http://canberravsts.org<br />
Scrum with VS ALM<br />
Presenter<br />StephenGodbold<br />Readify Senior Consultant<br />Microsoft VS ALM MVP CSM<br />
 Presentation Backlog<br />As a Scrum team member I want to know how I can most effectively plan and manage my work with V...
Working with Tfs<br />
Process Templates<br />MSF for Agile 5<br />Scrum 1.0<br />Scrum for Team System 3.0<br />
Refactoring<br />Enhancing the internals of an artefact without changing it’s external behaviour<br />
Unit Testing<br />“A unit test is a fast, in-memory, consistent, automated and repeatable test of a functional unit-of-wor...
Build Automation<br />Repeatable, reliable process to producing artefacts<br />
Continuous Integration<br />Continual automated quality assurance <br />
Progress Tracking<br />Sprint Burndown<br />Release Burndown<br />Velocity<br />
INSPECT and adapt<br />
Retrospective<br />Capture details directly in the sprint artefact<br />Move anything that is an impediment to a work item...
Reducing friction<br />
Urban Turtle<br />
Team Spec<br />
Work Item Manager and Dashboard<br />
http://canberravsts.org<br />
Upcoming SlideShare
Loading in...5
×

Scrum with VS ALM

1,654

Published on

A presentation on using Scrum and XP practices with the VS ALM suite. Presented on 13/10/2010 at Canberra VS ALM user group.

Published in: Technology
0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total Views
1,654
On Slideshare
0
From Embeds
0
Number of Embeds
0
Actions
Shares
0
Downloads
23
Comments
0
Likes
0
Embeds 0
No embeds

No notes for slide
  • Web AccessPaid w/ 30 Day Free TrialAgile planningPyxus
  • Word integrationPaid w/ free trialAllows spec capture to work item, and vice versaTeam System solutions
  • Standalone WPF applicationFreeAllows for work item management and status reporting via dashboardingTelerik
  • Scrum with VS ALM

    1. 1. http://canberravsts.org<br />
    2. 2. Scrum with VS ALM<br />
    3. 3. Presenter<br />StephenGodbold<br />Readify Senior Consultant<br />Microsoft VS ALM MVP CSM<br />
    4. 4. Presentation Backlog<br />As a Scrum team member I want to know how I can most effectively plan and manage my work with VS ALM<br />As a Scrum team member I want to use the tools within the VS ALM suite to help me deliver quality software<br />As a Scrum team member I want to be able to reduce the friction involved when I work with the VS ALM suite and Scrum<br />
    5. 5.
    6. 6. Working with Tfs<br />
    7. 7. Process Templates<br />MSF for Agile 5<br />Scrum 1.0<br />Scrum for Team System 3.0<br />
    8. 8.
    9. 9.
    10. 10.
    11. 11. Refactoring<br />Enhancing the internals of an artefact without changing it’s external behaviour<br />
    12. 12. Unit Testing<br />“A unit test is a fast, in-memory, consistent, automated and repeatable test of a functional unit-of-work in the system.”<br />-Roy Osherove<br />
    13. 13. Build Automation<br />Repeatable, reliable process to producing artefacts<br />
    14. 14. Continuous Integration<br />Continual automated quality assurance <br />
    15. 15. Progress Tracking<br />Sprint Burndown<br />Release Burndown<br />Velocity<br />
    16. 16.
    17. 17.
    18. 18.
    19. 19.
    20. 20. INSPECT and adapt<br />
    21. 21. Retrospective<br />Capture details directly in the sprint artefact<br />Move anything that is an impediment to a work item<br />Track resolution of impediments<br />
    22. 22.
    23. 23. Reducing friction<br />
    24. 24. Urban Turtle<br />
    25. 25. Team Spec<br />
    26. 26. Work Item Manager and Dashboard<br />
    27. 27.
    28. 28.
    29. 29. http://canberravsts.org<br />
    1. A particular slide catching your eye?

      Clipping is a handy way to collect important slides you want to go back to later.

    ×