Moor Cut Trial Pit
26th November 2013
Proof of survey technique
Moor Cut channel bed, beneath A4/St
Cloud Way – a twin foul main lies
somewhere below….but how deep?
Track way and
safety barriers
set up
Delivering
equipment to site
More equipment
….and more
‘Wise’ heads
ponder the levels
… the ‘big beast’ arrives - a U Mole
(trench-less digger)
Not forgetting
the safety gear
(a lifebouy ...?)
How deep
did you say
the pipes
are….?
Extending the
suction pipework
The ‘big beast’
…sucking up
As ground
water seeps
in … action
pumps!
Are we
there
yet…?
That will be
them ….. 2 off
300mm dia foul
pumped sewer
pipes..!
Separating
water from
reusable
spoil for
infill
• Task Cost £7.9k (plus VAT)

• Contractor McNicholas
• Survey/trial results awaited
• Next step TW review of results

• C...
Upcoming SlideShare
Loading in...5
×

Moor Cut Trial Digging

73

Published on

Published in: Education, Business, Technology
0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total Views
73
On Slideshare
0
From Embeds
0
Number of Embeds
0
Actions
Shares
0
Downloads
0
Comments
0
Likes
0
Embeds 0
No embeds

No notes for slide

Transcript of "Moor Cut Trial Digging"

  1. 1. Moor Cut Trial Pit 26th November 2013 Proof of survey technique
  2. 2. Moor Cut channel bed, beneath A4/St Cloud Way – a twin foul main lies somewhere below….but how deep?
  3. 3. Track way and safety barriers set up
  4. 4. Delivering equipment to site
  5. 5. More equipment
  6. 6. ….and more
  7. 7. ‘Wise’ heads ponder the levels
  8. 8. … the ‘big beast’ arrives - a U Mole (trench-less digger)
  9. 9. Not forgetting the safety gear (a lifebouy ...?)
  10. 10. How deep did you say the pipes are….?
  11. 11. Extending the suction pipework
  12. 12. The ‘big beast’ …sucking up
  13. 13. As ground water seeps in … action pumps!
  14. 14. Are we there yet…?
  15. 15. That will be them ….. 2 off 300mm dia foul pumped sewer pipes..!
  16. 16. Separating water from reusable spoil for infill
  17. 17. • Task Cost £7.9k (plus VAT) • Contractor McNicholas • Survey/trial results awaited • Next step TW review of results • Complete twin main survey if technique accepted by TW