Your SlideShare is downloading. ×
Upcoming SlideShare
Loading in...5
×

Thanks for flagging this SlideShare!

Oops! An error has occurred.

×
Saving this for later? Get the SlideShare app to save on your phone or tablet. Read anywhere, anytime – even offline.
Text the download link to your phone
Standard text messaging rates apply

Set parts supply

258

Published on

Published in: Technology, Business
0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total Views
258
On Slideshare
0
From Embeds
0
Number of Embeds
0
Actions
Shares
0
Downloads
2
Comments
0
Likes
0
Embeds 0
No embeds

Report content
Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
No notes for slide

Transcript

  • 1. The Implementation of Set Parts Supply (SPS) in Malaysian Automotive Industry Suhartini Binti Mohd Jainury P55883
  • 2. Introduction • Toyota Motor Corporation has introduced a new concept of material handling and it is known as Set Parts Supply (SPS). In SPS, the line-side is become wide and clear. The concept is every operator has to concentrate on their task. There is operator which do the parts selection and arrange the parts at the SPS cart (minomi method). The SPS cart is pushed to the line-side, and then the operator at the line-side will pick up the certain part and concentrate to assemble the parts.
  • 3. LHS LHS RHS RHS SPS CART READY TO SUPPLY SPS CART EMPTY 1 2 3 4 SPS – selection & arrange part area
  • 4. Problem Statement • The technology is still new in Japan. There are few research in this area and PROTON try to implement it since 2008 in low volume production at multi-model production with fully automated line (Tanjong Malim plant). But now the technology need to transfer to Medium Vehicle Factory which also produce multi-model but not fully automated line. Its more compact and too many constraint.
  • 5. Objectives 1. To study the implementation of SPS system in Malaysian automotive industry. 2. To find the characteristics of SPS. 3. To compare the result “before and after” the implementation of SPS. 4. To develop SPS using simulation software.
  • 6. Research Questions • How the SPS system is implement in Malaysian automotive industry? • What is the characteristics of SPS? • How is the SPS affect the efficiency? • How is the adaptability of SPS in certain condition?
  • 7. PROGRESS REPORT 1. Find the case study – SPS Door Sub RHS & LHS RR/FR in MVF 2. Objectives – revise again 3. Literature Review – find the appropriate journal regarding plant layout and shop floor using ARENA simulation. 4. Writing the literature review regarding lean supply chain. 5. Design the flow process in ARENA. 6. Data collection for ARENA. 7. Learning the Advance ARENA with Wan Hasrul. completed in progress to be in progress in progress in progress to be
  • 8. PROGRESS REPORT PROJECT SPS DOOR SUB 1. Implementation of SPS for FR & RR RHS Door – completed 2. Implementation of SPS for FR & RR LHS Door – next week 3. Implementation AGV at Door Sub – July 2011 4. Implementation Pick & Supply System – September 2011

×