Discussion Materials
Overview of the Power Sector in South Africa
22 September 2015
Overview of the Power Sector in South Africa
2012A 2017E CAGR12-17
Capacity (MW) 44, 289 57, 462 5.4%
Net Capacity Addition (MW) - 13, 173 -
Electrification rate 76% - -
Capacity by Fuel
South African Electricity Market
Key Statistics Market Overview
Capacity Evolution
44,289 45,561
49,579
52,478
55,462 57,462
0
20,000
40,000
60,000
2012 2013 2014 2015 2016 2017
MW
81%
16%
3%
___________________________
Source: BMI Country Report. http://www.ipp-projects.co.za/
Note: (1 ) IRP 2014 is still in draft form and is yet to be promulgated
91%
5% 4%
Governing
bodies
 The Department of Energy (DOE) and the National Energy Regulator of South
Africa (“NERSA”) are responsible for setting energy policies and regulation of
the energy sector respectively
 They determine critical aspects such as the framework for procurement of new
generation capacity and consumer pricing regimes
Market
 South Africa’s electricity market is dominated by the 100% state –owned utility
Eskom which generates 95% of the electricity produced in the country and 45%
of electricity produced on the continent
 As the only transmission licensee, Eskom is responsible for all transmitted
electricity
 Distribution is shared between Eskom, municipalities and other licensed
distributors
Energy
Agenda
 The DOE’s Integrated Resource Plan (“IRP”) 2010 to 2030 (1) puts a framework
in place that sets out the scale and mix of new electricity required over the next
two decades
 Programmes identified in the IRP include:
 The Renewable Energy Independent Power Producer Procurement
(REIPPP) Programme which is aimed at procuring 6,925 MW of renewable
energy
 The base-load programme which is aimed at procuring 7,761 MW of base
load capacity comprising 2,500MW from coal , 2,652MW of gas power and
2,609 MW of imported hydro power . The Minister has since released a
Ministerial Determination for 3,126MWs of gas-to-power projects.
 “The medium term risk mitigation” programme aimed at mitigating against
supply-demand shortfalls in the medium term, comprising 800 MW from
cogeneration and 474 MW of natural gas
 DOE Peaker programme is a long standing DOE initiative that involves
purchasing power from independently owned Avon (670 MW) and Dedisa (335
MW) power plants (OCGTs)
Natural
Resources
 South Africa has the world's ninth-largest amount of recoverable coal reserves
and holds 95% of Africa's total coal reserves
 Positioned as the fifth-largest gold producer and accounts for over 6% of the
world’s output
 In 2013, accounted for an annual production of c. 5 million ounces
 South Africa is also one of the world’s largest producer of platinum
 In 2013, provided two thirds of the world’s platinum mining output
 South Africa produces about 190,000 barrels of oils each and every day land is
looking into more prospects with the opening up of new oil wells to expand the
business
 Currently importing oil and have not reached a capacity to export any oil
From 2014 to 2017
 4800 MW of REIPPP projects
 + 800 MW cogeneration + 474MW natural gas, medium term risk mitigation
programme
 +/- 1800 MW of Eskom large coal projects (Medupi and Kusile)
Contentional Thermal
Renewables (incl. hydro)
Non Hydro Renewables
1
South African Electricity Market (cont’d)
Overview
 The generation landscape is gradually shifting
from single player dominance to a relatively
open/competitive system
 Single buyer model – Eskom monopoly
 Interface with IPPs through 2 units. (i)
Eskom’s grid access unit managing
connection to the grid (ii) Single Buyer Office
(“SBO”) buying power from IPPs
 Eskom distributes close to 60% of electricity
sales with municipalities and other licensed
distributors distributing the balance of
electricity sales
Participants
 Eskom the 100% state owned utility generates
c. 95% of South Africa’s electricity
 Eskom operates 27 power stations with a total
nominal capacity of 41,995 MW, comprising
35 726 MW of coal fired stations, 1 860 MW of
nuclear, 2 409 MW of gas fired, 2 000 MW
hydro-and pumped storage as well as a 3 MW
wind farm
 Transmits, distributes and retails electricity
 Length of power lines : 359,337 km
 # of customers: 800 Municipalities, 3 000
industrial, 1000 mining, 50 000 commercial,
84 000 agricultural and 5.1million residential
 Supply sales (TWh): 217.903
IPPs(1)  The REIPPP programme
 Launched in 2011 and has generated a
total of 64 renewable energy IPPs across
3 of 5 competitive bidding rounds
 The 92 successful projects incorporate
more than 100 different shareholder
entities
 Prominent equity players across the
bidding rounds include AIIM, Mainstream,
Mulilo and Enel Green Power amongst
others
 DOE Peaker programme
 On June 2013, a consortium led by GDF
SUEZ signed PPAs with Eskom for two
greenfield open-cycle turbine power
plants with a combined capacity of 1 005
MW
Municipalities &
licensed
distributors
 Distributes c. 40% of electricity sales to
customers. Key Municipalities include:
 Buffalo City
 City of Cape Town
 City of Johannesburg
 eThekwini Electricity
 Ekurhuleni Metropolitan
 City Power Johannesburg
 Grid length: undisclosed
 Supply sales (TWh): undisclosed
 Ownership: 100% state owned
Generation
Transmission/
Distribution
Wholesale / Retail
___________________________
Source: Company data, Press.
Note: (1 ) South Africa’s Renewable Energy IPP Procurement Programme: Success Factors and Lessons, World Bank Group
2
South African Electricity Market (cont’d)
South Africa Transmission Network
Regional Interconnection Grid
Northern Cape
Eastern Cape
Limpopo
Free State
Western Cape
North West
KwaZulu-Natal
Mpumalanga
Gauteng
Substations Future
Substations Current
Lines Future
132
220
275
400
765
Lines Currrent
132
220
275
400
533
765
ture
220
275
400
765
Lines Currrent
132
220
275
400
533
765
___________________________
1. Eskom website, SAPP website.
Comments
 The Strategic Grid Plan represents the transmission network
infrastructure requirements for a period of 10 years and is
updated annually
 The purpose is to optimally and reliably transport the power
from the source of generation to the location of the load
 South Africa’s Eskom forms part of the Southern Africa Power
Pool (“SAPP”)
 SAPP was formed to provide reliable and economical
electricity supply for the consumers of each SAPP member
consistent with the reasonable use of natural resources and
the effect of the environment
 Eskom exports power to SAPPP as a member of Southern
Africa Development Community (“SADC”)
 EDM of Mozambique, ZESA of Mozambique and Eskom of
South Africa have MoUs to develop interconnectors to
increase power transfers and stability within the SAPP network
 The Interconnector projects will involve the separate
development of the following sections of the project
 In Zimbabwe
 400/330 kV new substation at Triangle
 400/330 kV new substation at Orange Grove
 Zimbabwe to South Africa
 275km 400kV line Triangle-Nzhelele Interconnector
(Zimbabwe-RSA)
 New Nzhelele substation 400kV line bay
 Zimbabwe to Mozambique
 185km 400kV line Orange Grove – Inchope
Interconnector (Zimbabwe-Mozambique)
 Establishment of the new 400/220kV Inchope
Substation in Mozambique
 360km 400kV Inchope - Matambo line
 115km 400kV Matambo – Songo line
3
South Africa Renewable Energy IPP Programme Overview
REIPPP Overview
General REIPPP RequirementsREIPPP Overview
IPP
PPA
National Energy Regulator of
South Africa (NERSA)
Eskom (State Owned Utility)
South Africa
Department of Energy (DoE)Implementation Agreement
Generation
Licence
Connection Agreement
REIPPP
Programme
 The South African government’s Integrated Resource Plan (“IRP”)
sets an ambitious target to add 50,000 MW of new generation
capacity to the South African grid by 2028 with renewable energy
technologies accounting for approximately 42 per cent of this target
 It is against this background that the South African government,
through the Department of Energy (“DoE”), launched the
Renewable Energy IPP Procurement Programme in August 2011
 Under the programme, the DoE initially mandated the procurement
of up to 3,625 MW from IPPs of various renewable energy
technologies including : wind, solar photovoltaic, concentrated
solar power, biogas, biomass, small hydro and landfill gas. An
additional 3,100 MW was subsequently made available for
procurement under the REIPP Procurement Programme
REIPPP
Tender
Design
 Under the REIPP programme, bids are invited from developers in
sequential bidding rounds, or “windows”. To date, there have been
four bidding windows, with the fifth expected to take place in early
2016. Potential bidders are required to register basic details of their
proposed project(s) approximately two months ahead of the
relevant bid window and unsuccessful projects can be bid again in
future windows
 In each bid window, a maximum number of megawatts is made
available for each applicable technology and a price cap is set
(although the DoE has now removed the price cap for all the
technologies, having concluded that intense competition has driven
down prices and rendered a cap redundant)
Project
Structure
 This requires a bidder to provide, among other things, a
structural diagram showing its debt and equity participants,
contractors and key equipment suppliers
Legal
Requirements
 This requires a bidder to indicate, among other things, its
acceptance of the terms of the PPA, IA and the other
designated project agreements
Land
Requirements
 This requires a bidder to show, among other things, that it has
secured the project site, identified all permits and licences
required for the project with respect to land rezoning,
subdivision and water use
Environmental
Requirements
 A bidder must provide, among other things, the environmental
authorisation and related documents
Financial
Requirements
 This requires a bidder to specify, among other things, its
price, identify its method of financing the project and
demonstrate that it has made sufficient progress in securing
financing for its project and the necessary proof of its ability to
raise such financing
Technical
Requirements
 A bidder is required to provide, among other things,
information on the technology to be used, resource data,
contractor capability and track record and a cost estimate
letter for grid connection
Economic
Development
 A bidder must make binding commitments (during both
construction and operations phase) with respect to share
ownership by black South Africans and local communities,
local content, job creation, preferential procurement,
management control, socio-economic development and
enterprise development
Value for
Money
 Each project must provide net benefit to the South African
government and consumer taking into account, without
limitation, the price offered, the bidder’s internal rate of return
and level of success payments
 The bid documents contain detailed and complex requirements. Bid responses must
comply with all of the qualification criteria to be compliant
 The qualification criteria requires bidders to provide detailed responses as to the extent
of their readiness to deliver their projects in key areas such as project structure,
compliance with specific legal, land, environmental, financial, technical and economic
development requirements. Detail on each of these requirements is shown below:
 The commercial structure of the REIPPP is shown below:
4
South Africa Power and Energy Sector Overview
IPP Procurement Programmes
Renewable
Energy
Program
 Total of 7, 025 MWs of renewable energy
across five different phases
 Technologies include wind, solar pv,
solar thermal, biomass, mini-hydro, landfill
gas
 Program is currently in its fourth phase
Baseload
IPP
Procureme
nt Program
 Coal - 2,500 MWs which will be divided
into
two phases to commence in 2015
 Import hydro - 2,690 MWs
 Gas – 3,126 MWs
Medium
Term Risk
Mitigation
Projects
 Cogeneration - 800 MWs
 Gas OCGT/ (MTRMP) - 474 MWs
 The cogeneration
programme is expected to
commence in Q3 2015
You may be interested in the upcoming 2,500MW coal baseload programme and the 3,126 MW gas
baseload programme
 A summary of the IPP programmes is shown below:
2,500
2,690
2,652 7,842
Coal Import Hydro Gas Total
MW
800
474 1,274MW
Cogeneration Gas
OCGT
Total
The Energy Regulatory Framework
 South Africa has put into place transformative policies to ensure energy supply
security and this is demonstrated in a number of legislative actions including the
White Paper on the Renewable Energy Policy of RSA (2003), the National Energy
Bill (2008), and the National Energy Act (2008)
 The Integrated Resource Plan 2010-2030 (“IRP 2010”) developed by the
Department of Energy (“DoE”) is a public policy document that outlines the energy
mix contemplated for South Africa until 2030
 The DoE is in the process of implementing the following IPP Programmes:
Renewable Independent Power Producer Procurement Programme (“REIPPPP”),
the Baseload IPP Procurement Programme and the Medium Term Risk Mitigation
Programme
Successful Renewable Programme to Date
Commentary
 There is an immediate opportunity to participate in the Coal Baseload Programme
 The Coal Baseload Programme Request For Proposals document (“Coal RFP”)
was released on 15 December 2014 to potential bidders and bid responses for
round 1 of the programme will be due on 8 June 2014
 The Coal RFP states that a total of 1,600 MWs will be procured in round 1 of the
programme with 1,000 MWs being allocated to projects within South Africa and 600
MWs from outside of South Africa
 There is a longer term opportunity to participate in the gas baseload programme
and the hydro programme which will be undertaken following the coal base load
programme
2,820
3,325
600 280 7,025
Solar PV Wind CSP Other Total
MW
___________________________
Source: NIPP website, Department of Energy website
 The REIPPP programme has generated 92 new renewable energy IPPs across the
four bidding rounds to date totaling R193 billion in investment has been committed
for the construction of over 6,200 MWs of capacity in technologies like onshore
wind, solar PV and concentrated solar power
 The DOE issued a media statement in April 2015 stating the intention to launch an
expedited procurement process of 1,800 MWs from all renewable technologies. The
RFP was issued in June 2015
Energy
Allocation per
Determination
Energy
allocated
(Round 1- 4)
Remaining
Energy (MW)
Remaining
Energy
(%)
Wind 3 325 MWs 2 656 MWs 669 MWs 20%
Solar PV 2 820 MWs 1 899 MWs 921 MWs 33%
CSP 600 MWs 600 MWs 0 MWs 0%
Landfill/ Biomass/
Hydro/ Biogas
280 MWs 79 MWs 201 MWs 72%
5
REIPPP Overview (Cont)
REIPPP Programme to Date
REIPPP Competitiveness & Trends(1)
Socio Economic Features of REIPPP
South African
Participation
 A bidder must ensure that at least 40 per cent of the beneficial
shareholding in the project company is directly or indirectly held
by South African citizens
Job Creation
 Each bidder must make commitments to ensure that a certain
percentage of its employees during the construction and
operation phase are South African citizens of which a certain
percentage must be black South Africans
Local Content
 This is intended to measure the construction expenditure of a
project and to express the South African products and services
component as a percentage of the total project cost
 Local content minimum threshold requirements have increased
and require a minimum SA entity participation of 40%, a BEE
contributor status level of 5, indicating the extent of the South
African entity participation
Local
Community
Ownership
 This requires a bidder to ensure that the project company
allocates a certain percentage of its ultimate beneficial
shareholding to local communities this requires a bidder to
ensure that the project company allocates a certain percentage
of its ultimate beneficial shareholding to local communities
Socio
Economic
Development
 This requires a bidder to identify socio-economic needs of the
surrounding communities where the project site will be located
and formulate strategies on how such needs could be met
utilising the socio-economic development financial contributions
Management
Control
 Commitments that a certain percentage of the project
company’s management will comprise black South Africans
Enterprise
Development
 Commitments to initiatives that will enhance the capacity of
emerging businesses owned/controlled by black South Africans
Preferential
Procurement
 Commitments to procure goods and services from businesses
owned or controlled by black South Africans
 The REIPPP programme has generated 92 new renewable energy IPPs across the
four bidding rounds to date
 R193 billion in investment has been committed for the construction of over 6,200 MW
of capacity in technologies like onshore wind, solar PV and concentrated solar power
 The DOE issued a media statement in April 2015 stating the intention to launch an
expedited procurement process of 1800MW from all renewable technologies. The RFP
has been issued
114.3
275.8 302
-
89.7
164.5
282
140
65.6 88.1
164
0
100
200
300
400
Onshore Wind Solar
PV
Concentrated
Solar Power
Biomass
REIPPP 1 Average Bid Prices REIPPP 2 Average Bid Prices REIPPP 3 Average Bid Prices
Project
Evaluation
 Project evaluation is based on a weighting of 70:30 ratio of price to
economic development criteria
Average
Tariffs
 Increased competition across the bidding rounds have seen
average tariffs of IPP preferred bidders drop dramatically
 Onshore wind tariffs have dropped close to 43% ,with Solar PV
tariffs having dropped 68% and concentrated solar power tariffs
having dropped close to 46%
 Certain criteria have been designed to advance the South African government’s socio-
economic development policy objectives
 Most of these criteria have minimum compliance thresholds as well as higher targets
which a bidder can commit to if it wishes to enhance the competitiveness of a bid at the
evaluation stage.
ZAR cents / kWh
Technology,
MW
Round 1 Round 2 Round 3
Round
3.5
Round 4
Round
4.5
MW Capacity
remaining
Solar PV 631.8 417.12 435 415 687 626.08
Wind 634.10 558.90 787 676 398 664
CSP 150 50 200 200 - -
Small hydro - 14.40 - 5 115.6
Landfill Gas - - 18 - 7
Biomass - - 16 25 19
Biogas - - - - 60
Total 1,415.9 1,040.42 1,456 200 1,121 1,085 1,691.68
___________________________
Source: Company data, http://www.energy.gov.za/IPP/List-of-IPP-Preferred-Bidders-Window-three-04Nov2013.pdf
1. Refers to Round 1 to 3.
6
REIPPP Overview (Cont)
 One qualification criteria which has become a key part of the programme is the
engineering, procurement and construction (“EPC”) arrangements. A bidder has to
provide details of its EPC contractor, including its track record and capability in building
the power plant
 Although this is not a specific bid compliance requirement, a competitive EPC price is
essential for a successful project and a balance needs to be struck between risk transfer
to the EPC contractor and price. Lenders will want the project company to be insulated
from risk, yet a blanket approach will not be accepted in the market. With experienced
and well resourced sponsors in place, there is scope for the project company to take on
appropriate risks – but this is all in the context of fixed “upstream” project documents (the
PPA and IA) that govern the process and place fixed obligations and timings on the
project company.
 These documents (and their impact on the EPC and operations and maintenance
arrangements) need to be understood, as they establish a framework for the
construction and operation of the projects.
 The correct flow-through of processes (in particular during commissioning and
commercial operation) and project relief (whereby the EPC contractor’s relief under the
EPC contract is limited to that which the project company obtains under the project
documents) are essential and must be considered pragmatically and commercially.
 Other key issues that need to be addressed include:
 dealing with delays caused by Eskom (in particular in relation to grid connection);
 site risk under the PPA;
 site access;
 payment structures and security;
 how issues particular to the local construction market can impact on construction
and operation;
 exchange rate risk;
 economic development obligations; and
 access to the transmission or distribution system.
 With continued pressure on tariff pricing there may be a move towards split contract
structures (where the project company employs an equipment supplier and a separate
balance of plant contractor – and manages the interface between the two).
The Role of EPC & Bidding Considerations Challenges and Lessons Learned
Simplified
Bidding
Requireme
nts
 The cost of bidding has been high due to the detailed and complex
nature of the bidding requirements. The DoE has sought to simplify
bidding requirements (and therefore lower bidding costs) by making
the following changes to the bid documents for the remaining
bidding rounds:
 Bidders no longer need to submit shareholders’ agreements in
respect of the project company or heads of terms with their
contractors and key equipment suppliers at the time of
submission. This eliminates advisory and other associated
costs incurred through negotiating these documents at the bid
stage;
 Certain licences and consents are not required until the
preferred bidder stage;
 The terms on which lenders can issue a letter of support to
provide debt financing have been relaxed; and
 Bidders only need to provide two hard copies and a soft copy
of the bid response as opposed to seven hard copies and
seven soft copies as was the case in previous bid windows.
Licenses
and
Consents
 Currently, the requisite licences and consents are obtained under
different pieces of legislation and from different government
departments with different timings and procedures. A single
umbrella legal framework for renewable energy procurement with a
“one-stop shop” government department for licenses and
consents would make the bidding process more efficient and this
would also help reduce the costs associated with liaising with
different departments
Project Site
 Securing the project site is a key component of the bidding process.
It is therefore important for a bidder to identify the project site and
conclude the necessary contracts in sufficient time to ensure that
the land arrangements meet land use and acquisition criteria. It is
also important for bidders to resolve any land tenure issues such as
any third party rights, existing mortgages
Grid
Connection
 Due to financial constraints, there have been concerns regarding
Eskom’s ability to build the network infrastructure necessary to
connect the large number of successful projects to enable them to
achieve commercial operations within the time frames specified in
the PPAs. In addition, grid connection costs have now become an
issue as the initial cost estimate letters provided by Eskom at bid
submission vary substantially from subsequent budget quotes
provided to preferred bidders. This has caused a delay in
successful third bid window projects reaching financial close
7
REIPPPP: Expedited Bid Submission Window
The Minister of Energy announced that the Department of Energy would be issuing Request for Proposals
(“RFP”) for an expedited renewable energy IPP procurement process, for which 1,800 MW would be allocated
MW Allocation and New Price Caps
Key Dates
Overview
650
520
450
100
40 25 15
0
100
200
300
400
500
600
700
Onshore
wind
Solar PV CSP Biomass Small hydro Biogas Landfill gas
R760/
MWh
R870/
MWh
1,370/
MWh
1475/
MWh
1117/
MWh
1475/
MWh
990/
MWh
 The Expedited Bid Submission Window (“EW”) was
released June 2015 by the Department of Energy (“DoE”)
 The EW is open to all projects that are ready for
submission within the required timelines, and not only to
projects which were unsuccessful in previous bid
submission phases
 The Minister has allocated 1,800 MW to be allocated during
the EW. However, the Department is not obliged to allocate
all 1,800 MW during the EW
 It is also anticipated that the Minister will issue a Third
Determination that will provide for the procurement of a
further 6,300 MW to be generated from renewable energy
sources
 The EW RFP is one of the various procurement processes
that the Government will develop to procure this further
generation capacity from renewable energy sources
 Interested parties have until 6 October to respond to the
RFP, the DoE has advised bidders to apply for cost
estimate letters from the relevant grid provider as soon as
possible
The Price caps per Technology have been updated. Notably the Department has elected
once more to impose a Price cap on Onshore Wind and Solar PV technologies. Previously,
the Price cap was removed for these Technologies
3 Jul ‘15 8 Sept ‘15 8 Oct ‘15
Release of the EW
RFP volumes
Expedited bid
submission date
Signing of PPA, IA, DA, Connection
Agreements and Financial Close
11 Dec ‘15 31 Jul ‘16 31 Dec ‘19
Bid registration date Announcement of
preferred bidders
COD proposed by a bidder to
fall before D3c 2019
___________________________
Source: IPPRenewables
MW
8
Cogeneration IPP Procurement Programme Overview
On 4 June 2015, the DoE issued request for bids for the Cogeneration Independent
Power Producers Procurement Programme due 10 August 2015
MW Allocation & Price Caps
Key Dates
 The DoE issued a request for bids for the Cogeneration IPPP. The
total MW is 800MW to be allocated for the first bid window across the
technologies is as follows:
 Waste to Energy (200MW): The primary permitted fuels are
waste heat, process furnace off-gas and any other non-
renewable energetic waste emitted from an industrial process.
However waste or discard coal is not a permitted primary fuel
under the programme
 Combined Heat and Power (250MW): The primary permitted
fuels are coal, waste or discard coal, natural gas and primary
liquid fuels
 Industrial Biomass (350MW): The primary permitted fuels are
sugar bagasse, field trash and other sugar related renewable
wastes associated with the host facility process; mill wastes,
including chips, saw dust, shavings, soaps, methanol, sludges,
bark and black liquor; and agricultural or forestry residue
including alien vegetation clearing
 It is anticipated that there will be four bidding windows under the
Cogen IPP Procurement
 The first bidding window bid submission date and announcement
date on 10 August 2015 and 17 September 2015 respectively
 It is anticipated that the second bid submission date will be 1
September 2015, the third bid submission date will be 27
October 2015 and the fourth bid submission date will be 23
November 2015
Overview
22 Jul ‘15
10 Aug
‘15
17Sept
‘15
Notify DoE on intention to
submit a bid response
Announcement of
preferred bidders
11 Nov
‘16
Bid registration date
due
Projects bid to reach
COD before this date
R0.90 /kWh
350
250
200
0
100
200
300
400
Industrial Biomass Combined Heat and Power Waste to Energy
MW
R1.00/kWh R1.20 /kWh
Price caps for each technology under the first bidding window
___________________________
Source: DoE
The Cogen IPP Procurement Programme has two common characteristics across all the technologies. First, the fuel and / or energy source originates from
an underlying industrial process and secondly, the cogeneration facility is coupled to the industrial process of a host plant
9
● Following from accelerating and expanding REIPPP in August 2015, the Minister issued a determination in August 2015
for an additional 6,300MW of capacity allocation for future bid windows under REIPPP
● The additional MW made available by this determination are to be allocated across technologies as follows:
● Onshore wind 3,040MW, solar PV 2,200MW, CSP
● With this determination, the capacity allocation for the procurement of new generation capacity in future bid windows
will almost double from previous determinations which totaled 6,725MW
● The Minister has also issued a separate gas-specific determination stating that new generation capacity for the
procurement of 3,126 MW can come from any gas type or source
● This includes natural gas delivered to the power generation facility by any method (including by pipeline from a natural
gas field or elsewhere or a liquefied natural gas (LNG) based method), coal bed methane, synthesis gas or syngas,
above or underground coal gasification, shale gas and any other gas type as may be considered appropriate
● The Minister has issued an amendment to the existing determination relating to the Medium Term Risk Mitigation
Project IPP Procurement Programme 2012 by including additional capacity allocation for new generation capacity for
the procurement of 1,800 MW to be generated from:
● Waste heat or furnance off gas
● Cogeneration (i.e. the simultaneous generation of electricity and useful thermal energy from a common fuel
source); and
● An energy source which is a co-product, by-product, waste product or residual product of an industrial
process and / or sustainable agricultural or forestry activity
South Africa Renewable Energy IPP Programme Overview
Significant Announcements on SA’s Energy Programmes
In August 2015, the Minister of Energy issued new ministerial determinations for
additional capacity allocation for the country's renewable energy, gas and cogeneration
programmes
New Renewable Energy Determinations
The renewable energy determination provides the desired certainty that there will be a pipeline of renewable energy projects in South Africa’s
procurement of much needed new electricity generation capacity. The determinations on gas and cogeneration projects signal the government’s
commitment to diversify South Africa’s energy mix
___________________________
Source: The Department of Energy
Renewable
Energy
Gas
Cogeneration
10
Appendices
REIPPP Round Winners
List of successful bidders in the REIPPP program
Round 1 Winners Round 2 Winners Round 3 Winners Round 4 Winners
Solar CSP = 2 deals MW
Khi Solar One 50.00
KaXu Solar One 100.00
TOTAL 150.00
Onshore Wind = 8 deals
Red Cap Kouga Wind Farm- Oyster Bay 77.60
Cookhouse Wind Farm 135.00
Dorper Wind Farm 97.00
Noblesfontein 72.80
Dassieklip Wind Energy Facility 26.20
MetroWind Van Stadens Wind Farm 26.20
Jeffreys Bay 133.90
Hopefield Wind Farm 65.40
TOTAL 634.10
PV = 18 deals MW
Slim Sun Swartland Solar Park 5.00
RustMo1 Solar Farm 6.80
Mulilo Renewable Energy Solar PV De Aar 9.70
Aries Solar 9.70
Konkoosies Solar 9.70
Greefspan PV Power Plant 10.00
Mulilo Rnewable Energy Solar PV Prieska 19.90
Herbert PV Power Plant 19.90
SoutPan Solar Park 28.00
Witkop Solar Park 30.00
Touwsriver Project 36.00
De Aar Solar PV 48.30
South African Mainstream Renewable
Power Droogfontein
48.30
Letsatsi Power Company 64.00
Lesedi Power Company 64.00
Kalkbult 72.50
Solar Capital De Aar (Pty) Ltd 75.00
Kathu Solar Energy Facility 75.00
TOTAL 631.80
TOTAL MW’s ALLOCATED in BD1 1415.90
CSP = 1 deal MW
Bokpoort CSP Project 50.00
TOTAL 50.00
Wind = 7 deals MW
Amakhala Emoyeni 133.70
Gouda Wind Project 135.50
Tsitsikamma Community Wind Farm 94.80
West Coast 1 90.82
Grassridge 59.80
Waainek 23.28
Chaba 21.00
TOTAL 558.90
PV = 9 deals MW
Jasper Power Company 75.00
Solar De Aar 3 Proprietary Limited 75.00
Sishen Solar Facility 74.00
Dreunberg 69.60
Boshoff Solar Park 60.00
Linde 36.80
Aurora-Rietvlei Solar Power 9.00
Upington Solar PV plant 8.90
Vredendal Solar Park 8.82
TOTAL 417.12
Small Hydro = 2 deals MW
Stortemelk Hydro (Pty) Ltd 4.40
Neusberg Hydro Electric Project 10.00
TOTAL 14.40
TOTAL MW’s ALLOCATED in BD2 1040.42
CSP = 2 deals MW
Xina CSP South Africa 100.00
Karoshoek Consortium 100.00
TOTAL 200.00
Wind = 7 deals MW
Red Cap- Gibson Bay 110.00
Nojoli Wind Farm 87.00
Longyuan Mulilo De Aar 2 North Wind
Energy Facility
139.00
Longyuan Mulilo De Aar Maanhaarberg
Wind Energy Facility
96.00
Khobab Wind Farm 138.00
Noupoort Mainstream Wind 79.00
Loeriesfontein 2 Wind Farm 138.00
TOTAL 787.00
PV = 6 deals MW
Adams Solar PV 2 75.00
Tom Burke Solar Park 60.00
Electra Capital 75.00
Pulida Solar Park 75.00
Muililo Sonnedix Prieska PV 75.00
Mulilo Prieska PV 75.00
TOTAL 435.00
Landfill Gas = 1 deal MW
Johannesburg Landfill Gas to Electricity 18.00
Biomass = 1 deal MW
Mkuze 16.00
TOTAL MW’s ALLOCATED in BD3 1456.00
On-shore Wind = 5 deals MW
Roggeveld Wind Farm 140.00
The Karusa Wind Farm 140.00
The Nxuba Wind Farm 139.00
Golden Valley Wind 117.00
Oyster Bay Wind Farm 140.00
TOTAL 676.00
Solar PV = 6 deals MW
Sirius Solar PV Project One 75.00
Drrogfontein 2 Solar 75.00
Dyason’s Klip 1 75.00
Dyason’s Klip 2 75.00
Konkoonsies II Solar Facility 75.00
Aggeneys Solar Project 40.00
TOTAL 415.00
Hydro= 1 deal MW
Krusivallei Hydro 5
TOTAL 5.00
Biomass = 1 deal MW
Ngodwana Energy Project 25.00
TOTAL 25.00
TOTAL MW’s ALLOCATED in BD4 1121.00
Indicates Barclays deals
Indicates Barclays BEE Funding
11
REIPPP Overview (Cont)
List of successful bidders in the REIPPP program
Round 4.5 Winners
Onshore Wind = 7 deals MW
Soetwater Wind Farm 139
Kangnas 137
Perdekraal East 108
Excelsior Wind Energy Facility 32
Wesley-Ciskei 33
Copperton Windfarm 102
Garob Wind Farm 136
TOTAL 687
Solar PV = 6 deals MW
Solar Capital Orange 75
De Wildt 50
Bokamoso 68
Zeerust 75
Greefspan PV Power Plant No 2 Solar Park 55
Waterloo Solar Park 75
TOTAL 398
TOTAL MW’s ALLOCATED in 4.5 1,085.00
Indicates projects that Barclays participated in
12
17
Contact Details
Barclays Africa – Contact Details
Bhavtik C. Vallabhjee
Barclays Africa – Corporate & Investment Banking
Director – Power, Utilities & Infrastructure
T: +27 11 772 7422
M: +27 76 258 3301
E: Bhavtik.Vallabhjee@Barclays.com
Physical Address: 15 Alice Lane, Sandton, South Africa

More Related Content

What's hot

Affordable 24x7 Power To All @2019 - Key Strategies for Achieving Programme O...
Affordable 24x7 Power To All @2019 - Key Strategies for Achieving Programme O...Affordable 24x7 Power To All @2019 - Key Strategies for Achieving Programme O...
Affordable 24x7 Power To All @2019 - Key Strategies for Achieving Programme O...Resurgent India
 
Development of 2050’s national long-term energy plans for carbon neutrality t...
Development of 2050’s national long-term energy plans for carbon neutrality t...Development of 2050’s national long-term energy plans for carbon neutrality t...
Development of 2050’s national long-term energy plans for carbon neutrality t...IEA-ETSAP
 
Planning a reliable power system with a high share of renewables in France by...
Planning a reliable power system with a high share of renewables in France by...Planning a reliable power system with a high share of renewables in France by...
Planning a reliable power system with a high share of renewables in France by...IEA-ETSAP
 
Hydrogen modelling in TIMES – a summary of the inputs, outputs, and best prac...
Hydrogen modelling in TIMES – a summary of the inputs, outputs, and best prac...Hydrogen modelling in TIMES – a summary of the inputs, outputs, and best prac...
Hydrogen modelling in TIMES – a summary of the inputs, outputs, and best prac...IEA-ETSAP
 
"EU and MENA: Market Potentials and Opportunities for Synergy" Presentation
"EU and MENA: Market Potentials and Opportunities for Synergy" Presentation"EU and MENA: Market Potentials and Opportunities for Synergy" Presentation
"EU and MENA: Market Potentials and Opportunities for Synergy" PresentationRCREEE
 
Moroccan MINISTRY OF ENERGY, MINES, WATER AND ENVIRONMENT: Maroccan energy co...
Moroccan MINISTRY OF ENERGY, MINES, WATER AND ENVIRONMENT: Maroccan energy co...Moroccan MINISTRY OF ENERGY, MINES, WATER AND ENVIRONMENT: Maroccan energy co...
Moroccan MINISTRY OF ENERGY, MINES, WATER AND ENVIRONMENT: Maroccan energy co...Maghrenov
 
Concentrated Solar Power Storage in South Africa
Concentrated Solar Power Storage in South AfricaConcentrated Solar Power Storage in South Africa
Concentrated Solar Power Storage in South AfricaDavid Williams
 
Power Sector In Bangladesh
Power Sector In BangladeshPower Sector In Bangladesh
Power Sector In BangladeshSayanton Vhaduri
 
Energy efficiency and renewable energy modelling with ETSAP TIAM - challenges...
Energy efficiency and renewable energy modelling with ETSAP TIAM - challenges...Energy efficiency and renewable energy modelling with ETSAP TIAM - challenges...
Energy efficiency and renewable energy modelling with ETSAP TIAM - challenges...IEA-ETSAP
 
Ongoing Macro-Stand Alone and CGE modelling approaches at UCL Energy Institute
Ongoing Macro-Stand Alone and CGE modelling approaches at UCL Energy InstituteOngoing Macro-Stand Alone and CGE modelling approaches at UCL Energy Institute
Ongoing Macro-Stand Alone and CGE modelling approaches at UCL Energy InstituteIEA-ETSAP
 
Incorporating Homeowners’ Preferences for Heating Systems in the UK TIMES wit...
Incorporating Homeowners’ Preferences for Heating Systems in the UK TIMES wit...Incorporating Homeowners’ Preferences for Heating Systems in the UK TIMES wit...
Incorporating Homeowners’ Preferences for Heating Systems in the UK TIMES wit...IEA-ETSAP
 
Economy-wide Implications of Policy and Uncertainty in the Power Sector of So...
Economy-wide Implications of Policy and Uncertainty in the Power Sector of So...Economy-wide Implications of Policy and Uncertainty in the Power Sector of So...
Economy-wide Implications of Policy and Uncertainty in the Power Sector of So...IEA-ETSAP
 
Albania toward large and sustainable energy developments by lorenc gordani
Albania toward large and sustainable energy developments by lorenc gordaniAlbania toward large and sustainable energy developments by lorenc gordani
Albania toward large and sustainable energy developments by lorenc gordaniLorenc Gordani
 

What's hot (18)

Affordable 24x7 Power To All @2019 - Key Strategies for Achieving Programme O...
Affordable 24x7 Power To All @2019 - Key Strategies for Achieving Programme O...Affordable 24x7 Power To All @2019 - Key Strategies for Achieving Programme O...
Affordable 24x7 Power To All @2019 - Key Strategies for Achieving Programme O...
 
L010437380
L010437380L010437380
L010437380
 
Proyectos de Energías Renovables en Marruecos
Proyectos de Energías Renovables en MarruecosProyectos de Energías Renovables en Marruecos
Proyectos de Energías Renovables en Marruecos
 
Development of 2050’s national long-term energy plans for carbon neutrality t...
Development of 2050’s national long-term energy plans for carbon neutrality t...Development of 2050’s national long-term energy plans for carbon neutrality t...
Development of 2050’s national long-term energy plans for carbon neutrality t...
 
TNO
TNOTNO
TNO
 
Planning a reliable power system with a high share of renewables in France by...
Planning a reliable power system with a high share of renewables in France by...Planning a reliable power system with a high share of renewables in France by...
Planning a reliable power system with a high share of renewables in France by...
 
Alberto Pototschnig, Director de ACER
Alberto Pototschnig, Director de ACERAlberto Pototschnig, Director de ACER
Alberto Pototschnig, Director de ACER
 
Hydrogen modelling in TIMES – a summary of the inputs, outputs, and best prac...
Hydrogen modelling in TIMES – a summary of the inputs, outputs, and best prac...Hydrogen modelling in TIMES – a summary of the inputs, outputs, and best prac...
Hydrogen modelling in TIMES – a summary of the inputs, outputs, and best prac...
 
"EU and MENA: Market Potentials and Opportunities for Synergy" Presentation
"EU and MENA: Market Potentials and Opportunities for Synergy" Presentation"EU and MENA: Market Potentials and Opportunities for Synergy" Presentation
"EU and MENA: Market Potentials and Opportunities for Synergy" Presentation
 
Moroccan MINISTRY OF ENERGY, MINES, WATER AND ENVIRONMENT: Maroccan energy co...
Moroccan MINISTRY OF ENERGY, MINES, WATER AND ENVIRONMENT: Maroccan energy co...Moroccan MINISTRY OF ENERGY, MINES, WATER AND ENVIRONMENT: Maroccan energy co...
Moroccan MINISTRY OF ENERGY, MINES, WATER AND ENVIRONMENT: Maroccan energy co...
 
Concentrated Solar Power Storage in South Africa
Concentrated Solar Power Storage in South AfricaConcentrated Solar Power Storage in South Africa
Concentrated Solar Power Storage in South Africa
 
Power Sector In Bangladesh
Power Sector In BangladeshPower Sector In Bangladesh
Power Sector In Bangladesh
 
Energy efficiency and renewable energy modelling with ETSAP TIAM - challenges...
Energy efficiency and renewable energy modelling with ETSAP TIAM - challenges...Energy efficiency and renewable energy modelling with ETSAP TIAM - challenges...
Energy efficiency and renewable energy modelling with ETSAP TIAM - challenges...
 
Ongoing Macro-Stand Alone and CGE modelling approaches at UCL Energy Institute
Ongoing Macro-Stand Alone and CGE modelling approaches at UCL Energy InstituteOngoing Macro-Stand Alone and CGE modelling approaches at UCL Energy Institute
Ongoing Macro-Stand Alone and CGE modelling approaches at UCL Energy Institute
 
Bhiwandi electricity distribution
Bhiwandi electricity distributionBhiwandi electricity distribution
Bhiwandi electricity distribution
 
Incorporating Homeowners’ Preferences for Heating Systems in the UK TIMES wit...
Incorporating Homeowners’ Preferences for Heating Systems in the UK TIMES wit...Incorporating Homeowners’ Preferences for Heating Systems in the UK TIMES wit...
Incorporating Homeowners’ Preferences for Heating Systems in the UK TIMES wit...
 
Economy-wide Implications of Policy and Uncertainty in the Power Sector of So...
Economy-wide Implications of Policy and Uncertainty in the Power Sector of So...Economy-wide Implications of Policy and Uncertainty in the Power Sector of So...
Economy-wide Implications of Policy and Uncertainty in the Power Sector of So...
 
Albania toward large and sustainable energy developments by lorenc gordani
Albania toward large and sustainable energy developments by lorenc gordaniAlbania toward large and sustainable energy developments by lorenc gordani
Albania toward large and sustainable energy developments by lorenc gordani
 

Viewers also liked

Reference from Child Abuse Intervention Center Program Manager
Reference from Child Abuse Intervention Center Program ManagerReference from Child Abuse Intervention Center Program Manager
Reference from Child Abuse Intervention Center Program ManagerRebecca Ambrose
 
Presentation1
Presentation1Presentation1
Presentation1atdigital
 
Wanda Batten Resume 2015
Wanda Batten Resume 2015Wanda Batten Resume 2015
Wanda Batten Resume 2015Wanda Batten
 
Question G: IE Business School Application
Question G: IE Business School ApplicationQuestion G: IE Business School Application
Question G: IE Business School ApplicationEnricospada93
 
Columna de opinion de Dip Waldo Fernandez Fortalecer las fuerzas armadas
Columna de opinion de Dip Waldo Fernandez Fortalecer las fuerzas armadasColumna de opinion de Dip Waldo Fernandez Fortalecer las fuerzas armadas
Columna de opinion de Dip Waldo Fernandez Fortalecer las fuerzas armadasPablo Carrillo
 
creatividad aplicada en Internet
creatividad aplicada en Internet creatividad aplicada en Internet
creatividad aplicada en Internet MARIA MEJIAS
 
Busqueda avanzada en google academic y Books
Busqueda avanzada en google academic y BooksBusqueda avanzada en google academic y Books
Busqueda avanzada en google academic y BooksNatalie Nobrega Santos
 
Colegio fiscal andrés f córdova
Colegio fiscal andrés f córdovaColegio fiscal andrés f córdova
Colegio fiscal andrés f córdovachina1912
 
La COP21, debut d'un monde nouveau - 18 février 2016
La COP21, debut d'un monde nouveau - 18 février 2016La COP21, debut d'un monde nouveau - 18 février 2016
La COP21, debut d'un monde nouveau - 18 février 2016Joëlle Leconte
 
EC0412: Gestión de Eficiencia Energética en la Organización, (ICA-Procobre, D...
EC0412: Gestión de Eficiencia Energética en la Organización, (ICA-Procobre, D...EC0412: Gestión de Eficiencia Energética en la Organización, (ICA-Procobre, D...
EC0412: Gestión de Eficiencia Energética en la Organización, (ICA-Procobre, D...Efren Franco
 

Viewers also liked (14)

Reference from Child Abuse Intervention Center Program Manager
Reference from Child Abuse Intervention Center Program ManagerReference from Child Abuse Intervention Center Program Manager
Reference from Child Abuse Intervention Center Program Manager
 
Presentation1
Presentation1Presentation1
Presentation1
 
Ministerio del deporte.
Ministerio del deporte.Ministerio del deporte.
Ministerio del deporte.
 
Wanda Batten Resume 2015
Wanda Batten Resume 2015Wanda Batten Resume 2015
Wanda Batten Resume 2015
 
Noam chomsky-la-manipulacion
Noam chomsky-la-manipulacionNoam chomsky-la-manipulacion
Noam chomsky-la-manipulacion
 
Question G: IE Business School Application
Question G: IE Business School ApplicationQuestion G: IE Business School Application
Question G: IE Business School Application
 
Columna de opinion de Dip Waldo Fernandez Fortalecer las fuerzas armadas
Columna de opinion de Dip Waldo Fernandez Fortalecer las fuerzas armadasColumna de opinion de Dip Waldo Fernandez Fortalecer las fuerzas armadas
Columna de opinion de Dip Waldo Fernandez Fortalecer las fuerzas armadas
 
Rock
RockRock
Rock
 
creatividad aplicada en Internet
creatividad aplicada en Internet creatividad aplicada en Internet
creatividad aplicada en Internet
 
Busqueda avanzada en google academic y Books
Busqueda avanzada en google academic y BooksBusqueda avanzada en google academic y Books
Busqueda avanzada en google academic y Books
 
Colegio fiscal andrés f córdova
Colegio fiscal andrés f córdovaColegio fiscal andrés f córdova
Colegio fiscal andrés f córdova
 
La COP21, debut d'un monde nouveau - 18 février 2016
La COP21, debut d'un monde nouveau - 18 février 2016La COP21, debut d'un monde nouveau - 18 février 2016
La COP21, debut d'un monde nouveau - 18 février 2016
 
EC0412: Gestión de Eficiencia Energética en la Organización, (ICA-Procobre, D...
EC0412: Gestión de Eficiencia Energética en la Organización, (ICA-Procobre, D...EC0412: Gestión de Eficiencia Energética en la Organización, (ICA-Procobre, D...
EC0412: Gestión de Eficiencia Energética en la Organización, (ICA-Procobre, D...
 
MMR[1]
MMR[1]MMR[1]
MMR[1]
 

Similar to Overview of South Africa's Power Sector

Iceland Capstone Project
Iceland Capstone ProjectIceland Capstone Project
Iceland Capstone ProjectDaniel Liu
 
CCXG Oct 2019 Electricity sector opportunities for more ambitious NDCs - Mand...
CCXG Oct 2019 Electricity sector opportunities for more ambitious NDCs - Mand...CCXG Oct 2019 Electricity sector opportunities for more ambitious NDCs - Mand...
CCXG Oct 2019 Electricity sector opportunities for more ambitious NDCs - Mand...OECD Environment
 
Solar thermal Energy in Egypt, Mr Eng. Ehab Ismael
Solar thermal Energy in Egypt, Mr Eng. Ehab IsmaelSolar thermal Energy in Egypt, Mr Eng. Ehab Ismael
Solar thermal Energy in Egypt, Mr Eng. Ehab IsmaelSekem Energy
 
ACCIONA ENERGY IN SOUTH AFRICA: A BUSINESS STRATEGY WITH SOCIAL VALUE
ACCIONA ENERGY IN SOUTH AFRICA: A BUSINESS STRATEGY WITH SOCIAL VALUEACCIONA ENERGY IN SOUTH AFRICA: A BUSINESS STRATEGY WITH SOCIAL VALUE
ACCIONA ENERGY IN SOUTH AFRICA: A BUSINESS STRATEGY WITH SOCIAL VALUEacciona
 
RCREEE-enerMENA_NREA Srategy_ jordan august 2013
RCREEE-enerMENA_NREA Srategy_ jordan august 2013RCREEE-enerMENA_NREA Srategy_ jordan august 2013
RCREEE-enerMENA_NREA Srategy_ jordan august 2013RCREEE
 
Renewable Energy Policy Mechanisms and Investment Opportunities - Mylene Capo...
Renewable Energy Policy Mechanisms and Investment Opportunities - Mylene Capo...Renewable Energy Policy Mechanisms and Investment Opportunities - Mylene Capo...
Renewable Energy Policy Mechanisms and Investment Opportunities - Mylene Capo...OECD Environment
 
Session 2 Dr Ziad Jibril Sabra, Jordan
Session 2 Dr Ziad Jibril Sabra, JordanSession 2 Dr Ziad Jibril Sabra, Jordan
Session 2 Dr Ziad Jibril Sabra, JordanOECDGlobalRelations
 
Scaling up energy efficiency in morocco
Scaling up energy efficiency in moroccoScaling up energy efficiency in morocco
Scaling up energy efficiency in moroccoRCREEE
 
Mpx corp presentation eng
Mpx corp presentation engMpx corp presentation eng
Mpx corp presentation engMPX_RI
 
Eskom's Renewables Strategy
Eskom's Renewables StrategyEskom's Renewables Strategy
Eskom's Renewables Strategysimguybar
 
MPX Corporate Presentation
MPX Corporate PresentationMPX Corporate Presentation
MPX Corporate PresentationMPX_RI
 
Power energy generation report
Power energy generation reportPower energy generation report
Power energy generation reportprianca07
 
Agatha Biomass Power Project Brief
Agatha Biomass Power Project BriefAgatha Biomass Power Project Brief
Agatha Biomass Power Project BriefMamiki Matlawa
 
Energy Malaysia Volume 6 (1)
Energy Malaysia Volume 6 (1)Energy Malaysia Volume 6 (1)
Energy Malaysia Volume 6 (1)Nieza Noordin
 
The potential for wind energy in lebanon
The potential for wind energy in lebanonThe potential for wind energy in lebanon
The potential for wind energy in lebanonRCREEE
 
SMALL HYDROPOWER RELEVANCE FOR BASIC ENERGY NEED IN AFRICA
SMALL HYDROPOWER RELEVANCE FOR BASIC ENERGY NEED IN AFRICASMALL HYDROPOWER RELEVANCE FOR BASIC ENERGY NEED IN AFRICA
SMALL HYDROPOWER RELEVANCE FOR BASIC ENERGY NEED IN AFRICAIAEME Publication
 
CCXG Forum, September 2023, Rachid Ennassiri
CCXG Forum, September 2023, Rachid EnnassiriCCXG Forum, September 2023, Rachid Ennassiri
CCXG Forum, September 2023, Rachid EnnassiriOECD Environment
 
presentation_energy_nama_gambia2.pptx
presentation_energy_nama_gambia2.pptxpresentation_energy_nama_gambia2.pptx
presentation_energy_nama_gambia2.pptxgammawarsama
 

Similar to Overview of South Africa's Power Sector (20)

Iceland Capstone Project
Iceland Capstone ProjectIceland Capstone Project
Iceland Capstone Project
 
CCXG Oct 2019 Electricity sector opportunities for more ambitious NDCs - Mand...
CCXG Oct 2019 Electricity sector opportunities for more ambitious NDCs - Mand...CCXG Oct 2019 Electricity sector opportunities for more ambitious NDCs - Mand...
CCXG Oct 2019 Electricity sector opportunities for more ambitious NDCs - Mand...
 
Solar thermal Energy in Egypt, Mr Eng. Ehab Ismael
Solar thermal Energy in Egypt, Mr Eng. Ehab IsmaelSolar thermal Energy in Egypt, Mr Eng. Ehab Ismael
Solar thermal Energy in Egypt, Mr Eng. Ehab Ismael
 
ACCIONA ENERGY IN SOUTH AFRICA: A BUSINESS STRATEGY WITH SOCIAL VALUE
ACCIONA ENERGY IN SOUTH AFRICA: A BUSINESS STRATEGY WITH SOCIAL VALUEACCIONA ENERGY IN SOUTH AFRICA: A BUSINESS STRATEGY WITH SOCIAL VALUE
ACCIONA ENERGY IN SOUTH AFRICA: A BUSINESS STRATEGY WITH SOCIAL VALUE
 
RCREEE-enerMENA_NREA Srategy_ jordan august 2013
RCREEE-enerMENA_NREA Srategy_ jordan august 2013RCREEE-enerMENA_NREA Srategy_ jordan august 2013
RCREEE-enerMENA_NREA Srategy_ jordan august 2013
 
Renewable Energy Policy Mechanisms and Investment Opportunities - Mylene Capo...
Renewable Energy Policy Mechanisms and Investment Opportunities - Mylene Capo...Renewable Energy Policy Mechanisms and Investment Opportunities - Mylene Capo...
Renewable Energy Policy Mechanisms and Investment Opportunities - Mylene Capo...
 
Session 2 Dr Ziad Jibril Sabra, Jordan
Session 2 Dr Ziad Jibril Sabra, JordanSession 2 Dr Ziad Jibril Sabra, Jordan
Session 2 Dr Ziad Jibril Sabra, Jordan
 
Scaling up energy efficiency in morocco
Scaling up energy efficiency in moroccoScaling up energy efficiency in morocco
Scaling up energy efficiency in morocco
 
Mpx corp presentation eng
Mpx corp presentation engMpx corp presentation eng
Mpx corp presentation eng
 
Eskom's Renewables Strategy
Eskom's Renewables StrategyEskom's Renewables Strategy
Eskom's Renewables Strategy
 
MPX Corporate Presentation
MPX Corporate PresentationMPX Corporate Presentation
MPX Corporate Presentation
 
Power energy generation report
Power energy generation reportPower energy generation report
Power energy generation report
 
Agatha Biomass Power Project Brief
Agatha Biomass Power Project BriefAgatha Biomass Power Project Brief
Agatha Biomass Power Project Brief
 
Energy Malaysia Volume 6 (1)
Energy Malaysia Volume 6 (1)Energy Malaysia Volume 6 (1)
Energy Malaysia Volume 6 (1)
 
The potential for wind energy in lebanon
The potential for wind energy in lebanonThe potential for wind energy in lebanon
The potential for wind energy in lebanon
 
Ch1
Ch1Ch1
Ch1
 
GE Challenge Energive 1st Runner Up 2014
GE Challenge Energive 1st Runner Up 2014GE Challenge Energive 1st Runner Up 2014
GE Challenge Energive 1st Runner Up 2014
 
SMALL HYDROPOWER RELEVANCE FOR BASIC ENERGY NEED IN AFRICA
SMALL HYDROPOWER RELEVANCE FOR BASIC ENERGY NEED IN AFRICASMALL HYDROPOWER RELEVANCE FOR BASIC ENERGY NEED IN AFRICA
SMALL HYDROPOWER RELEVANCE FOR BASIC ENERGY NEED IN AFRICA
 
CCXG Forum, September 2023, Rachid Ennassiri
CCXG Forum, September 2023, Rachid EnnassiriCCXG Forum, September 2023, Rachid Ennassiri
CCXG Forum, September 2023, Rachid Ennassiri
 
presentation_energy_nama_gambia2.pptx
presentation_energy_nama_gambia2.pptxpresentation_energy_nama_gambia2.pptx
presentation_energy_nama_gambia2.pptx
 

More from Leonardo ENERGY

A new generation of instruments and tools to monitor buildings performance
A new generation of instruments and tools to monitor buildings performanceA new generation of instruments and tools to monitor buildings performance
A new generation of instruments and tools to monitor buildings performanceLeonardo ENERGY
 
Addressing the Energy Efficiency First Principle in a National Energy and Cli...
Addressing the Energy Efficiency First Principle in a National Energy and Cli...Addressing the Energy Efficiency First Principle in a National Energy and Cli...
Addressing the Energy Efficiency First Principle in a National Energy and Cli...Leonardo ENERGY
 
Auctions for energy efficiency and the experience of renewables
 Auctions for energy efficiency and the experience of renewables Auctions for energy efficiency and the experience of renewables
Auctions for energy efficiency and the experience of renewablesLeonardo ENERGY
 
Energy efficiency first – retrofitting the building stock final
Energy efficiency first – retrofitting the building stock finalEnergy efficiency first – retrofitting the building stock final
Energy efficiency first – retrofitting the building stock finalLeonardo ENERGY
 
How auction design affects the financing of renewable energy projects
How auction design affects the financing of renewable energy projects How auction design affects the financing of renewable energy projects
How auction design affects the financing of renewable energy projects Leonardo ENERGY
 
Energy Efficiency Funds in Europe (updated)
Energy Efficiency Funds in Europe (updated)Energy Efficiency Funds in Europe (updated)
Energy Efficiency Funds in Europe (updated)Leonardo ENERGY
 
Energy Efficiency Funds in Europe
Energy Efficiency Funds in EuropeEnergy Efficiency Funds in Europe
Energy Efficiency Funds in EuropeLeonardo ENERGY
 
Five actions fit for 55: streamlining energy savings calculations
Five actions fit for 55: streamlining energy savings calculationsFive actions fit for 55: streamlining energy savings calculations
Five actions fit for 55: streamlining energy savings calculationsLeonardo ENERGY
 
Recent energy efficiency trends in the EU
Recent energy efficiency trends in the EURecent energy efficiency trends in the EU
Recent energy efficiency trends in the EULeonardo ENERGY
 
Energy and mobility poverty: Will the Social Climate Fund be enough to delive...
Energy and mobility poverty: Will the Social Climate Fund be enough to delive...Energy and mobility poverty: Will the Social Climate Fund be enough to delive...
Energy and mobility poverty: Will the Social Climate Fund be enough to delive...Leonardo ENERGY
 
Does the EU Emission Trading Scheme ETS Promote Energy Efficiency?
Does the EU Emission Trading Scheme ETS Promote Energy Efficiency?Does the EU Emission Trading Scheme ETS Promote Energy Efficiency?
Does the EU Emission Trading Scheme ETS Promote Energy Efficiency?Leonardo ENERGY
 
Energy efficiency, structural change and energy savings in the manufacturing ...
Energy efficiency, structural change and energy savings in the manufacturing ...Energy efficiency, structural change and energy savings in the manufacturing ...
Energy efficiency, structural change and energy savings in the manufacturing ...Leonardo ENERGY
 
Energy Sufficiency Indicators and Policies (Lea Gynther, Motiva)
Energy Sufficiency Indicators and Policies (Lea Gynther, Motiva)Energy Sufficiency Indicators and Policies (Lea Gynther, Motiva)
Energy Sufficiency Indicators and Policies (Lea Gynther, Motiva)Leonardo ENERGY
 
The Super-efficient Equipment and Appliance Deployment (SEAD) Initiative Prod...
The Super-efficient Equipment and Appliance Deployment (SEAD) Initiative Prod...The Super-efficient Equipment and Appliance Deployment (SEAD) Initiative Prod...
The Super-efficient Equipment and Appliance Deployment (SEAD) Initiative Prod...Leonardo ENERGY
 
Modelling and optimisation of electric motors with hairpin windings
Modelling and optimisation of electric motors with hairpin windingsModelling and optimisation of electric motors with hairpin windings
Modelling and optimisation of electric motors with hairpin windingsLeonardo ENERGY
 
Casting zero porosity rotors
Casting zero porosity rotorsCasting zero porosity rotors
Casting zero porosity rotorsLeonardo ENERGY
 
Direct coil cooling through hollow wire
Direct coil cooling through hollow wireDirect coil cooling through hollow wire
Direct coil cooling through hollow wireLeonardo ENERGY
 
Motor renovation - Potential savings and views from various EU Member States
Motor renovation - Potential savings and views from various EU Member StatesMotor renovation - Potential savings and views from various EU Member States
Motor renovation - Potential savings and views from various EU Member StatesLeonardo ENERGY
 
The need for an updated European Motor Study - key findings from the 2021 US...
The need for  an updated European Motor Study - key findings from the 2021 US...The need for  an updated European Motor Study - key findings from the 2021 US...
The need for an updated European Motor Study - key findings from the 2021 US...Leonardo ENERGY
 
Efficient motor systems for a Net Zero world, by Conrad U. Brunner - Impact E...
Efficient motor systems for a Net Zero world, by Conrad U. Brunner - Impact E...Efficient motor systems for a Net Zero world, by Conrad U. Brunner - Impact E...
Efficient motor systems for a Net Zero world, by Conrad U. Brunner - Impact E...Leonardo ENERGY
 

More from Leonardo ENERGY (20)

A new generation of instruments and tools to monitor buildings performance
A new generation of instruments and tools to monitor buildings performanceA new generation of instruments and tools to monitor buildings performance
A new generation of instruments and tools to monitor buildings performance
 
Addressing the Energy Efficiency First Principle in a National Energy and Cli...
Addressing the Energy Efficiency First Principle in a National Energy and Cli...Addressing the Energy Efficiency First Principle in a National Energy and Cli...
Addressing the Energy Efficiency First Principle in a National Energy and Cli...
 
Auctions for energy efficiency and the experience of renewables
 Auctions for energy efficiency and the experience of renewables Auctions for energy efficiency and the experience of renewables
Auctions for energy efficiency and the experience of renewables
 
Energy efficiency first – retrofitting the building stock final
Energy efficiency first – retrofitting the building stock finalEnergy efficiency first – retrofitting the building stock final
Energy efficiency first – retrofitting the building stock final
 
How auction design affects the financing of renewable energy projects
How auction design affects the financing of renewable energy projects How auction design affects the financing of renewable energy projects
How auction design affects the financing of renewable energy projects
 
Energy Efficiency Funds in Europe (updated)
Energy Efficiency Funds in Europe (updated)Energy Efficiency Funds in Europe (updated)
Energy Efficiency Funds in Europe (updated)
 
Energy Efficiency Funds in Europe
Energy Efficiency Funds in EuropeEnergy Efficiency Funds in Europe
Energy Efficiency Funds in Europe
 
Five actions fit for 55: streamlining energy savings calculations
Five actions fit for 55: streamlining energy savings calculationsFive actions fit for 55: streamlining energy savings calculations
Five actions fit for 55: streamlining energy savings calculations
 
Recent energy efficiency trends in the EU
Recent energy efficiency trends in the EURecent energy efficiency trends in the EU
Recent energy efficiency trends in the EU
 
Energy and mobility poverty: Will the Social Climate Fund be enough to delive...
Energy and mobility poverty: Will the Social Climate Fund be enough to delive...Energy and mobility poverty: Will the Social Climate Fund be enough to delive...
Energy and mobility poverty: Will the Social Climate Fund be enough to delive...
 
Does the EU Emission Trading Scheme ETS Promote Energy Efficiency?
Does the EU Emission Trading Scheme ETS Promote Energy Efficiency?Does the EU Emission Trading Scheme ETS Promote Energy Efficiency?
Does the EU Emission Trading Scheme ETS Promote Energy Efficiency?
 
Energy efficiency, structural change and energy savings in the manufacturing ...
Energy efficiency, structural change and energy savings in the manufacturing ...Energy efficiency, structural change and energy savings in the manufacturing ...
Energy efficiency, structural change and energy savings in the manufacturing ...
 
Energy Sufficiency Indicators and Policies (Lea Gynther, Motiva)
Energy Sufficiency Indicators and Policies (Lea Gynther, Motiva)Energy Sufficiency Indicators and Policies (Lea Gynther, Motiva)
Energy Sufficiency Indicators and Policies (Lea Gynther, Motiva)
 
The Super-efficient Equipment and Appliance Deployment (SEAD) Initiative Prod...
The Super-efficient Equipment and Appliance Deployment (SEAD) Initiative Prod...The Super-efficient Equipment and Appliance Deployment (SEAD) Initiative Prod...
The Super-efficient Equipment and Appliance Deployment (SEAD) Initiative Prod...
 
Modelling and optimisation of electric motors with hairpin windings
Modelling and optimisation of electric motors with hairpin windingsModelling and optimisation of electric motors with hairpin windings
Modelling and optimisation of electric motors with hairpin windings
 
Casting zero porosity rotors
Casting zero porosity rotorsCasting zero porosity rotors
Casting zero porosity rotors
 
Direct coil cooling through hollow wire
Direct coil cooling through hollow wireDirect coil cooling through hollow wire
Direct coil cooling through hollow wire
 
Motor renovation - Potential savings and views from various EU Member States
Motor renovation - Potential savings and views from various EU Member StatesMotor renovation - Potential savings and views from various EU Member States
Motor renovation - Potential savings and views from various EU Member States
 
The need for an updated European Motor Study - key findings from the 2021 US...
The need for  an updated European Motor Study - key findings from the 2021 US...The need for  an updated European Motor Study - key findings from the 2021 US...
The need for an updated European Motor Study - key findings from the 2021 US...
 
Efficient motor systems for a Net Zero world, by Conrad U. Brunner - Impact E...
Efficient motor systems for a Net Zero world, by Conrad U. Brunner - Impact E...Efficient motor systems for a Net Zero world, by Conrad U. Brunner - Impact E...
Efficient motor systems for a Net Zero world, by Conrad U. Brunner - Impact E...
 

Recently uploaded

How AI, OpenAI, and ChatGPT impact business and software.
How AI, OpenAI, and ChatGPT impact business and software.How AI, OpenAI, and ChatGPT impact business and software.
How AI, OpenAI, and ChatGPT impact business and software.Curtis Poe
 
Streamlining Python Development: A Guide to a Modern Project Setup
Streamlining Python Development: A Guide to a Modern Project SetupStreamlining Python Development: A Guide to a Modern Project Setup
Streamlining Python Development: A Guide to a Modern Project SetupFlorian Wilhelm
 
Hyperautomation and AI/ML: A Strategy for Digital Transformation Success.pdf
Hyperautomation and AI/ML: A Strategy for Digital Transformation Success.pdfHyperautomation and AI/ML: A Strategy for Digital Transformation Success.pdf
Hyperautomation and AI/ML: A Strategy for Digital Transformation Success.pdfPrecisely
 
DSPy a system for AI to Write Prompts and Do Fine Tuning
DSPy a system for AI to Write Prompts and Do Fine TuningDSPy a system for AI to Write Prompts and Do Fine Tuning
DSPy a system for AI to Write Prompts and Do Fine TuningLars Bell
 
SIP trunking in Janus @ Kamailio World 2024
SIP trunking in Janus @ Kamailio World 2024SIP trunking in Janus @ Kamailio World 2024
SIP trunking in Janus @ Kamailio World 2024Lorenzo Miniero
 
SAP Build Work Zone - Overview L2-L3.pptx
SAP Build Work Zone - Overview L2-L3.pptxSAP Build Work Zone - Overview L2-L3.pptx
SAP Build Work Zone - Overview L2-L3.pptxNavinnSomaal
 
WordPress Websites for Engineers: Elevate Your Brand
WordPress Websites for Engineers: Elevate Your BrandWordPress Websites for Engineers: Elevate Your Brand
WordPress Websites for Engineers: Elevate Your Brandgvaughan
 
New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024
New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024
New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024BookNet Canada
 
"ML in Production",Oleksandr Bagan
"ML in Production",Oleksandr Bagan"ML in Production",Oleksandr Bagan
"ML in Production",Oleksandr BaganFwdays
 
Unleash Your Potential - Namagunga Girls Coding Club
Unleash Your Potential - Namagunga Girls Coding ClubUnleash Your Potential - Namagunga Girls Coding Club
Unleash Your Potential - Namagunga Girls Coding ClubKalema Edgar
 
The Fit for Passkeys for Employee and Consumer Sign-ins: FIDO Paris Seminar.pptx
The Fit for Passkeys for Employee and Consumer Sign-ins: FIDO Paris Seminar.pptxThe Fit for Passkeys for Employee and Consumer Sign-ins: FIDO Paris Seminar.pptx
The Fit for Passkeys for Employee and Consumer Sign-ins: FIDO Paris Seminar.pptxLoriGlavin3
 
"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek Schlawack
"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek Schlawack"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek Schlawack
"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek SchlawackFwdays
 
DevEX - reference for building teams, processes, and platforms
DevEX - reference for building teams, processes, and platformsDevEX - reference for building teams, processes, and platforms
DevEX - reference for building teams, processes, and platformsSergiu Bodiu
 
Moving Beyond Passwords: FIDO Paris Seminar.pdf
Moving Beyond Passwords: FIDO Paris Seminar.pdfMoving Beyond Passwords: FIDO Paris Seminar.pdf
Moving Beyond Passwords: FIDO Paris Seminar.pdfLoriGlavin3
 
Merck Moving Beyond Passwords: FIDO Paris Seminar.pptx
Merck Moving Beyond Passwords: FIDO Paris Seminar.pptxMerck Moving Beyond Passwords: FIDO Paris Seminar.pptx
Merck Moving Beyond Passwords: FIDO Paris Seminar.pptxLoriGlavin3
 
What's New in Teams Calling, Meetings and Devices March 2024
What's New in Teams Calling, Meetings and Devices March 2024What's New in Teams Calling, Meetings and Devices March 2024
What's New in Teams Calling, Meetings and Devices March 2024Stephanie Beckett
 
Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)
Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)
Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)Mark Simos
 
"Debugging python applications inside k8s environment", Andrii Soldatenko
"Debugging python applications inside k8s environment", Andrii Soldatenko"Debugging python applications inside k8s environment", Andrii Soldatenko
"Debugging python applications inside k8s environment", Andrii SoldatenkoFwdays
 
Gen AI in Business - Global Trends Report 2024.pdf
Gen AI in Business - Global Trends Report 2024.pdfGen AI in Business - Global Trends Report 2024.pdf
Gen AI in Business - Global Trends Report 2024.pdfAddepto
 
Dev Dives: Streamline document processing with UiPath Studio Web
Dev Dives: Streamline document processing with UiPath Studio WebDev Dives: Streamline document processing with UiPath Studio Web
Dev Dives: Streamline document processing with UiPath Studio WebUiPathCommunity
 

Recently uploaded (20)

How AI, OpenAI, and ChatGPT impact business and software.
How AI, OpenAI, and ChatGPT impact business and software.How AI, OpenAI, and ChatGPT impact business and software.
How AI, OpenAI, and ChatGPT impact business and software.
 
Streamlining Python Development: A Guide to a Modern Project Setup
Streamlining Python Development: A Guide to a Modern Project SetupStreamlining Python Development: A Guide to a Modern Project Setup
Streamlining Python Development: A Guide to a Modern Project Setup
 
Hyperautomation and AI/ML: A Strategy for Digital Transformation Success.pdf
Hyperautomation and AI/ML: A Strategy for Digital Transformation Success.pdfHyperautomation and AI/ML: A Strategy for Digital Transformation Success.pdf
Hyperautomation and AI/ML: A Strategy for Digital Transformation Success.pdf
 
DSPy a system for AI to Write Prompts and Do Fine Tuning
DSPy a system for AI to Write Prompts and Do Fine TuningDSPy a system for AI to Write Prompts and Do Fine Tuning
DSPy a system for AI to Write Prompts and Do Fine Tuning
 
SIP trunking in Janus @ Kamailio World 2024
SIP trunking in Janus @ Kamailio World 2024SIP trunking in Janus @ Kamailio World 2024
SIP trunking in Janus @ Kamailio World 2024
 
SAP Build Work Zone - Overview L2-L3.pptx
SAP Build Work Zone - Overview L2-L3.pptxSAP Build Work Zone - Overview L2-L3.pptx
SAP Build Work Zone - Overview L2-L3.pptx
 
WordPress Websites for Engineers: Elevate Your Brand
WordPress Websites for Engineers: Elevate Your BrandWordPress Websites for Engineers: Elevate Your Brand
WordPress Websites for Engineers: Elevate Your Brand
 
New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024
New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024
New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024
 
"ML in Production",Oleksandr Bagan
"ML in Production",Oleksandr Bagan"ML in Production",Oleksandr Bagan
"ML in Production",Oleksandr Bagan
 
Unleash Your Potential - Namagunga Girls Coding Club
Unleash Your Potential - Namagunga Girls Coding ClubUnleash Your Potential - Namagunga Girls Coding Club
Unleash Your Potential - Namagunga Girls Coding Club
 
The Fit for Passkeys for Employee and Consumer Sign-ins: FIDO Paris Seminar.pptx
The Fit for Passkeys for Employee and Consumer Sign-ins: FIDO Paris Seminar.pptxThe Fit for Passkeys for Employee and Consumer Sign-ins: FIDO Paris Seminar.pptx
The Fit for Passkeys for Employee and Consumer Sign-ins: FIDO Paris Seminar.pptx
 
"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek Schlawack
"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek Schlawack"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek Schlawack
"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek Schlawack
 
DevEX - reference for building teams, processes, and platforms
DevEX - reference for building teams, processes, and platformsDevEX - reference for building teams, processes, and platforms
DevEX - reference for building teams, processes, and platforms
 
Moving Beyond Passwords: FIDO Paris Seminar.pdf
Moving Beyond Passwords: FIDO Paris Seminar.pdfMoving Beyond Passwords: FIDO Paris Seminar.pdf
Moving Beyond Passwords: FIDO Paris Seminar.pdf
 
Merck Moving Beyond Passwords: FIDO Paris Seminar.pptx
Merck Moving Beyond Passwords: FIDO Paris Seminar.pptxMerck Moving Beyond Passwords: FIDO Paris Seminar.pptx
Merck Moving Beyond Passwords: FIDO Paris Seminar.pptx
 
What's New in Teams Calling, Meetings and Devices March 2024
What's New in Teams Calling, Meetings and Devices March 2024What's New in Teams Calling, Meetings and Devices March 2024
What's New in Teams Calling, Meetings and Devices March 2024
 
Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)
Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)
Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)
 
"Debugging python applications inside k8s environment", Andrii Soldatenko
"Debugging python applications inside k8s environment", Andrii Soldatenko"Debugging python applications inside k8s environment", Andrii Soldatenko
"Debugging python applications inside k8s environment", Andrii Soldatenko
 
Gen AI in Business - Global Trends Report 2024.pdf
Gen AI in Business - Global Trends Report 2024.pdfGen AI in Business - Global Trends Report 2024.pdf
Gen AI in Business - Global Trends Report 2024.pdf
 
Dev Dives: Streamline document processing with UiPath Studio Web
Dev Dives: Streamline document processing with UiPath Studio WebDev Dives: Streamline document processing with UiPath Studio Web
Dev Dives: Streamline document processing with UiPath Studio Web
 

Overview of South Africa's Power Sector

  • 1. Discussion Materials Overview of the Power Sector in South Africa 22 September 2015
  • 2. Overview of the Power Sector in South Africa
  • 3. 2012A 2017E CAGR12-17 Capacity (MW) 44, 289 57, 462 5.4% Net Capacity Addition (MW) - 13, 173 - Electrification rate 76% - - Capacity by Fuel South African Electricity Market Key Statistics Market Overview Capacity Evolution 44,289 45,561 49,579 52,478 55,462 57,462 0 20,000 40,000 60,000 2012 2013 2014 2015 2016 2017 MW 81% 16% 3% ___________________________ Source: BMI Country Report. http://www.ipp-projects.co.za/ Note: (1 ) IRP 2014 is still in draft form and is yet to be promulgated 91% 5% 4% Governing bodies  The Department of Energy (DOE) and the National Energy Regulator of South Africa (“NERSA”) are responsible for setting energy policies and regulation of the energy sector respectively  They determine critical aspects such as the framework for procurement of new generation capacity and consumer pricing regimes Market  South Africa’s electricity market is dominated by the 100% state –owned utility Eskom which generates 95% of the electricity produced in the country and 45% of electricity produced on the continent  As the only transmission licensee, Eskom is responsible for all transmitted electricity  Distribution is shared between Eskom, municipalities and other licensed distributors Energy Agenda  The DOE’s Integrated Resource Plan (“IRP”) 2010 to 2030 (1) puts a framework in place that sets out the scale and mix of new electricity required over the next two decades  Programmes identified in the IRP include:  The Renewable Energy Independent Power Producer Procurement (REIPPP) Programme which is aimed at procuring 6,925 MW of renewable energy  The base-load programme which is aimed at procuring 7,761 MW of base load capacity comprising 2,500MW from coal , 2,652MW of gas power and 2,609 MW of imported hydro power . The Minister has since released a Ministerial Determination for 3,126MWs of gas-to-power projects.  “The medium term risk mitigation” programme aimed at mitigating against supply-demand shortfalls in the medium term, comprising 800 MW from cogeneration and 474 MW of natural gas  DOE Peaker programme is a long standing DOE initiative that involves purchasing power from independently owned Avon (670 MW) and Dedisa (335 MW) power plants (OCGTs) Natural Resources  South Africa has the world's ninth-largest amount of recoverable coal reserves and holds 95% of Africa's total coal reserves  Positioned as the fifth-largest gold producer and accounts for over 6% of the world’s output  In 2013, accounted for an annual production of c. 5 million ounces  South Africa is also one of the world’s largest producer of platinum  In 2013, provided two thirds of the world’s platinum mining output  South Africa produces about 190,000 barrels of oils each and every day land is looking into more prospects with the opening up of new oil wells to expand the business  Currently importing oil and have not reached a capacity to export any oil From 2014 to 2017  4800 MW of REIPPP projects  + 800 MW cogeneration + 474MW natural gas, medium term risk mitigation programme  +/- 1800 MW of Eskom large coal projects (Medupi and Kusile) Contentional Thermal Renewables (incl. hydro) Non Hydro Renewables 1
  • 4. South African Electricity Market (cont’d) Overview  The generation landscape is gradually shifting from single player dominance to a relatively open/competitive system  Single buyer model – Eskom monopoly  Interface with IPPs through 2 units. (i) Eskom’s grid access unit managing connection to the grid (ii) Single Buyer Office (“SBO”) buying power from IPPs  Eskom distributes close to 60% of electricity sales with municipalities and other licensed distributors distributing the balance of electricity sales Participants  Eskom the 100% state owned utility generates c. 95% of South Africa’s electricity  Eskom operates 27 power stations with a total nominal capacity of 41,995 MW, comprising 35 726 MW of coal fired stations, 1 860 MW of nuclear, 2 409 MW of gas fired, 2 000 MW hydro-and pumped storage as well as a 3 MW wind farm  Transmits, distributes and retails electricity  Length of power lines : 359,337 km  # of customers: 800 Municipalities, 3 000 industrial, 1000 mining, 50 000 commercial, 84 000 agricultural and 5.1million residential  Supply sales (TWh): 217.903 IPPs(1)  The REIPPP programme  Launched in 2011 and has generated a total of 64 renewable energy IPPs across 3 of 5 competitive bidding rounds  The 92 successful projects incorporate more than 100 different shareholder entities  Prominent equity players across the bidding rounds include AIIM, Mainstream, Mulilo and Enel Green Power amongst others  DOE Peaker programme  On June 2013, a consortium led by GDF SUEZ signed PPAs with Eskom for two greenfield open-cycle turbine power plants with a combined capacity of 1 005 MW Municipalities & licensed distributors  Distributes c. 40% of electricity sales to customers. Key Municipalities include:  Buffalo City  City of Cape Town  City of Johannesburg  eThekwini Electricity  Ekurhuleni Metropolitan  City Power Johannesburg  Grid length: undisclosed  Supply sales (TWh): undisclosed  Ownership: 100% state owned Generation Transmission/ Distribution Wholesale / Retail ___________________________ Source: Company data, Press. Note: (1 ) South Africa’s Renewable Energy IPP Procurement Programme: Success Factors and Lessons, World Bank Group 2
  • 5. South African Electricity Market (cont’d) South Africa Transmission Network Regional Interconnection Grid Northern Cape Eastern Cape Limpopo Free State Western Cape North West KwaZulu-Natal Mpumalanga Gauteng Substations Future Substations Current Lines Future 132 220 275 400 765 Lines Currrent 132 220 275 400 533 765 ture 220 275 400 765 Lines Currrent 132 220 275 400 533 765 ___________________________ 1. Eskom website, SAPP website. Comments  The Strategic Grid Plan represents the transmission network infrastructure requirements for a period of 10 years and is updated annually  The purpose is to optimally and reliably transport the power from the source of generation to the location of the load  South Africa’s Eskom forms part of the Southern Africa Power Pool (“SAPP”)  SAPP was formed to provide reliable and economical electricity supply for the consumers of each SAPP member consistent with the reasonable use of natural resources and the effect of the environment  Eskom exports power to SAPPP as a member of Southern Africa Development Community (“SADC”)  EDM of Mozambique, ZESA of Mozambique and Eskom of South Africa have MoUs to develop interconnectors to increase power transfers and stability within the SAPP network  The Interconnector projects will involve the separate development of the following sections of the project  In Zimbabwe  400/330 kV new substation at Triangle  400/330 kV new substation at Orange Grove  Zimbabwe to South Africa  275km 400kV line Triangle-Nzhelele Interconnector (Zimbabwe-RSA)  New Nzhelele substation 400kV line bay  Zimbabwe to Mozambique  185km 400kV line Orange Grove – Inchope Interconnector (Zimbabwe-Mozambique)  Establishment of the new 400/220kV Inchope Substation in Mozambique  360km 400kV Inchope - Matambo line  115km 400kV Matambo – Songo line 3
  • 6. South Africa Renewable Energy IPP Programme Overview
  • 7. REIPPP Overview General REIPPP RequirementsREIPPP Overview IPP PPA National Energy Regulator of South Africa (NERSA) Eskom (State Owned Utility) South Africa Department of Energy (DoE)Implementation Agreement Generation Licence Connection Agreement REIPPP Programme  The South African government’s Integrated Resource Plan (“IRP”) sets an ambitious target to add 50,000 MW of new generation capacity to the South African grid by 2028 with renewable energy technologies accounting for approximately 42 per cent of this target  It is against this background that the South African government, through the Department of Energy (“DoE”), launched the Renewable Energy IPP Procurement Programme in August 2011  Under the programme, the DoE initially mandated the procurement of up to 3,625 MW from IPPs of various renewable energy technologies including : wind, solar photovoltaic, concentrated solar power, biogas, biomass, small hydro and landfill gas. An additional 3,100 MW was subsequently made available for procurement under the REIPP Procurement Programme REIPPP Tender Design  Under the REIPP programme, bids are invited from developers in sequential bidding rounds, or “windows”. To date, there have been four bidding windows, with the fifth expected to take place in early 2016. Potential bidders are required to register basic details of their proposed project(s) approximately two months ahead of the relevant bid window and unsuccessful projects can be bid again in future windows  In each bid window, a maximum number of megawatts is made available for each applicable technology and a price cap is set (although the DoE has now removed the price cap for all the technologies, having concluded that intense competition has driven down prices and rendered a cap redundant) Project Structure  This requires a bidder to provide, among other things, a structural diagram showing its debt and equity participants, contractors and key equipment suppliers Legal Requirements  This requires a bidder to indicate, among other things, its acceptance of the terms of the PPA, IA and the other designated project agreements Land Requirements  This requires a bidder to show, among other things, that it has secured the project site, identified all permits and licences required for the project with respect to land rezoning, subdivision and water use Environmental Requirements  A bidder must provide, among other things, the environmental authorisation and related documents Financial Requirements  This requires a bidder to specify, among other things, its price, identify its method of financing the project and demonstrate that it has made sufficient progress in securing financing for its project and the necessary proof of its ability to raise such financing Technical Requirements  A bidder is required to provide, among other things, information on the technology to be used, resource data, contractor capability and track record and a cost estimate letter for grid connection Economic Development  A bidder must make binding commitments (during both construction and operations phase) with respect to share ownership by black South Africans and local communities, local content, job creation, preferential procurement, management control, socio-economic development and enterprise development Value for Money  Each project must provide net benefit to the South African government and consumer taking into account, without limitation, the price offered, the bidder’s internal rate of return and level of success payments  The bid documents contain detailed and complex requirements. Bid responses must comply with all of the qualification criteria to be compliant  The qualification criteria requires bidders to provide detailed responses as to the extent of their readiness to deliver their projects in key areas such as project structure, compliance with specific legal, land, environmental, financial, technical and economic development requirements. Detail on each of these requirements is shown below:  The commercial structure of the REIPPP is shown below: 4
  • 8. South Africa Power and Energy Sector Overview IPP Procurement Programmes Renewable Energy Program  Total of 7, 025 MWs of renewable energy across five different phases  Technologies include wind, solar pv, solar thermal, biomass, mini-hydro, landfill gas  Program is currently in its fourth phase Baseload IPP Procureme nt Program  Coal - 2,500 MWs which will be divided into two phases to commence in 2015  Import hydro - 2,690 MWs  Gas – 3,126 MWs Medium Term Risk Mitigation Projects  Cogeneration - 800 MWs  Gas OCGT/ (MTRMP) - 474 MWs  The cogeneration programme is expected to commence in Q3 2015 You may be interested in the upcoming 2,500MW coal baseload programme and the 3,126 MW gas baseload programme  A summary of the IPP programmes is shown below: 2,500 2,690 2,652 7,842 Coal Import Hydro Gas Total MW 800 474 1,274MW Cogeneration Gas OCGT Total The Energy Regulatory Framework  South Africa has put into place transformative policies to ensure energy supply security and this is demonstrated in a number of legislative actions including the White Paper on the Renewable Energy Policy of RSA (2003), the National Energy Bill (2008), and the National Energy Act (2008)  The Integrated Resource Plan 2010-2030 (“IRP 2010”) developed by the Department of Energy (“DoE”) is a public policy document that outlines the energy mix contemplated for South Africa until 2030  The DoE is in the process of implementing the following IPP Programmes: Renewable Independent Power Producer Procurement Programme (“REIPPPP”), the Baseload IPP Procurement Programme and the Medium Term Risk Mitigation Programme Successful Renewable Programme to Date Commentary  There is an immediate opportunity to participate in the Coal Baseload Programme  The Coal Baseload Programme Request For Proposals document (“Coal RFP”) was released on 15 December 2014 to potential bidders and bid responses for round 1 of the programme will be due on 8 June 2014  The Coal RFP states that a total of 1,600 MWs will be procured in round 1 of the programme with 1,000 MWs being allocated to projects within South Africa and 600 MWs from outside of South Africa  There is a longer term opportunity to participate in the gas baseload programme and the hydro programme which will be undertaken following the coal base load programme 2,820 3,325 600 280 7,025 Solar PV Wind CSP Other Total MW ___________________________ Source: NIPP website, Department of Energy website  The REIPPP programme has generated 92 new renewable energy IPPs across the four bidding rounds to date totaling R193 billion in investment has been committed for the construction of over 6,200 MWs of capacity in technologies like onshore wind, solar PV and concentrated solar power  The DOE issued a media statement in April 2015 stating the intention to launch an expedited procurement process of 1,800 MWs from all renewable technologies. The RFP was issued in June 2015 Energy Allocation per Determination Energy allocated (Round 1- 4) Remaining Energy (MW) Remaining Energy (%) Wind 3 325 MWs 2 656 MWs 669 MWs 20% Solar PV 2 820 MWs 1 899 MWs 921 MWs 33% CSP 600 MWs 600 MWs 0 MWs 0% Landfill/ Biomass/ Hydro/ Biogas 280 MWs 79 MWs 201 MWs 72% 5
  • 9. REIPPP Overview (Cont) REIPPP Programme to Date REIPPP Competitiveness & Trends(1) Socio Economic Features of REIPPP South African Participation  A bidder must ensure that at least 40 per cent of the beneficial shareholding in the project company is directly or indirectly held by South African citizens Job Creation  Each bidder must make commitments to ensure that a certain percentage of its employees during the construction and operation phase are South African citizens of which a certain percentage must be black South Africans Local Content  This is intended to measure the construction expenditure of a project and to express the South African products and services component as a percentage of the total project cost  Local content minimum threshold requirements have increased and require a minimum SA entity participation of 40%, a BEE contributor status level of 5, indicating the extent of the South African entity participation Local Community Ownership  This requires a bidder to ensure that the project company allocates a certain percentage of its ultimate beneficial shareholding to local communities this requires a bidder to ensure that the project company allocates a certain percentage of its ultimate beneficial shareholding to local communities Socio Economic Development  This requires a bidder to identify socio-economic needs of the surrounding communities where the project site will be located and formulate strategies on how such needs could be met utilising the socio-economic development financial contributions Management Control  Commitments that a certain percentage of the project company’s management will comprise black South Africans Enterprise Development  Commitments to initiatives that will enhance the capacity of emerging businesses owned/controlled by black South Africans Preferential Procurement  Commitments to procure goods and services from businesses owned or controlled by black South Africans  The REIPPP programme has generated 92 new renewable energy IPPs across the four bidding rounds to date  R193 billion in investment has been committed for the construction of over 6,200 MW of capacity in technologies like onshore wind, solar PV and concentrated solar power  The DOE issued a media statement in April 2015 stating the intention to launch an expedited procurement process of 1800MW from all renewable technologies. The RFP has been issued 114.3 275.8 302 - 89.7 164.5 282 140 65.6 88.1 164 0 100 200 300 400 Onshore Wind Solar PV Concentrated Solar Power Biomass REIPPP 1 Average Bid Prices REIPPP 2 Average Bid Prices REIPPP 3 Average Bid Prices Project Evaluation  Project evaluation is based on a weighting of 70:30 ratio of price to economic development criteria Average Tariffs  Increased competition across the bidding rounds have seen average tariffs of IPP preferred bidders drop dramatically  Onshore wind tariffs have dropped close to 43% ,with Solar PV tariffs having dropped 68% and concentrated solar power tariffs having dropped close to 46%  Certain criteria have been designed to advance the South African government’s socio- economic development policy objectives  Most of these criteria have minimum compliance thresholds as well as higher targets which a bidder can commit to if it wishes to enhance the competitiveness of a bid at the evaluation stage. ZAR cents / kWh Technology, MW Round 1 Round 2 Round 3 Round 3.5 Round 4 Round 4.5 MW Capacity remaining Solar PV 631.8 417.12 435 415 687 626.08 Wind 634.10 558.90 787 676 398 664 CSP 150 50 200 200 - - Small hydro - 14.40 - 5 115.6 Landfill Gas - - 18 - 7 Biomass - - 16 25 19 Biogas - - - - 60 Total 1,415.9 1,040.42 1,456 200 1,121 1,085 1,691.68 ___________________________ Source: Company data, http://www.energy.gov.za/IPP/List-of-IPP-Preferred-Bidders-Window-three-04Nov2013.pdf 1. Refers to Round 1 to 3. 6
  • 10. REIPPP Overview (Cont)  One qualification criteria which has become a key part of the programme is the engineering, procurement and construction (“EPC”) arrangements. A bidder has to provide details of its EPC contractor, including its track record and capability in building the power plant  Although this is not a specific bid compliance requirement, a competitive EPC price is essential for a successful project and a balance needs to be struck between risk transfer to the EPC contractor and price. Lenders will want the project company to be insulated from risk, yet a blanket approach will not be accepted in the market. With experienced and well resourced sponsors in place, there is scope for the project company to take on appropriate risks – but this is all in the context of fixed “upstream” project documents (the PPA and IA) that govern the process and place fixed obligations and timings on the project company.  These documents (and their impact on the EPC and operations and maintenance arrangements) need to be understood, as they establish a framework for the construction and operation of the projects.  The correct flow-through of processes (in particular during commissioning and commercial operation) and project relief (whereby the EPC contractor’s relief under the EPC contract is limited to that which the project company obtains under the project documents) are essential and must be considered pragmatically and commercially.  Other key issues that need to be addressed include:  dealing with delays caused by Eskom (in particular in relation to grid connection);  site risk under the PPA;  site access;  payment structures and security;  how issues particular to the local construction market can impact on construction and operation;  exchange rate risk;  economic development obligations; and  access to the transmission or distribution system.  With continued pressure on tariff pricing there may be a move towards split contract structures (where the project company employs an equipment supplier and a separate balance of plant contractor – and manages the interface between the two). The Role of EPC & Bidding Considerations Challenges and Lessons Learned Simplified Bidding Requireme nts  The cost of bidding has been high due to the detailed and complex nature of the bidding requirements. The DoE has sought to simplify bidding requirements (and therefore lower bidding costs) by making the following changes to the bid documents for the remaining bidding rounds:  Bidders no longer need to submit shareholders’ agreements in respect of the project company or heads of terms with their contractors and key equipment suppliers at the time of submission. This eliminates advisory and other associated costs incurred through negotiating these documents at the bid stage;  Certain licences and consents are not required until the preferred bidder stage;  The terms on which lenders can issue a letter of support to provide debt financing have been relaxed; and  Bidders only need to provide two hard copies and a soft copy of the bid response as opposed to seven hard copies and seven soft copies as was the case in previous bid windows. Licenses and Consents  Currently, the requisite licences and consents are obtained under different pieces of legislation and from different government departments with different timings and procedures. A single umbrella legal framework for renewable energy procurement with a “one-stop shop” government department for licenses and consents would make the bidding process more efficient and this would also help reduce the costs associated with liaising with different departments Project Site  Securing the project site is a key component of the bidding process. It is therefore important for a bidder to identify the project site and conclude the necessary contracts in sufficient time to ensure that the land arrangements meet land use and acquisition criteria. It is also important for bidders to resolve any land tenure issues such as any third party rights, existing mortgages Grid Connection  Due to financial constraints, there have been concerns regarding Eskom’s ability to build the network infrastructure necessary to connect the large number of successful projects to enable them to achieve commercial operations within the time frames specified in the PPAs. In addition, grid connection costs have now become an issue as the initial cost estimate letters provided by Eskom at bid submission vary substantially from subsequent budget quotes provided to preferred bidders. This has caused a delay in successful third bid window projects reaching financial close 7
  • 11. REIPPPP: Expedited Bid Submission Window The Minister of Energy announced that the Department of Energy would be issuing Request for Proposals (“RFP”) for an expedited renewable energy IPP procurement process, for which 1,800 MW would be allocated MW Allocation and New Price Caps Key Dates Overview 650 520 450 100 40 25 15 0 100 200 300 400 500 600 700 Onshore wind Solar PV CSP Biomass Small hydro Biogas Landfill gas R760/ MWh R870/ MWh 1,370/ MWh 1475/ MWh 1117/ MWh 1475/ MWh 990/ MWh  The Expedited Bid Submission Window (“EW”) was released June 2015 by the Department of Energy (“DoE”)  The EW is open to all projects that are ready for submission within the required timelines, and not only to projects which were unsuccessful in previous bid submission phases  The Minister has allocated 1,800 MW to be allocated during the EW. However, the Department is not obliged to allocate all 1,800 MW during the EW  It is also anticipated that the Minister will issue a Third Determination that will provide for the procurement of a further 6,300 MW to be generated from renewable energy sources  The EW RFP is one of the various procurement processes that the Government will develop to procure this further generation capacity from renewable energy sources  Interested parties have until 6 October to respond to the RFP, the DoE has advised bidders to apply for cost estimate letters from the relevant grid provider as soon as possible The Price caps per Technology have been updated. Notably the Department has elected once more to impose a Price cap on Onshore Wind and Solar PV technologies. Previously, the Price cap was removed for these Technologies 3 Jul ‘15 8 Sept ‘15 8 Oct ‘15 Release of the EW RFP volumes Expedited bid submission date Signing of PPA, IA, DA, Connection Agreements and Financial Close 11 Dec ‘15 31 Jul ‘16 31 Dec ‘19 Bid registration date Announcement of preferred bidders COD proposed by a bidder to fall before D3c 2019 ___________________________ Source: IPPRenewables MW 8
  • 12. Cogeneration IPP Procurement Programme Overview On 4 June 2015, the DoE issued request for bids for the Cogeneration Independent Power Producers Procurement Programme due 10 August 2015 MW Allocation & Price Caps Key Dates  The DoE issued a request for bids for the Cogeneration IPPP. The total MW is 800MW to be allocated for the first bid window across the technologies is as follows:  Waste to Energy (200MW): The primary permitted fuels are waste heat, process furnace off-gas and any other non- renewable energetic waste emitted from an industrial process. However waste or discard coal is not a permitted primary fuel under the programme  Combined Heat and Power (250MW): The primary permitted fuels are coal, waste or discard coal, natural gas and primary liquid fuels  Industrial Biomass (350MW): The primary permitted fuels are sugar bagasse, field trash and other sugar related renewable wastes associated with the host facility process; mill wastes, including chips, saw dust, shavings, soaps, methanol, sludges, bark and black liquor; and agricultural or forestry residue including alien vegetation clearing  It is anticipated that there will be four bidding windows under the Cogen IPP Procurement  The first bidding window bid submission date and announcement date on 10 August 2015 and 17 September 2015 respectively  It is anticipated that the second bid submission date will be 1 September 2015, the third bid submission date will be 27 October 2015 and the fourth bid submission date will be 23 November 2015 Overview 22 Jul ‘15 10 Aug ‘15 17Sept ‘15 Notify DoE on intention to submit a bid response Announcement of preferred bidders 11 Nov ‘16 Bid registration date due Projects bid to reach COD before this date R0.90 /kWh 350 250 200 0 100 200 300 400 Industrial Biomass Combined Heat and Power Waste to Energy MW R1.00/kWh R1.20 /kWh Price caps for each technology under the first bidding window ___________________________ Source: DoE The Cogen IPP Procurement Programme has two common characteristics across all the technologies. First, the fuel and / or energy source originates from an underlying industrial process and secondly, the cogeneration facility is coupled to the industrial process of a host plant 9
  • 13. ● Following from accelerating and expanding REIPPP in August 2015, the Minister issued a determination in August 2015 for an additional 6,300MW of capacity allocation for future bid windows under REIPPP ● The additional MW made available by this determination are to be allocated across technologies as follows: ● Onshore wind 3,040MW, solar PV 2,200MW, CSP ● With this determination, the capacity allocation for the procurement of new generation capacity in future bid windows will almost double from previous determinations which totaled 6,725MW ● The Minister has also issued a separate gas-specific determination stating that new generation capacity for the procurement of 3,126 MW can come from any gas type or source ● This includes natural gas delivered to the power generation facility by any method (including by pipeline from a natural gas field or elsewhere or a liquefied natural gas (LNG) based method), coal bed methane, synthesis gas or syngas, above or underground coal gasification, shale gas and any other gas type as may be considered appropriate ● The Minister has issued an amendment to the existing determination relating to the Medium Term Risk Mitigation Project IPP Procurement Programme 2012 by including additional capacity allocation for new generation capacity for the procurement of 1,800 MW to be generated from: ● Waste heat or furnance off gas ● Cogeneration (i.e. the simultaneous generation of electricity and useful thermal energy from a common fuel source); and ● An energy source which is a co-product, by-product, waste product or residual product of an industrial process and / or sustainable agricultural or forestry activity South Africa Renewable Energy IPP Programme Overview Significant Announcements on SA’s Energy Programmes In August 2015, the Minister of Energy issued new ministerial determinations for additional capacity allocation for the country's renewable energy, gas and cogeneration programmes New Renewable Energy Determinations The renewable energy determination provides the desired certainty that there will be a pipeline of renewable energy projects in South Africa’s procurement of much needed new electricity generation capacity. The determinations on gas and cogeneration projects signal the government’s commitment to diversify South Africa’s energy mix ___________________________ Source: The Department of Energy Renewable Energy Gas Cogeneration 10
  • 15. REIPPP Round Winners List of successful bidders in the REIPPP program Round 1 Winners Round 2 Winners Round 3 Winners Round 4 Winners Solar CSP = 2 deals MW Khi Solar One 50.00 KaXu Solar One 100.00 TOTAL 150.00 Onshore Wind = 8 deals Red Cap Kouga Wind Farm- Oyster Bay 77.60 Cookhouse Wind Farm 135.00 Dorper Wind Farm 97.00 Noblesfontein 72.80 Dassieklip Wind Energy Facility 26.20 MetroWind Van Stadens Wind Farm 26.20 Jeffreys Bay 133.90 Hopefield Wind Farm 65.40 TOTAL 634.10 PV = 18 deals MW Slim Sun Swartland Solar Park 5.00 RustMo1 Solar Farm 6.80 Mulilo Renewable Energy Solar PV De Aar 9.70 Aries Solar 9.70 Konkoosies Solar 9.70 Greefspan PV Power Plant 10.00 Mulilo Rnewable Energy Solar PV Prieska 19.90 Herbert PV Power Plant 19.90 SoutPan Solar Park 28.00 Witkop Solar Park 30.00 Touwsriver Project 36.00 De Aar Solar PV 48.30 South African Mainstream Renewable Power Droogfontein 48.30 Letsatsi Power Company 64.00 Lesedi Power Company 64.00 Kalkbult 72.50 Solar Capital De Aar (Pty) Ltd 75.00 Kathu Solar Energy Facility 75.00 TOTAL 631.80 TOTAL MW’s ALLOCATED in BD1 1415.90 CSP = 1 deal MW Bokpoort CSP Project 50.00 TOTAL 50.00 Wind = 7 deals MW Amakhala Emoyeni 133.70 Gouda Wind Project 135.50 Tsitsikamma Community Wind Farm 94.80 West Coast 1 90.82 Grassridge 59.80 Waainek 23.28 Chaba 21.00 TOTAL 558.90 PV = 9 deals MW Jasper Power Company 75.00 Solar De Aar 3 Proprietary Limited 75.00 Sishen Solar Facility 74.00 Dreunberg 69.60 Boshoff Solar Park 60.00 Linde 36.80 Aurora-Rietvlei Solar Power 9.00 Upington Solar PV plant 8.90 Vredendal Solar Park 8.82 TOTAL 417.12 Small Hydro = 2 deals MW Stortemelk Hydro (Pty) Ltd 4.40 Neusberg Hydro Electric Project 10.00 TOTAL 14.40 TOTAL MW’s ALLOCATED in BD2 1040.42 CSP = 2 deals MW Xina CSP South Africa 100.00 Karoshoek Consortium 100.00 TOTAL 200.00 Wind = 7 deals MW Red Cap- Gibson Bay 110.00 Nojoli Wind Farm 87.00 Longyuan Mulilo De Aar 2 North Wind Energy Facility 139.00 Longyuan Mulilo De Aar Maanhaarberg Wind Energy Facility 96.00 Khobab Wind Farm 138.00 Noupoort Mainstream Wind 79.00 Loeriesfontein 2 Wind Farm 138.00 TOTAL 787.00 PV = 6 deals MW Adams Solar PV 2 75.00 Tom Burke Solar Park 60.00 Electra Capital 75.00 Pulida Solar Park 75.00 Muililo Sonnedix Prieska PV 75.00 Mulilo Prieska PV 75.00 TOTAL 435.00 Landfill Gas = 1 deal MW Johannesburg Landfill Gas to Electricity 18.00 Biomass = 1 deal MW Mkuze 16.00 TOTAL MW’s ALLOCATED in BD3 1456.00 On-shore Wind = 5 deals MW Roggeveld Wind Farm 140.00 The Karusa Wind Farm 140.00 The Nxuba Wind Farm 139.00 Golden Valley Wind 117.00 Oyster Bay Wind Farm 140.00 TOTAL 676.00 Solar PV = 6 deals MW Sirius Solar PV Project One 75.00 Drrogfontein 2 Solar 75.00 Dyason’s Klip 1 75.00 Dyason’s Klip 2 75.00 Konkoonsies II Solar Facility 75.00 Aggeneys Solar Project 40.00 TOTAL 415.00 Hydro= 1 deal MW Krusivallei Hydro 5 TOTAL 5.00 Biomass = 1 deal MW Ngodwana Energy Project 25.00 TOTAL 25.00 TOTAL MW’s ALLOCATED in BD4 1121.00 Indicates Barclays deals Indicates Barclays BEE Funding 11
  • 16. REIPPP Overview (Cont) List of successful bidders in the REIPPP program Round 4.5 Winners Onshore Wind = 7 deals MW Soetwater Wind Farm 139 Kangnas 137 Perdekraal East 108 Excelsior Wind Energy Facility 32 Wesley-Ciskei 33 Copperton Windfarm 102 Garob Wind Farm 136 TOTAL 687 Solar PV = 6 deals MW Solar Capital Orange 75 De Wildt 50 Bokamoso 68 Zeerust 75 Greefspan PV Power Plant No 2 Solar Park 55 Waterloo Solar Park 75 TOTAL 398 TOTAL MW’s ALLOCATED in 4.5 1,085.00 Indicates projects that Barclays participated in 12
  • 17. 17 Contact Details Barclays Africa – Contact Details Bhavtik C. Vallabhjee Barclays Africa – Corporate & Investment Banking Director – Power, Utilities & Infrastructure T: +27 11 772 7422 M: +27 76 258 3301 E: Bhavtik.Vallabhjee@Barclays.com Physical Address: 15 Alice Lane, Sandton, South Africa