarceration and the New Jim Crow.pptxmary850239
 

Recently uploaded (20)

Team Lead Succeed – Helping you and your team achieve high-performance teamwo...
Team Lead Succeed – Helping you and your team achieve high-performance teamwo...Team Lead Succeed – Helping you and your team achieve high-performance teamwo...
Team Lead Succeed – Helping you and your team achieve high-performance teamwo...
 
Mythology Quiz-4th April 2024, Quiz Club NITW
Mythology Quiz-4th April 2024, Quiz Club NITWMythology Quiz-4th April 2024, Quiz Club NITW
Mythology Quiz-4th April 2024, Quiz Club NITW
 
4.9.24 School Desegregation in Boston.pptx
4.9.24 School Desegregation in Boston.pptx4.9.24 School Desegregation in Boston.pptx
4.9.24 School Desegregation in Boston.pptx
 
ClimART Action | eTwinning Project
ClimART Action    |    eTwinning ProjectClimART Action    |    eTwinning Project
ClimART Action | eTwinning Project
 
Paradigm shift in nursing research by RS MEHTA
Paradigm shift in nursing research by RS MEHTAParadigm shift in nursing research by RS MEHTA
Paradigm shift in nursing research by RS MEHTA
 
INCLUSIVE EDUCATION PRACTICES FOR TEACHERS AND TRAINERS.pptx
INCLUSIVE EDUCATION PRACTICES FOR TEACHERS AND TRAINERS.pptxINCLUSIVE EDUCATION PRACTICES FOR TEACHERS AND TRAINERS.pptx
INCLUSIVE EDUCATION PRACTICES FOR TEACHERS AND TRAINERS.pptx
 
Q-Factor General Quiz-7th April 2024, Quiz Club NITW
Q-Factor General Quiz-7th April 2024, Quiz Club NITWQ-Factor General Quiz-7th April 2024, Quiz Club NITW
Q-Factor General Quiz-7th April 2024, Quiz Club NITW
 
4.16.24 Poverty and Precarity--Desmond.pptx
4.16.24 Poverty and Precarity--Desmond.pptx4.16.24 Poverty and Precarity--Desmond.pptx
4.16.24 Poverty and Precarity--Desmond.pptx
 
Using Grammatical Signals Suitable to Patterns of Idea Development
Using Grammatical Signals Suitable to Patterns of Idea DevelopmentUsing Grammatical Signals Suitable to Patterns of Idea Development
Using Grammatical Signals Suitable to Patterns of Idea Development
 
CLASSIFICATION OF ANTI - CANCER DRUGS.pptx
CLASSIFICATION OF ANTI - CANCER DRUGS.pptxCLASSIFICATION OF ANTI - CANCER DRUGS.pptx
CLASSIFICATION OF ANTI - CANCER DRUGS.pptx
 
ICS2208 Lecture6 Notes for SL spaces.pdf
ICS2208 Lecture6 Notes for SL spaces.pdfICS2208 Lecture6 Notes for SL spaces.pdf
ICS2208 Lecture6 Notes for SL spaces.pdf
 
Expanded definition: technical and operational
Expanded definition: technical and operationalExpanded definition: technical and operational
Expanded definition: technical and operational
 
Textual Evidence in Reading and Writing of SHS
Textual Evidence in Reading and Writing of SHSTextual Evidence in Reading and Writing of SHS
Textual Evidence in Reading and Writing of SHS
 
Active Learning Strategies (in short ALS).pdf
Active Learning Strategies (in short ALS).pdfActive Learning Strategies (in short ALS).pdf
Active Learning Strategies (in short ALS).pdf
 
4.16.24 21st Century Movements for Black Lives.pptx
4.16.24 21st Century Movements for Black Lives.pptx4.16.24 21st Century Movements for Black Lives.pptx
4.16.24 21st Century Movements for Black Lives.pptx
 
Indexing Structures in Database Management system.pdf
Indexing Structures in Database Management system.pdfIndexing Structures in Database Management system.pdf
Indexing Structures in Database Management system.pdf
 
4.11.24 Poverty and Inequality in America.pptx
4.11.24 Poverty and Inequality in America.pptx4.11.24 Poverty and Inequality in America.pptx
4.11.24 Poverty and Inequality in America.pptx
 
Grade 9 Quarter 4 Dll Grade 9 Quarter 4 DLL.pdf
Grade 9 Quarter 4 Dll Grade 9 Quarter 4 DLL.pdfGrade 9 Quarter 4 Dll Grade 9 Quarter 4 DLL.pdf
Grade 9 Quarter 4 Dll Grade 9 Quarter 4 DLL.pdf
 
Tree View Decoration Attribute in the Odoo 17
Tree View Decoration Attribute in the Odoo 17Tree View Decoration Attribute in the Odoo 17
Tree View Decoration Attribute in the Odoo 17
 
4.11.24 Mass Incarceration and the New Jim Crow.pptx
4.11.24 Mass Incarceration and the New Jim Crow.pptx4.11.24 Mass Incarceration and the New Jim Crow.pptx
4.11.24 Mass Incarceration and the New Jim Crow.pptx
 

Manual testing materia with content pdf

  • 1. 1 Contents Software.................................................................................................................................................6 System software...............................................................................................................................6 Application Software........................................................................................................................6 Product based and Project based..............................................................................................6 Software Testing...................................................................................................................................6 Software Testing Methods......................................................................................................................7 Manual Testing: ..................................................................................................................................7 Automation Testing ............................................................................................................................7 Roles and Responsibilities of a Functionality Test Engineer:..................................................................7 SDLC [system development life cycle] ....................................................................................................8 Common problems in SDLC:- ............................................................................................................11 SDLC Models:-.......................................................................................................................................12 Waterfall Model: -.............................................................................................................................12 Prototype Model:-.............................................................................................................................13 Incremental Model:- .........................................................................................................................14 RAD Model:-......................................................................................................................................15 Fish Model:- ......................................................................................................................................16 Static Testing: -..............................................................................................................................16 Dynamic Testing:-..........................................................................................................................16 Verification:- .................................................................................................................................16 Validation:-....................................................................................................................................17 V-Model: - .........................................................................................................................................17 Agile Model:-.....................................................................................................................................18 Quality management:-..........................................................................................................................19 Quality Assurance .............................................................................................................................19 Quality Control:-................................................................................................................................19 Testing Approaches:- ............................................................................................................................20 Exhaustive testing:-...........................................................................................................................20 Optimal Testing:-...............................................................................................................................20 Testing Methodologies .........................................................................................................................20 White Box testing:- ...........................................................................................................................20
  • 2. 2 Black Box Testing:- ............................................................................................................................20 Gray Box Testing:-.............................................................................................................................21 Testing levels in SDLC:- .........................................................................................................................21 Requirements Review:-.....................................................................................................................21 Design Review:-.................................................................................................................................21 Unit Testing:-.....................................................................................................................................22 Integration testing:-..........................................................................................................................23 Big Bang Theory:-..........................................................................................................................23 Incremental Approach:-................................................................................................................23 System Testing:-....................................................................................................................................26 Functionality Testing:-.......................................................................................................................26 Object properties coverage:-........................................................................................................27 Error Handling Coverage:-............................................................................................................27 I/P Domain coverage:- ..................................................................................................................27 Calculation coverage:-...................................................................................................................30 Database Coverage:-.....................................................................................................................30 Links coverage:-.............................................................................................................................31 Non – functionality Testing:-.............................................................................................................31 Graphical User Interface testing:-.................................................................................................31 Usability Testing:-..........................................................................................................................32 Performance testing: - ..................................................................................................................32 Security testing:- ...........................................................................................................................33 Recovery testing: - .....................................................................................................................34 Portability testing/compatibility testing:-..................................................................................34 Configuration testing: - ..............................................................................................................34 Installation testing: -...................................................................................................................34 Sanitation testing / Garbage testing:-......................................................................................35 Comparative testing/ parallel testing: -....................................................................................35 User acceptance testing: -................................................................................................................35 Alpha testing: -................................................................................................................................35 Beta testing: -..................................................................................................................................35 Some Other Testing Activities: - ......................................................................................................37 Sanity testing (build stable or not): -............................................................................................37 Ad-hoc testing: - .............................................................................................................................37
  • 3. 3 Exploratory testing: -......................................................................................................................37 Jump / Monkey: -............................................................................................................................38 Localization testing:-......................................................................................................................38 Internationalization testing: -.........................................................................................................38 Mutation testing (senior developer): -..........................................................................................38 Re- testing: -....................................................................................................................................38 Regression testing: -......................................................................................................................38 Maintenance testing:- ....................................................................................................................39 Software Testing Life Cycle..............................................................................................................40 Test initiation: - ...............................................................................................................................40 Test planning:-................................................................................................................................41 Components in Test Plan Document:-........................................................................................41 Test Case Design:- ........................................................................................................................44 Inputs to Derive Test cases:-....................................................................................................45 Fundamentals of Test Cases:-.................................................................................................46 Types of test cases:-..................................................................................................................46 Test Case Template:- ................................................................................................................47 Test Cases Review:-..................................................................................................................51 Requirement Traceability Matrix:-............................................................................................51 Test Execution:-..............................................................................................................................51 Test Set:- .....................................................................................................................................52 Test Execution Flow:- ................................................................................................................52 Level-o: Sanity/Smoke Test:- ...................................................................................................52 Level-1: Real Testing/Comprehensive Testing:- ...................................................................53 Level 2:Re& regression testing :-.............................................................................................53 Level3: Final Regression Testing:-.........................................................................................53 Defect Reporting:-..........................................................................................................................54 Defect Template:-.......................................................................................................................54 Defect life cycle: -.......................................................................................................................55 Test closure: - .................................................................................................................................57 Test cases for 1litere bottle. .............................................................................................................57 Test cases for 4 GB Pen drive .........................................................................................................57 Test cases for a Lift which allows maximum 6 persons ...............................................................58
  • 4. 4
  • 5. 5
  • 6. 6 Software Set of instructions, programs document to perform the specific task. Software can be categorized into two types 1. System software 2. Application software System software These soft wares are used to provide interface between the system components. Ex: - All OS’s like windows, Linux,…etc. Application Software These are developed based on client business needs in order to perform their activities  In App s/w again divided into two types Product based and Project based a) Product based: - When we develop the application based on standard requirements and that can be sell to any customer in the market Ex: - Ms Word is a product of Microsoft, QTP is a product of HP b) Project based:-When we develop the application based on the specific client requirements and that should be delivered that particular client only. Ex:-www.constanza.com is a project for “constanza” client. www.qaramu.com is a project for “Ramakrishna” Software Testing It is a process to identify correctness, completeness and measure quality of developed Software Application.  S/W Testing will help to deliver reliable Application to the customer and it will reduce maintenance cost of project.  Objective of Software testing is to identify defects, when change defects quality improves Defect: - It is a deviation b/w expected result to the actual result in Application under test i) Defect can also be called bug or issue Correctness: - Variable implemented functionality is working as per expectations or not by performing operations
  • 7. 7 Completeness:- Verify all the client business needs or requirements are covered or not in terms of the functionalities in this Application In a simple S/W testing is a combination of verification and validation Software Quality: - As per produces products (Development team) when App fulfilled client with all the client requirements when he will say it is a qualify Application As per client or customer and user point of view when App fit for use, according to his business needs then we will say that is a quality Application. Following are the major factors depends software quality: 1) Budget or cost 2) In time release 3) Reliability i) Meet client requirements in terms of functionality ii) Meet client expectations Software Testing Methods In general organization follows 2 types of methods to validate application 1). Manual testing 2). Automation testing Manual Testing: Without using any automation tools test engineer will verify actual behaviour of App by performing the operations or transactions. For manual testing test engineer will prepare test cases which are used to validate Applications Advantage: - simple & easy Disadvantages:-  Time consuming [more time taken to execute]  Human errors Automation Testing: Automating the human activities [Test cases execution] in order to validate Applications is called Automation Testing Advantages: - 1) less time to execute 2) There is no possibility of human errors Disadvantages: - 1) Automation tools are expensive 2) Skilled automation test engineers are required Roles and Responsibilities of a Functionality Test Engineer: 1) Analyse the client requirements [BRS& FRS] 2) Identify the test Scenario’s 3) Prepare Test cases
  • 8. 8 4) Develop Automation script 5) Review on Test cases & Automation Test script 6) Execution of Test cases and script 7) Defect Reporting 8) Retesting & regression testing SDLC [system development life cycle] It describes development process of a software project or product to fulfill the client requirement with in the specified cost & time Following are the phases involved in SDLC 1) Requirements collection 2) Requirement Analysis 3) Design 4) Coding 5) Testing 6) Release & maintenance B. A Requirement collection BRS | URS | CRS | Budget B.A Feasibility study In Time Reliability SA Requirement Analysis FRS SRS GUI Design doc DA Design Data Base design doc App design doc Dev Coding S.C.Document Developer Unit and Integration Testing (W.B.T) QA Tester Testing System Testing (B.B.T) Client User Acceptance Testing Release and Maintenance
  • 9. 9 Here:- BA ………….. Business analyst SA …………… system Analyst BRS ……………. Business requirement specification DA …………… Design Architect URS …………… User requirement specification GUI …………. Graphical user interface CRS …………… Client requirement specification ADD/TDD ………..…. Application / technical design document SRS/FRS ………….. System/Functional requirement specification SCD ………….. Source code document HLD ………….. High level design doc LLD …………… Low level design doc Requirements collection: - It is an initial activity performed in SDLC In this phase B.A will collect requirements with an interaction of client and collected requirements will be documented as BRSURSCRS BRS: - It describes brief description of core logic of client business needs in terms of who are the user for the Application & required services for those users in that application EX: - Online Banking Admin Banker Customer After preparation of BRS doc they perform feasibility study to check project is acceptable or not in order to develop where as BA will play a key role in feasibility study Following are the factors analysed in feasibility study:- 1) Budget feasibility 2) Time feasibility 3) Requirements are reliable or not in terms of technology to develop
  • 10. 10 After feasibility study if project is acceptable then business analyst will intimate to the client by releasing RFP and SLA documents. Requirement Analysis:- In the phase system analyst will analyse client business needs from BRS based on that he will prepare detailed document called FRS/ SRS FRS describes detailed functionality of each component like which date it should accept & how the component should work Design: - In this phase design Architect will design application architecture to fulfil the client requirements which are specified at FRS. In this phase following are the doc prepared by DA 1) GUI design doc 2) Data base Design Doc 3) Application Design Doc / TDD i) GUI Design Doc :- It contains prototypes of an application  Prototype will help to foresee the future implementation of an application & better understandability of functionalities  Proto type is a sample application without functionality ( dummy screens )  Prototypes are not mandatory for all projects ii) Data base Design Doc :- It describes about database structure and application in terms of no of tables relation b/w those tables & rules implemented in database iii) ADD/ Technical Design doc :- it contains 2 types of sub doc’s 1) HLD 2) LLD HLD: - It describes no of modules required for a project & relation b/w those modules Ex:- For a Hospital management system may contain following modules. HMS Front Desk Regist ration Billing Pharmacy Clinical chart Patient chart
  • 11. 11 Modularization: splitting the projects with set of modules for easy development of application is called Modularization Module: It is a some portion of application which have ssthe set of similar requirements of functionalities LLD: - There should be individual LLD for each module in order to develop the logic while writing the programs Note: - Design docs are important for developers in order to write the programs Coding / Implementation: - In this phase developers will write the program using programming language (for windows based application) or scripting languages (for web based application) O/p of this phase is source code document (s.c.doc) Testing:- After completion of coding programs are available for execution. Initially developers will perform unit test & integration testing using W.B.T (white box testing techniques) After that separate testing team will perform system testing using B.B.T (Black Box Testing) Then client also performs user acceptance testing Release & Maintenance:- Release: - After system testing & creating user acceptance testing on our work product then we deliver application to the client for further use at live environment is called “Release or Go live or Production Maintenance: - while using the application client can identify some defects or he may require some other functionality in the existing system then he will send change request (C.R) to the development team Based on initial agreement (SLA), CCB (change control board) will work on change request Common problems in SDLC:- 1) Poor Requirements:- when requirements are incomplete & not clear to understand that will be a problem to develop the application 2) Unrealistic schedule :- If too much of work is crammed/ assigned in too little time that will be a problem 3) Inadequate testing/ Incomplete testing :- In present scenario it is difficult to estimate how much testing is sufficient to validate application
  • 12. 12 4) Dynamic changes in requirement :- When client continuously sending changes in requirements then that will be a problem 5) Miscommunication: - lack of communication b/w Developers , clients , DA , SA..Etc. Defect repair cost with respect to SDLC phases:- SDLC phases DRC Requirement 0% Design 10% Coding 30% Testing 50% Maintenance 100% Note: - Early stages identify the defects will take less cost to resolve compare to later stages identified defects. Note: - software testing will help to reduce maintenance cost for a project SDLC Models:- Based on need of customer & complexity of requirement we can adopt the anyone of the following SDLC models to develop the application 1) Water fall Model 2) Prototype Model 3) Incremental model 4) Spiral Model 5) RAD Model 6) Fish model 7) V model 8) Agile Model Waterfall Model: - This model is also called as linear sequential waterfall model This model is preferable for “small” projects which have “clear” requirements In this model entire system or application developed in sequential i.e. If one phase is completed, then they start next phase
  • 13. 13 Waterfall Model Advantages: - It is easy & simple to develop application Disadvantages; - This model is not suitable for dynamic changes in the requirement And early stages identifying defects is not possible. Prototype Model:- Prototype:- It is a sample application without functionality(Dummy screens) If Client not Demo to satisfy Client If client satisfied Requirements Collection Requirements Analysis Design Coding Testing Release & Maintenance Requirements Collection Requirements Analysis Design Develop Prototypes Client Evaluation Collect Feedback Refine Requirements Coding Testing Release&Maintaince
  • 14. 14  Prototype model is preferable when requirements are not clear or in complete.  In this model based on initial requirements we develop prototype which are given presentation to the customer based on client satisfaction we develop the application. Advantages: - In this model we can get complete requirements from client before actual coding using prototype. Disadvantage:-It is not reusable & developing prototype is an additional activity for developers. Incremental Model:-  This Model is preferable for big projects which have the risk to develop Sequential approach.  In this approach application is divided into modules & then they developed and tested and delivered to the client module by module.  Whereas the first module are implemented should be a core functionality of the system Requirements For Notepad:- 1.0 File Menu 11.0 Basic File Menu option 1.1.1Page setup and Print 2.0 Edit Menu 2.1.0 Basic Edit Menu Option 2.1.1 Find Replace Under 3.0 View menu 4.0.0 Format 5.0 Help. Advantages:-  Risk management is easy.  Early stages of application implementation and deliverables are possible. Disadvantages:-  It is an open ended SDLC Model there is no fixed deadlines to complete whole project. 1.1.0 2.1.0 D C T R 1.1.1 2.1.1 D C T R 3.0 4.0 D C T R
  • 15. 15 Spiral Model:-  This model is preferable for which projects successful implementation, estimations are not possible at early stages.  It is used for research applications and machine criticality applications Spiral Model  In this approach application developed like in incremental model whereas early stages deliverable are not possible Advantages:-  Less possibility defects in the final product.  Less resource is required to develop the application Disadvantages:-  Time consuming process(5 to 10 years) RAD Model:-  This model is suitable when client required whole system (or) application in an extremely short span of time like 60-90 days.  In this approach we use already existing predefined functionality components from other environment. Advantages:-  Possibility to deliver application in short time of span. Disadvantages:-  Required predefined components may not available M1 R.A DC T M2 R.A D C T M3 R.A D
  • 16. 16  Application environment may not supported existing predefined projects. Fish Model:-  It is not a practical approach to develop the applications  It describes theoretical mapping b/w development activities to testing activities. R.A Design Coding R&M Sy.T R.c{B.R.S} {F.R.S} {T.D.D} {S.C.D} Review Review W.B.T B.B.T C.R Static Testing: - It is a process of finding mistakes without execution of programs. Dynamic Testing:-It is the process of finding mistakes with execution times of programs (or) app’s. Verification:-It is the process to check are we developing product right or not.  It is a static testing approach.  In General verification performed on requirements documents {B.R.S and F.R.S}, Design Doc,Source code, test plan doc, test cases……etc. Following are the verification techniques:-  Peer Review  walkthrough  Inspection Peer Review:-  It is an informal meeting  Author will deliver document to reviewer to identify any mistakes Walkthrough:-
  • 17. 17  It is a semi informal meeting with 2 to 3 members  In this meeting author will explain about document to reviewers Inspection:-  It is a formalized meeting with 5 to 6 members  In this meeting following members involved. Author: - Owner of the document Reviewer/Inspector: - The person responsible to identify mistakes Presenter: - Who explains about the document to reviewers. Recorder/Scribe: - Who will prepare meeting note. Moderator: - Manager of the meeting. Validation:-  It is a process to check developed product right or not?  In general it is performed on application source code and functionalities. Following are the Validation Techniques:-  Unit testing  Integration testing  Functionality testing…..etc. V-Model: - V stands for verification & validation. Requirements Collection Requirements Analysis H.L.D L.L.D Coding Unit Test Integration Test t System Testing User Acceptance Testing
  • 18. 18 This model is suitable for big projects which have the clear requirements  In general organizations prefer V-Model to develop application  In this V-Model testing activity starts early stages with development activities.  Meeting point in v-model is “coding” on source code we can perform verification and validation. Advantages:- In this model early stages identifying mistakes is possible. Disadvantages:-In this model app developed in sequential approach due to that it is not suitable to handle dynamic changes in the requirement. Agile Model:-  In this model client closely associated with development team.  In this model application developed like in incremental modelwhereas after implementation of each feature (or) unit or component that will be delivered testing team and client time to get approval before we plan for next component (or) unit.  In this model within a week (or) 2 weeks we expect deliverables to client Collect feedback Client Requirements Unit/component Implemented Testing UAT Approved then plan for next Unit/component Testing UAT
  • 19. 19 Advantages:-  This model is suitable to handle dynamic changes in the requirement.  We can deliver reliable application to the customer Disadvantages:-  Planning the different team activity is difficult to task. Quality management:- It is a Process of preventing the defects while developing the application & to ensure there are no defects in the final product. Following are the terms involved in Quality management  Quality Assurance  Quality control Quality Assurance This team involves throughout SDLC to define process, monitor strength of development process& to provide suggestions to improve the development process. In this team management persons involved like project manager, Test manager, domain experts…….etc. Quality Control:- This team is responsible to identify any defects in final product and to solve those defects before deliver application to the customer Difference b/w QA &QC- QA QC ------ ------ 1. It is a process oriented 1. It is a product oriented 2. It involves throughout the SDLC 2.It involves after product is developed 3. It is a defects preventive approach 3.It is a defects detective approach 4. Reviews are the QA activities 4.S/W testing is example of QC . activity
  • 20. 20 Testing Approaches:- These are 2 types of approaches to validate app. Exhaustive testing:-  Testing the app with all possible combinations is called “Exhaustive testing”  In present scenario exhaustive testing is not possible Optimal Testing:-  Testing the app with best possible combinations is called “optimal testing”  In general we prefer optimal testing only Testing Methodologies:- To derive best possible test cases till achieve the completeness of testing in app source code& functionally we testing methodologies. There are 3 types of methodologies 1. White Box testing 2. Black Box testing (BBT) 3. Gray Box testing White Box testing:-  It is also called as “Glass Box Testing or Open/Clear testing or Structural testing”  WBT Techniques are used to validate source code of an app using programming knowledge  In general developers are used to following WBT techniques to derive test cases for code coverage. 1) Statements coverage 2) Path (or) branch coverage Black Box Testing:-  It also called “Closed Box testing”  Without any programming knowledge to validate app functionality using requirement knowledge we use BBT Techniques  Following are the BBT Techniques we use to derive test cases  Boundary value Analysis  Equivalence class partition
  • 21. 21 WBT BBT  It is a design & structural > it is specification based testing Based testing  It is internal logic driven testing > It is business transaction Driven testing  It is for code coverage > It is for requirements coverage Note: - lack of objective developers will validate only application source code they are not responsible for requirements coverage, due to that organisation maintain separate testing team for requirements coverage Gray Box Testing:-  it is a combination of WBT & BBT.  To perform GBT the person should have programming knowledge& complete requirements knowledge  It can be developed by developers & test engineers  It not provide complete code coverage & requirements coverage due to that it’s not preferable Testing levels in SDLC:- 1) Requirements review 2) Design review 3) Unit testing 4) Integration testing 5) System testing 6) User acceptance testing Requirements Review:- After preparation of required documents review will be conducted to analyse following factors a) All the client requirements covered (or) not b) Recorded information is correct (or) not c) Requirements are reliable (or)not to develop the app d) Requirement are understandable (or)not Design Review:- After preparation of design document review will be conducted to analyse following factors. 1) All the requirements covered (or) not in design 2) Design logic is correct or not
  • 22. 22 3) Design logic is understandable (or) not NOTE;- For requirements review & Design review they use verification techniques like peer review, walkthrough & Inspection. Unit Testing:-  It is an initial validation testing technique.  Unit testing also called as “component/module testing”.  After coding computer programs are available for execution In order to validate, “Testing on individual component (or)unit within the app is called “Unit Testing””  It is performed by developers by using WBT techniques Following are the factors they validate in the Unit Testing:- 1).Statements Coverage;- Verify all the statements are participating (or) not at least once during runtime and right techniques are used or not to avoid repeatable statements in the program. Ex:- User defined functions, Sub programs…… 2).Iterative or loop Statements Coverage:- Verify loop statements are terminating as per expectations (or) not Ex;-For loop, do while…….etc 3). Conditional statement coverage;-  Verify we use right conditions inconditional statements or not Ex;- if condition ,nested if,switch command…….etc. 4).Path/branch coverage:-  Verify execution flow of the program based on condition true or false 5).Cyclomatic complexity:-  It is a metric to measure no of independent paths required to execute a program No of paths=2(number of conditions)-1
  • 23. 23 Integration testing:-  After unit testing in order to the system (or) app developers will connect those individual modules or units or components  “Verify interface (or) data communication or functionally b/w units (or) components (or) modules is called Integration testing.”  In general, all the module implementation at same time may not possible whereas based on modules availability we using following approaches in integration testing. There are two types 1) Big Bang Theory 2) Incremental Approach Big Bang Theory:- This approach says when some of modules under development process then we need to wait to until those modules are developed in order to perform “Integration Testing” Drawbacks:- In this approach resource will be idle due to that in time release may not be possible Incremental Approach:-  This approach says based on availability of modules we can perform level by level integration testing  In this we use temporary programs like stub& driver when some of module under development process. Following are the approaches we use in Incremental integration testing;- 1) TOP-Down Approach 2) Bottom-up approach 3) Hybrid/sandwich approach Top-down Approach:-  In this approach we perform integration testing from main module to available sub modules when some of sub modules under development process
  • 24. 24  In This approach we use stub Top down Approach Stub:- It is a temporary program implemented by developers ,Itis used when sub module under development process. Bottom up Approach:- In this approach we will perform integration testing from sub module to main module when main module under development process. Main Sub1 Main Stub Main Sub1 Sub2 Driver
  • 25. 25 Driver:- It is a temporary program implemented by developers; it is used to main module under development process. In provides connection to sub modules. DRIVER ----------- 1) It is a temporary program 2) When main module under development process then driver is used 3) It provide connection to the sub modules 4) Driver is a calling program Stub ------- 1) It is also temporary program. 2) When sub module under development process then we use stub 3) It provide temporary result to main module 4) It is a called program Hybrid/Sandwiched Approach:-  When main module & some of sub modules under development process then we verify available modules interface, we use stub & driver. Sub1 Sub2 Driver Main Sub3 Sub4 Stub
  • 26. 26 There are 2-levels of Integration testing Low –level Integrating Testing:- When we verify interference with in the system (or) application component is called “low-level integration testing”. High-level Integration Testing:- When we verify interference b/w different app’s is called “High-level Integration Testing”. Ex;- verify transactions in ICICI bank ATM centre using HDFC Bank Debit card. Note: - Integration testing can perform by developers and test engineers.  Developers will perform integration testing after unit testing by WBT  Test engineer will perform integration testing during system testing using BBT technologies System Testing:- After unit test and Integration testing development team release build to the separate team  Build means set of integrated modules in excusable form(.exe files)  After receiving initial stable build from developers test engines will perform system testing Def.:- “Validate whole system based on client requirements and expectations is called “System Testing” Following are the testing techniques are used in system Testing;- 1) Functionality Testing 2) Non- functionality testing Functionality Testing:-  It is also called as “requirements testing” In this test we validate application functionality as per client business needs.  Any type app’s functionality testing is mandatory, due to that organization maintains separate functionality testing team.
  • 27. 27 Functionality testing can be performed manually (or) using some of the following functionality testing tool. Q.T.P -> H.P (2002) Win Runner -> H.P (1994) SILK -> BOARLAND Rational robot -> IBM Selenium -> Open source tool (true tool) Following are factors to validate in functionality testing:- Object properties coverage:-  Verify application object properties are changing or not based on operations performed on application. EXS:-enable,disable,items count….etc. Error Handling Coverage:-  Verify app behaviour when we performed invalid operations EX:-  Application should provide Error messages, warning messages, pop- up windows…..etc.  Verify login window providing any error messages when we performed invalid operations. I/P Domain coverage:- Verify I/P objects are accepting customer expected data (or) not like edit (or)text boxes Ex;- verify I/P objects are accepting customer expected data (or) not like edit (or) text boxes Ex;- Verify “name” edit box should allow Alphanumeric from 4-16 characters. Note:-Test engineer is responsible to drive test data in order to validate application To derive best possible test data we using following BBT techniques 1) Boundary value Analysis (BVA)
  • 28. 28 2) Equivalence class partition (ECP) Boundary value Analysis (BVA):-  This technique is used to validate i/p condition in terms of range (or) size  This technique says there will be 3 possible conditions to validate, possible conditions are Note:-  In general there will be high possibility of error in and around the boundary condition, those we can identify with these techniques.  When boundary conditions are correct for a ip object then it will accept within the specified rangesize. Ex:-Prepare text data using BVA for a “name” text box which should allow 4-16 characters. BVA(Size) Min ………… 4 = Valid Max ………… 16 = Valid Min-1 ………… 3 = Invalid Max-1 ………… 15 = Valid Min+1 ………… 5 = Valid Max+1 ………….. 17 = Invalid Ex:-Prepare text data for a “Mobile No “edit box which should allow only 10 digit number where as starting digit should be ‘9’. Minimum Maximum Minimum-1 Maximum-1 Minimum + 1 Maximum +1
  • 29. 29 BVA(Size) Min ………… 9000000000 = Valid Max ………… 9999999999 = Valid Min-1 ………… 8999999999 = Invalid Max-1 ………… 9999999998 = Valid Min+1 ………… 9000000001 = Valid Max+1 ………….. 1ooooooooo = Invalid Disadvantages;-  With this technique it is not possible to validate for data type for i/p object like alphabet, numeric, special characters…..etc.  With this technique we can validate i/p condition with only boundary values & their adjacent values (i.e. middle values are not possible to test) Equivalence class partition (ECP):- This technique is used to validate i/p condition in terms of data types.  This technique says divide test data into equivalence classes & take some Sample data from each class to validate i/p condition. Classes are Valid Invalid Ex;- Prepare test data to validate withdraw condition for ATM which allows from 100 to 20,000 where amount should multiples of 100. Valid Invalid 100<=Amount<=20,000/- {Amount should be multiples of 100} Amount<100,Amount>20,000/- {Amount which is not multiples of 100}
  • 30. 30 EX:-Prepare test data to validate “Name” edit box which should allow alphanumeric. ECP(Data Type) Valid Invalid a-z A-Z 0-9 All special characters  Verify “Name” edit box valid test data {combination of valid size from BVA & valid data type from ECP}  Verify name Edit with invalid test data {combination of invalid size from BVA & valid data type from ECP} Ex:- m09bnsbf45645 Ex:- fdcxbn@345(Invalid) Calculation coverage:- “Verify application generates expected o/p values (or) not based on given i/p data”. Ex:-Verify calculation coverage on fight reservation app for 5th order no record. Database Coverage:- Application Front End S.No Emp. name Emp. Dept Date of JngEmp.Reg Emp.Name : Emp.Dept : Date of Jng : Submit DeleteUpdate Data Base
  • 31. 31  Verify database content with respect to operations performed on app front end like submit/INSERT/update & delete operations  In this test we also verify the relation b/w frontend objects to database fields. Note:-  To find database structure for an app we refer database design document To validate database content we should get permission from DBA. Links coverage:- Verify implemented links are working correct or not in web based apps like image links, test links, broken links……etc. Non – functionality Testing:- Based on customer Exceptions we validate non functionality factors using following testing techniques.  Graphical User Interface testing.  Usability testing  Performance testing  Security testing  Recovery testing  Compatibility testing  Configuration testing  Installation testing  Sanitation testing  Comparative testing Graphical User Interface testing:- In this test to verify factors which are related to look & feel of an application Following are factors related to user interface a) Availability of components b) Font size or font style c) Controls spelling d) Controls visibility e) Back ground colour of screen f) Clarity of image objects like logos, graphs….etc.
  • 32. 32 Usability Testing:- “In this test to verify user friendliness of an application to perform operations (ease of use)“ Following are factors related to usability test:- a) Error messages are meaningful or not b) Function keys implementation c) Combination keys implementation (ctrl+p) d) Short navigations e) Tab implementations Performance testing: - After functionality testing separate testing team will conduct PT. In general organization maintain separate PT team where they do PT Using following performance testing tools  Load runner  Silk performer  Web load  Rational robot performer Following are the techniques are used in performance testing a) Load / Scalability b) Stress testing c) Soak / endurance testing d) Data volume testing Load testing:-  In this test we verify application allow customer expected load (concurrent users) on customer expected configuration system or not  In this test we use with in the load limit to estimate performance of an application Stress Testing: -  In this test we verify the peak limit of concurrent user to perform operations on application  In this test we use beyond the load limit
  • 33. 33 Endurance test: -  In this test we verify how much time continuously we can perform transactions on an application Data volume testing: -  To verify how much data we can transfer in a specified time in terms of kilobytes for second Security testing:- In this to verify privacy for end-user transactions in the application Following are factors we validate in security testing Authorization / Authentication: -  Verify app allows valid users & preventing invalid users or not Access control: -  Verify app providing right services or not based on type of user Session id: -  It is a dynamic value generated in application server when we login the application Verify session id will expire or not in following scenario  When system or application is ideal for some time after login the application  When we log out application  When we click on back arrow in browser after login Cookies: -  These are temporary files created in the local system when we access the application  Verify cookies will expire or not when we close the application
  • 34. 34 Recovery testing: - Verify how well application able to recover from abnormal state to normal state Normal state Abnormal state Recovery procedures Normal state Note: - Based on expected interruptions developers will create recovery procedures Ex: - Verify recovery copy mechanism for Ms Word application when system suddenly restarted Portability testing/compatibility testing:- Verify application support customer expected operating systems, network environment, compilers. In compatibility test we use following testing techniques Forward CT: - Verify application support higher version OS & browsers Backward CT: - Verify application support previous / lower versions of OS & browsers Configuration testing: -  It is also called as hardware compatibility testing. In this test we verify application able to support customer expected configuration systems or not like RAM, HD….etc. Installation testing: -  In this test mainly we verify application able to install as for “Read me” File guidelines or not Following are the other factors which we verify in installation testing a) Setup programs availability b) During installation any user interface messages from application c) How much memory space it occupied in hard disk d) All the related files are copied or not
  • 35. 35 e) How many instances we can install application f) Repair or uninstall programs availability g) Application name in all programs list h) Quick launch icon on desktop Sanitation testing / Garbage testing:-  In this test we verify any extra features are implemented in the application, which are not specified in the user requirements Note: - When we identify any extra features in application then we need to intimate to the client based on his feedback we report to the developers. Comparative testing/ parallel testing: -  Comparing our product with other existing competitive products in the market in order to identify strengths & weakness of our product is called “comparative testing” Based on customer expectations we can give some of the non-functionality testing techniques User acceptance testing: - It is perform after system testing by client team  The objective of UAT is to check application ready for release or not  In UAT we use 2 types of testing techniques 1) Alpha testing 2) Beta testing Alpha testing: - It is performed at developer’s side in control environment, if any defects are identified those are resolved immediately and should get approval from the client Beta testing: - It is performed at client side in uncontrolled environment, if any defects are identified those will be recorded & sent to the developers
  • 36. 36 SOFTWARE TESTING Verification (Static testing) Validation (Dynamic testing) (Are we developing right product or not) [Are we developed product . Right or not) {Preview, Walk through, Inspection Requirement review, Design review} WBT BBT UAT Developers Test Engineer Client Programming knowledge requirements knowledge Business knowledge Internal structures of app system testing App ready for release or not [Code coverage] Functionality testing Unit testing integration testing Non-Functionality testing (High & low level) Big Bang Incremental Alpha test (Dev.-con) Beta test (Cl-Un)
  • 37. 37 Some Other Testing Activities: - 1) Sanity testing 2) Ad-hoc / Random testing 3) Exploratory testing 4) Jump/monkey testing 5) Localization testing 6) Internationalization testing 7) Mutation testing 8) Re- testing 9) Regression testing 10)Maintenance testing Sanity testing (build stable or not): - It is also called as build verification test or tester acceptance test or stability test or Build acceptance test.  It is an initial validation performed by testing team whenever build deployed or installed at test environment  In sanity test we validate major functionalities of an application with valid data & navigational flow of an application to confirm build is stable or not, further activities( i.e. test cases execution or detailed validation) Note: - If sanity test failed we suspend test cases execution & we rejected the build to developers For a rejected build developing team will release Patch files to the test engineers Ad-hoc testing: - It is an informal testing activity without proper planning and documentation, It is performed like test engineer using their previous experience In following scenarios we can perform Ad-hoc testing: - 1) When requirement documents are not cleared 2) When we want to validate already tested application for confirmation 3) It is also called as Random testing Exploratory testing: - Due to lack of domain knowledge by learning application functionality test engineer validate those functionality
  • 38. 38 Jump / Monkey: -  Due to lack of time to validate major functionalities in the application.  In this scenario we select test cases based on priority Localization testing:- In this test to verify application support customer expected local languages or not Ex:- Verify WWW.google.co.in web application will support customer expected Indian local languages or not Internationalization testing: -  In this test to verify app support international languages, currency and time zone as for customer expectations Mutation testing (senior developer): -  It is performed by senior developer by changing logic in the program or unit to estimate unit testing team performance Note: - Defect seeding: - To estimate unit testing team efficiency, injecting known defects is called “Defect seeding” Re- testing: -  It is performed on modified build to check defects are resolved or not Note: - In sometimes when we validate same functionality with multiple set of test data is also called as Re-testing activity Ex: - Validity login functionality with multiple set of test data Regression testing: -  It is performed on modified build to find any side effects on existing functionalities with respect to modifications Following scenarios we perform regression testing: - 1) When defects are resolved in modified application (partial regression testing) 2) When new features are added in existing system based on change request From client {complete regression testing}
  • 39. 39 {Regression testing} {Re testing} Defect Reporting Re and Regression testing Maintenance testing:-  When new functionalities added in the system based on change request ,those we validate in this testing FRS T.E Prepare test cases BuildDev.Tm Passed Failed Developers Modified Build
  • 40. 40 Software Testing Life Cycle S/W testing is one of the phase in SDLC,whereas40% of activities performed in testing of SDLC  S/W testing is important to validate application in order to deliver reliable application to the customer  STLC describes set of activities performed by separate testing team in order to validate application as for client requirements. Following are the phases involved in STLC: - a) Test initiation b) Test planning c) Test case design d) Test execution e) Defect reporting f) Test closure Test initiation: - After getting a new project for testing test manager will initialize test activities by preparing test strategy document B.R.S & F.R.S Organization {Standards And available resources} Test strategy: - It is an organization specific document which is prepared early stages of project validation  It describes testing approach, standards to be followed during testing & available resources to validate application Following factors analysed to prepare test strategy Documents:- a) Application analysis using requirements documents like BRS & FRS b) Organization standards like CMM levels c) Available resources for Automation testing , defect reporting , configuration management . d) Risk analysis :- i) Technology Risk: - Problems related to S/w & H/w TM Test Initiation Test Strategy Doc
  • 41. 41 ii) Resource risk: - Availability of test engineers iii) Support risk: - Availability of clarification team iv) Scheduled Risk:- Factors which effect schedules to perform testing . Activities Test planning:- In this phase test lead will responsible to prepare test plan document. For any type of application a clear test plan document is mandatory for successful validation of the application. Test plan:-  It is a build oriented document  Build to build information may changes in test plan document i.e. “Dynamic Document”  It describes testing approaches, test environment, resources, test engineer names, allocated task, schedule….. etc. B.R.S & F.R.S Test Strategy Doc Build # N Components in Test Plan Document:- 1) Title:- Name of the project. Ex;-HDFC Bank System plan V1.0 2) History of the document:-  It describes author of the test plan, when test plan document prepared, when review conducted, who conducted review. Introduction:- a) Project overview:- It describes brief description about project b) Purpose of test plan:- It describes core intension of testplan TL Test planning Test Plan Document
  • 42. 42 c) Referred document:- It describes which documents are referred to prepared test plan  In general requirement documents are referred. Ex: - HDFC BANK-BRS V1.0 HDFC BANK-FRS V1.0 d) Scope:- 1) In scope:- It describes possible testing activities under current test plan document 2) Out of scope:- It describes which testing activities are not possible under current test plan document 1) Features to be tested;- It describes available module& functionally in current build to validate. 5) Features not to be tested: - It describes which modules & functionalities are not required to validate in current build. 6) Entry Criteria and Exit Criteria:- Entry criteria:- It describes when we can perform test cases execution for dynamic testing Following are the entry criteria conditions:-  All the test cases should be prepared & reviewed  Build should deployed (or) installed at test environment  Build should pass sanity test  Test sets (or)test suits should be prepared  Test environment setup should be completed Exit criteria:- It describes when we can stop testing. Following are the exit criteria conditions:-  All the test cases should be executed at least once  certain % of test cases should passed(92-95)  Defeats which are identified during execution those defects status should be “closed” or “Differed”  Budget &time constraints  When UAT completed
  • 43. 43 7) Suspension & Resumption criteria:- Suspension criteria:- It describes when we can suspend of test execution activities Following are the suspension criteria conditions:- 1) When build failed sanity test 2) When there is change request from the client 3) When there is a “showstopper/ fatal/critical defects” Resumption criteria: - It describes when we can resumed our test execution Following are the resumption criteria conditions: -  When patch is release for rejected build  When requirements are refined based on change request acceptance  When showstopper defects are resolved 8) Testing approach: - It describes testing techniques to validate corresponding test factors Ex: - Sanity test to check stability of build User interface testing to check look & feel of an application Functionality testing to check application behaviour based on user operations 9) Roles& Responsibilities:- It describes test engineers names & allocated task. 10) Test Deliverables:- It describes which documents we need to prepare during testing & which we deliver to the client
  • 44. 44 Ex:-  Test cases review report  Requirement traceability matrix (RTM)  Defects profile  Test summary report Test Environment:-  It is also called “Test bed”  it describes S/W &H/W configuration in the system to perform test execution  In general test environment will be designed based on client live environment Risks & mitigations:- It describes possible risks at test environment & solutions for those risks Training needs:- It describes required training sessions for testing team Schedule:- It describes time lines to perform each testing activity. NOTE:-After preparing test plan document test lead will conduct review on test plan document along with senior teat engineers, after review test plan document deliver to the test engineers. Test Case Design:- In this phase test engineer is responsible to derive test cases for allocated module. B.R.S & F.R.S Use Case Doc Test Scenarios TE Test Case Design Test Case Design Doc
  • 45. 45 Test case:- It consist set of steps (or) sequence of steps with the user action and subsequent response from the system  Test case describes validation procedure of the each functionality in the system  Every test case should have “Pre-Condition” (when to execute Tc) Pre-condition:- It describes things to ensure in AUT before execution of Test case [i.e. When to execute Test case] Ex:- 1) verify delete mail functionality in Gmail inbox Precondition:- There should be some mails exit in Gmail inbox Ex:- To verify login validation Precondition:- There should be some existing users for that application. Inputs to Derive Test cases:- 1) Requirements like BRS & FRS 2) Use Cases:-  It is an optional document, when requirements are complex to understand in FRS then they provide use cases for us.  Use case describes functionality behaviour from user prospective in terms of “Actors action” &“system response” “Better under standbility of FRS we use cases” 3) Test scenario:- “It describes functionality /Requirement /Test condition which we need to validate” Note:- Test scenarios are not mandatory for projects Advantages of Test Scenarios:-
  • 46. 46  Based on test scenario we can identify number of test cases need to be drafted  it will give the complete test coverage with the test cases Note:- A scenario can have one (or) more test cases. Difference among the use cases, test scenario, test case Use Case Test Scenario Test Case  It describes the functionality behavior {How system Should work}  It describes the test condition or a requirement to validate {What to test}  It describes the Execution/validation Procedure[How to Test] Fundamentals of Test Cases:-  Every test case should be simple, easy and understandable  There is no duplicate test cases  Test cases should be consistent Following are the Test case Design Techniques:-  Boundary value analysis (range or size)  Equivalence class partition (data type) Error Guessing:-  It is an experience based technique there is no specific format.  In general Domain experts/Functionality expert will identify possible number of test cases related to error guessing techniques. Types of test cases:- There can be 4 types of test cases 1) User interference TC’S:- These tc’s are derived to verify look &feel of the application Ex;- Availability of components, front size or front style… etc. 2) Usability Test cases:- These TC’S are derived to verify user friendliness of app to perform operations
  • 47. 47 Ex;- Error messages, tab implementation, function key implementation…etc. 3) Validation TC’S:-  These TC’S are derived to validate application input object  These also called as field level validation test cases Ex:- List box, Edit box. 4) Functionality Test cases:- These test cases are derived to validate application behaviour based on user operations. Ex:- Push button, image link, text link Note:-  Usability, uses interface and validation Tc’s will be part in functionality Tc’s  based on functionality & validation there can be 2 types of Tc’s Positive Test cases:- Test cases which have the primary flow of events or +ve flow of events to validate Ex:- Test case with valid inputs Negative Test cases:- Test cases which have the –ve flow of events or alternative flow of events to validate. Test Case Template:-  In general organizations maintain their own templates to derive test cases.  Template contains predefined components to prepare test case Project: - Name of the project Module: - Name of the module Created by: - Name of the test engineer. Created on: - On which date test cases are derived. Reviewed By: - Person responsible to conduct review on Test cases. Review on:- On which date review conducted. Referred documents: - i/p s to derive Test cases like requirement document.
  • 48. 48 Test case Id (or) Name:-  It is a unique identifier for Test case which should be unique for entire project  In general provide name for a Test case we should follow some format:  Tco1-Project Name-Module-Functionality. Test case Description:-  It describes core intension or objective of test case. Priority:-  Describes importance of test case for execution  Priority is derived based on importance of functionality with respect to client business needs  There can be 3 levels of priority 1) High 2) Medium 3) low Advantages of Priority:-  Due to lack of time we can execute first high priority Test cases and next level priority Test cases. Step Name:-  It describes no of steps in a test case Ex:- step1, step2…….. Etc. Test Data:-  It describes i/p provided to the system during execution of test case.  Test Engineer need to identify required test data and that should be provided under “Test Data” column. Step Description:-  Describes user action /operation to be performed on the application during execution of test cases. Note:- In a test case every step should describe at least one user operation and subsequent response from the system.
  • 49. 49 Expected Result:-  It is an expected behaviour of the Application Under Test(AUT)  Expected result will be drafted from the client requirements. Actual Result:-  It describes actual behaviour of the Application Under Test(AUT) or System Under Test(SUT)  Actual result will be drafted from AUT Status:-  It describes status of steps in terms of pass or fail. Pass:-  When expected result matches with actual result Fail:-  When expected result not matches with actual result Note:- Actual result & status both are provided during Test cases execution time. QC path /subject:-  In general we derive Test cases in excel sheet and then we export those test cases into QC. Note:- To export Test cases from Excel sheet to Quality centre we should have Excel Add-In’s for quality centre. EX:- Write test case to verify delete functionality in Gmail- inbox. Project : Gmail Reviewed By : Module : Inbox Reviewed On : Created By : Shiva Referred Doc : Gmail-BRS v1.0 Gmail-FRS v1.0 Created On : _/_/_
  • 50. 50 Ex:- Write Test cases for a login window functionalities validation in flight reservation application. Business Rules:- 1) Application path ”c:program filesHpQuick test professionalsamples fightappflight4a.exe” 2) Login window should contain “Agent name:”, “password:”,edit boxes ,ok,cancel and Help buttons& flight image 3) Existing Agent name =”Ravi”& password=”mercury” 4) Cancel button to close login window 5) Help button to get information based on control in agent name & password fields. Test scenarios:- Tso1:- Launching application Tso2:- Login validation Tso3:- closing login window Tso4:- Help functionality Test Case Id/Name Test Case Description Priority Step Name Test Data Step Description Expected Result Tco1- Gmail- Inbox- Delete mail Functionalit y This test case to verify delete mail functionality Medium Step1 Select one mail and click on delete Selected mail should be deleted Step2 Select More than one mail and click on delete Selected mails should be deleted Step3 Open mail and click on delete Opened mail should be deleted Step4 Select mails read/unread criteria Corresponding mails should be deleted. Step 5 Click on delete without select Error message should be popup Step6 Select all the mails and click on delete All mails should be deleted
  • 51. 51 Test Cases Review:- After writing test cases review will be conducted to check correctness & completeness of the Test cases.  Test cases review will be conducted in 2 levels Peer Review:-  Within the TE’s by interchanging they written test cases review will be conducted . Test Lead’s Review:-  After peer review test cases send to test lead where Test Lead will conduct review to conform written test cases are sufficient or not to validate the application. Requirement Traceability Matrix:-  During Test cases review we prepare RTM/TM in order to analyse all the requirements covered or not with written test cases.  To prepare RTM/TM we map the each Test case to the corresponding requirement. Ex;- Prepare Traceability matrix for login window Test case coverage Test Execution:-  After test case review test lead will give the permission to execute test cases in order to validate application  In generally test cases are not executed individually, whereas we prepare Test set /Test suits/Test Batch and those are taken for execution activity. Req.ID Test Scenario/Requirement TC ID/Name TC Description
  • 52. 52 Test Set:-  It is a collection of Test cases based on the application flow or dependency of functionalities in application.  Test Set will help to analyse test execution coverage & it is easy to execute test case. Test Execution Flow:- Defect Fixing Release patch Following are the Test execution Levels:- Level-o: Sanity/Smoke Test:-  It is performed whenever build deployed /installed at test environment. Developers Testing Team Level-0 Sanity/Smoke Level-0 Real/Compreh ensive Testing Failed Mismatch Level-2 Re& Regression Testing Modified Build No mismatches Level-3 : Final Regression Testing UAT Test Closure
  • 53. 53  In this test major functionalities we validate to conform build is stable or not for further testing activities. Level-1: Real Testing/Comprehensive Testing:-  When build is stable then we execute test cases using test sets/test suits in order to validate application. Following are the activities performed by Test Engineer during test cases execution:[Manual Testing Approach] Step1:- Perform operation on AUT as for “Step description” in the test case Step2:-Verify actual behaviour of application with respect to “Expected Result” in . test case. Step3:- Record actual behaviour of AUT under “actual result” column & provide . . . “status” for a step.  Following are the statuses for Test cases:- Passed:- When excepted results matching with actual results Failed;- If any deviation b/w expected result & actual result Blocked;- Due to parent functionality failure, when Test case not possible to execute . in the current test then provide status as Blocked. Not Completed:- When some of the status in a test case not at executed. No Run:- When the test case not at executed, it is a default status for a test case. Level 2:Re& regression testing :- Re testing:- It is performed on modified build to ensure defects are resolved or not. Regression Testing:- It is performed to find any side effects on existing system with respect to modifications. Note:- Re-testing & Regression testing will be performed in the same level. Level3: Final Regression Testing:-  It is also called as “Pre-Release testing or “End to End scenario testing”  In this test some of the functionalities are validated from login session to logout session based on defect density during comprehensive testing.
  • 54. 54 Defect Density:- Number of defects identified in a specific area or module Defect Reporting:-  During Test cases execution if any defects are identified then Test Engineer should prepare defect profile and those are sent to the test lead and developers.  In general defects can reported manually or using some of the defect reporting tools like Quality centre is a HP product, Clear Quest is IBM product Defect Template:- 1) Defect ID:- 2) Reported By:- 3) Reported On:- 4) Reported To:- 5) Test Set:- Name of test set in which test case fail, Test case id/Name: Name . of the test case along with the step which have the deviation. 6) Project: - Name of the project 7) Module: - In which module defect identified. 8) Build version Id: - Version number 9) Reproducible defect: - (yes/no)  When defect is identified then test engineers has to recheck the same functionality , If defect is raised again then it will be considered as “Reproducible Defect”  During rechecking the functionality defect is not raised then it will be consider as not reproducible defect Note :- When defect is reproducible then we need to provide more information to developers like defect snapshot& reproducible steps in a test case 10)Priority:-It describes importance of the defect to resolve , When as priority defined importance of the functionality in which we identified defect There can be 3 levels of priority a) High b) Medium c) Low
  • 55. 55 11)Severity:-  It describes seriousness of the defect in the system functionality to execute other test cases.  It also describes the impact of the defect in the system functionality There can be 4 levels of severity 1) Critical fatal: - There is no work around to continue the test execution without . solving those defects 2) High: - It is a high functionality defect where we have work around to continue test execution 3) Medium:- For medium and low functionalities defects 4) Low: - For look & feel and usability related defects. Note: - Priority and severity both are called “Defect parameters based on that developers will identify which defects they need to resolve first. 12)Status: - It describes scale of the defect, In general when we report 1st time to developers which have the status as “New” 13)Summary: - It describes brief description about the defect Summary Defect ID : Project : Reported by : Module : Reported on : Build : Reported to : Version ID : Reproducible : Priority : Severity : Defect life cycle: - It describes various status of defects from it identification to closed. (Or) The time gap between defect identification time to defect closed time is called ”Defect Life cycle” Following are the status provided by Test Engineer: - New: - When 1st time we reporting about deviation to developers Closed: - When test engineer satisfied about defect resolve work in modified build .
  • 56. 56 ……………………………Development Team………………………………… Start Is it a new test Select the test case for execution Analyse Result Prepare a defect report with Status=New and send to Dev. Team Is it in scope Is it already reported? Status=Rejected Status=Duplicate Defect accepted by Dev. Team: Status=Open Dev. Team Resolves the defect: Status=Fixed End DLC End DLC Document the Result and move to next test case Re testing and Regression testing Is Defect Fixed? Defect can be closed Status=Closed Need to Reopen the defect: Status=Reopen
  • 57. 57 Following are the status provided by Developers:- 1) Duplicate: - When defect is similar to earlier defect 2) Add: - When developers require more information about defect. 3) Rejected: - When developers are not accepting that as a defect. 4) Defect: - Developers are accepted that as a defect but those defects will be consider in the next release of the application to the customer due to low priority & low severity 5) Open: - When developers are accepted i.e. defect & they are ready to resolve 6) Fixed: - When defect is resolved in modified build. 7) Defect age: - The time gap b/w the defect identification date to closed date. 8) Later defect: - Defects which are identified in the later stages of testing . 9) Marked defects: - some defects may hide some other defects 10)User acceptance test completed: -Test lead will analysed exit criteria condition which are specified in the test plan to stop the testing activities. Test closure: - It is performed by test lead after execution of all the test cases & user acceptance test completed. Ex: - 1 Test cases for 1litere bottle.  Verify company name  Verify quantity as 1litere or not  Verify price of water bottle  Verify bottle sealed or not.  Verify manufacturing &expire date.  Verify purity of water  Verify colour of water bottle  Verify cooling capacity of water bottle Ex:2 Test cases for 4 GB Pen drive  Verify company name  Verify memory capacity  Verify price of pen drive  Verify warranty for a pen drive  Verify model of pen drive  Verify pen drive detecting or not
  • 58. 58  Verify operations on pen drive like copy, paste, Delete, save & format  Verify pen drive allowing 4 GB data or not to save  Verify pen drive providing any information or not when we try to save more than 4GB data  Verify safe removal operation  Verify impact on existing data when pen drive removed during process Test cases for a Lift which allows maximum 6 persons  Verify lift allows 6 persons or not  Verify doors will close automatic or manual  Verify power consumption  Verify lift providing any information or not when it is over loaded  Verify lift should not move when doors not closed properly  Verify lift will stop correct floor level or not  Verify lift providing correct floor numbers or not  Verify lift providing any information or not on which direction it is moving  Verify possibility to open doors in emergency  Verify internal switch board working condition  Verify how lift will stop when we operates different floor numbers randomly  Verify light working condition. Ex: - TC’s for following components 1) Teacup 2) Pen 3) watch 4) Mobile 5) Phone 6) Fan Ex: - TC’s for employee search page business needs 1) Application URL: - www.Empsearch.com 2) Employee search page should contain Emp.Name:,Emp.Dept.:,Date of Joining(From: and To: ) input fields,Search,clear button and search result table. 3) We can search employee record using either Emp name or Emp.Dept or DOJ. 4) Clear button should clear the data.