    1. Grand Army Plaza Southeastern Improvements March 2007
    2. Prospect Heights Park Slope Grand Army Plaza Library, Gardens, Museum Prospect Park
    3. Vanderbilt Ave Plaza Sts Eastern Parkway Union St Prospect Flatbush Ave Park West Park Drives
    4. GAP – DOT History of Improvement ’99/’00 – Major Changes in Signs, Markings, Signals ’02-’04 -- Island at Library enlarged, protected, other signal changes ’04 – Plaza Street Bicycle Lanes ’03-06 – Park Auto Hrs Significantly Reduced ’05 – Approval of Eastern Parkway redesign ’06 – Vanderbilt Avenue traffic calming ’06 – Doubled Crossing Time of Prospect Park West ’07 – …
    5. Bailey Fountain The Oval/Plaza •Built 1932 •Restored for $1.5 million in 2004 •Built 1892 •Restored in 2000 Memorial Arch •Thousands of users each weekend •At Capacity – Seeking Growth Greenmarket
    6. Southestern Area Existing Conditions Large Areas of Roadbed and Marked Islands Traffic Entering Plaza at High Speeds No bicycle connection from Park to Plaza Street Bike Lane Lack of Pedestrian Connections
    7. Existing Conditions
    8. Reclaimed Road Space Three Concrete Raised Pedestrian Islands (5,900 sq. ft.) New Planting Beds (2,300 sq. ft.)
    9. Complete Pedestrian Circulation Network 5 New Crosswalks
    10. Bicycle Connection Bike Path Between Park and Plaza Street Bike Lane
    11. Existing Conditions
    12. Traffic Calming North from Prospect Park reduced from 3 to 2 lanes Westbound Eastern Parkway reduced from 3 to 2 lanes Reduced Roadbed Exiting park: Right-turn only lane for Eastern Parkway and Flatbush Avenue
    13. Artist rendering with built improvements
    14. Weekend Pedestrian Essentially Unused Space Roadspace During Auto-Free PP Hours New Reclaimed Close Unused Road During Ped Space During Weekend Hours Weekend Hours Combined Area Sufficient for Significant Programing Reclaimed as Ped Existing Roadspace Space During Auto During Auto PP Hours Free Hrs
    15. End Presentation

    + streetsblogstreetsblog, 3 years ago

    custom

    1363 views, 0 favs, 2 embeds more stats

    DOT's plan for improvments to the southeastern sect more

    More info about this document

    © All Rights Reserved

    Go to text version

    • Total Views 1363
      • 1072 on SlideShare
      • 291 from embeds
    • Comments 0
    • Favorites 0
    • Downloads 50
    Most viewed embeds
    • 289 views on http://www.streetsblog.org
    • 2 views on http://core-lpco-win.pd.local

    more

    All embeds
    • 289 views on http://www.streetsblog.org
    • 2 views on http://core-lpco-win.pd.local

    less

    Flagged as inappropriate Flag as inappropriate
    Flag as inappropriate

    Select your reason for flagging this presentation as inappropriate. If needed, use the feedback form to let us know more details.

    Cancel
    File a copyright complaint
    Having problems? Go to our helpdesk?

    Categories