Royal Haskoning Vietnam Capability Statement

2,456 views
2,342 views

Published on

0 Comments
1 Like
Statistics
Notes
  • Be the first to comment

No Downloads
Views
Total views
2,456
On SlideShare
0
From Embeds
0
Number of Embeds
11
Actions
Shares
0
Downloads
42
Comments
0
Likes
1
Embeds 0
No embeds

No notes for slide

Royal Haskoning Vietnam Capability Statement

  1. 1. Royal Haskoning Vietnam capability statement
  2. 2. ROYAL HASKONING VIETNAM 236/26C Dien Bien Phu St. Ward 17, Binh Thanh Dist. Ho Chi Minh City Vietnam +84 (0)8 3899 25 05 Telephone +85 (0)8 3899 44 69 Fax info@rhvietnam.com E-mail www.rhvietnam.com Internet Document title Capability StatementDocument short tiitle Capability Statement Date 28 July 2011 Project number Reference RHV_28072011
  3. 3. CONTENTS PageROYAL HASKONING 1Royal Haskoning Worldwide Offices 2Our Expertise 3Our Structure 4Royal Haskoning Offices in Asia 5ROYAL HASKONING VIETNAM 6Introduction 6Why us 7Organisation 7What we do 9Code of conduct 10PROJECT REFERENCES 111. Industry & Energy 111.1 Food & Beverage 111.2 Chemical 191.3 Cold Stores & Warehouses 211.4 Production Facilities 221.5 Water/Waste Water Treatment Plants 291.6 Energy 302. Buildings 322.1 Office Buildings & Residentials 322.2 Hotels & Resorts 372.3 Schools 392.4 Hospitals 403. Maritime & Waterways 414. Water 51
  4. 4. Royal Haskoning ROYAL HASKONING Strategy Royal Haskoning has 3,900 professionals We will achieve our objective through a long-term and operates worldwide. Our independent strategy based on four spearheads: Clients First, professional status is supported by our Financial Control, Value Improvement in Business ownership structure. The company is owned by Processes and Learn & Grow. Each year we identify an independent foundation. Our passion sets us new challenges and decide where and how short- apart and is expressed in our proactive approach. term strategic fine tuning is necessary. Standards and Values Organisation We are aware of our corporate social responsibility. We are a network of expertise, offices, partners Our core values and code of conduct are the basis and business contacts. This enables us to provide of everything we do and they ensure mutual personal, effective and local consultancy services trust, effective cooperation and the success of our utilising the full range of experience, knowledge enterprise. and skills we have acquired worldwide. We are one company offering our stakeholders a Mission comprehensive package of services. We devise solutions for problems relating to the sustainable interaction between people and their Positioning environment. We passion on important themes Our customers are ambitious. Ambition always like mobility, transformation of space, climate carries with it an element of risk. As a trusted change, safety and risk, quality of life in the work partner we can reduce and control these risks environment, and aesthetics. This commitment to using the broad spectrum of expertise and society is a source of inspiration. Our sustainable experience we have at our disposal, built up in solutions that are frequently inspired by Cradle to different markets and with different disciplines. Cradle® place us at the heart of the community. This cross fertilisation between disciplines creates value and produces innovation in the work we Vision do and is the basis for the confidence customers We see our future as continuously increasing the have in us. This all means added value for our added value of our services for our clients. We customers. Our one-company concept allows us share ownership of the issues that are important to do this while minimising coordination costs to our clients. and ensures that learning curves are shared within our organisation and with our clients. Objective We want to be among the leaders in our market and achieve continuity through good profitability. As an Employer of Choice we offer our employees more than just a work environment.Capability Statement -1- Jul.2011
  5. 5. Royal Haskoning Worldwide Offices Off ices Project Off icesThe Netherlands 21 0United Kingdom 16 0Ireland 1 0Belgium 2 0France 2 0Russian Federation 2 1Thailand 1 0Indonesia 1 0Vietnam 2 0India 2 0Africa 2 8Middle East 2 4Other Worldwide 3 8Total 57 21Capability Statement -2- Jul.2011
  6. 6. Our ExpertiseUrban areas and Buildings Industry and Energy. Architecture . Energy. Building management . Health, safety and environment. Building services . Logistics and distribution. Structural design . Plants and process installations. Urban development . Utilities and residuesIn our built-up environment, different interests Society is a fragile structure. This means that thehave to be considered and weighed up: economic quality of our everyday surroundings, safety andgrowth, responsible use of space and raw the environment require constant vigilance. Royalmaterials and the best possible accessibility. But Haskoning is fully involved in our society andthe most crucial aspect is the human factor. Royal provides integrated and sustainable solutions.Haskoning experts succeed in reconciling allthese factors.Infrastructure and Ports Water and Environment. Civil engineering structures . Environment. Ports and terminals . Environmental policy and risk management. Road and railways . River and coastal management. Traffic and transport . Spatial development and water management. Urban infrastructure . Water treatmentA good infrastructure and effective main Efficient, responsible and safe use of space andports are preconditions for a sound economy. water makes for a sustainable future. This is whyRoyal Haskoning has broad expertise in Royal Haskoning takes an integrated approachthe development and implementation of to plans and projects in the areas of coastal, riverinfrastructure plans, airports, harbours, roads, and spatial development, water managementrailways and construction work. and water treatment.Capability Statement -3- Jul.2011
  7. 7. BUILDINGSCapability Statement INDUSTRY & ENERGY MARITIME & WATERWAYS WATER-4- CLIENTS The Board of Management PLANNING & TRANSPORT SPECIIAL UNIT MANAGEMENT CONSULTANCY SPECIIAL UNIT Corporate and Support Groups GROUP DEVELOPMENTJul.2011 Our Structure
  8. 8. Royal Haskoning Offices in AsiaCapability Statement -5- Jul.2011
  9. 9. Royal Haskoning VietnamROYAL HASKONING VIETNAMIntroduction Royal Haskoning Vietnam’s philosophy is toRoyal Haskoning began operating in Vietnam in combine high-end corporate services with “hands-the Water sector in 1985 and in the Buildings & on” methodologies. The firm’s “make-it-happen”Industry sector in 1993. Royal Haskoning Vietnam reputation comes from its approach that positions(RHV) was officially founded in 2004 as a 100% Royal Haskoning Vietnam as a key partner with ourforeign invested firm. We provide a full suite of clients in shaping their investments and projectsservices which includes project management; into successful ventures in a way that bridgesarchitectural design and engineering; civil, the economical, financial, cultural and technicalstructural, mechanical, electrical and process gaps between our clients’ interests and the localengineering and most various technical and environment. The firm is dynamically organizedfinancial consultancy services; HSE management; to facilitate projects in an optimum manner withconstruction management and site supervision. a “1-stop” approach. A project team has only oneWe have come through with flying colours in core goal and that is to ensure a successful project fordivisions in Vietnam such as Buildings, Industry our client. All disciplines work together to come to& Energy, Maritime & Waterways and Water. an effective design and project implementation.Today Royal Haskoning Vietnam is recognized as Moreover our teams take on a feeling of “Projectone of the most prominent leading independent Ownership” meaning we treat projects as if theyconsultants in Vietnam with a unique track record are our own resulting in a strong drive for realof successful projects. project optimization and cost savings. That is what makes Royal Haskoning unique.For most of our clients in Vietnam we carry outthe full scope of consultancy services: from Over the past few years, Royal Haskoningconcept design to construction management. Vietnam has worked with both International andIn these projects RHV is responsible for the Vietnamese contractors on many constructiondesign, management and project controls of the projects and in other such matters of assistance asschedule, budget, quality and safety of the works obtaining licenses, surveys and soil investigationsfrom start to finish. and legal tendering in Vietnam. We have developed a policy to actively promote andRecently the demand for consultancy services for employ Vietnamese nationals supplemented byturn-key projects has increased in Vietnam, and foreign consultants for specific expertise whereRoyal Haskoning Vietnam is currently engaged in deemed necessary in projects.multiple large turn-key projects. We are part ofthese teams as the designers and constructionmanagers or advise clients on how to bestapproach turn-key projects in Vietnam.Capability Statement -6- Jul.2011
  10. 10. Why UsWhy us Organization• We have a track record of more than 130 Royal Haskoning Vietnam currently employs oversuccessful projects in Vietnam to date; 170 professionals. Our staff consists of experts in• We are professionals in our field and have project management, architecture, engineeringsignificant experience as consultants, designers of structures, mechanical & electrical systems,and construction/project managers in Vietnam; ports and water resources.• We show absolute commitment from start tofinish and forever after; Our organization is completely tailored towards• We provide added value beyond design and our core business: the execution of integratedengineering only; building and industrial projects from start to• We have wide experience with both multi- finish. Our staff works across their borders ofnational and domestic clients; expertise and works together with different• We get into the details and work closely with engineers and project managers under one roof.all involved parties to ensure successful results inVietnam; We have two permanent offices in Vietnam: in• We operate as much as possible with local Ho Chi Minh City and in Hanoi. The head officestaff, supplemented with international expertise is in Ho Chi Minh City and due to an increasingwhere needed.This makes us able to combine our amount of investment in the Northernknowledge of international construction Vietnam, we have recently converted our officepractices with a strong understanding of local in Hanoi into a full branch office with projectmarket requirements; management, construction management and• Our emphasis is on quality, reliability and long design capabilities.term relationship with our clients based onpartnership and trust;• We are a truly international consultant, fullyowned by Royal Haskoning from the Netherlandsand can rely on a very broad expertbase of 3,900 professionals world-wide in allengineering and consultancy fields.Capability Statement -7- Jul.2011
  11. 11. Our Organisation CLIENTS MARITIME & WATERWAYS INDUSTRY & ENERGY BUILDINGS WATER Corporate and Support Groups The Board of Management Managing Director Director Director Director Director Director Hanoi Buildings Industry & Energy Maritime & Waterways Water Managers Team Leaders Senior Architects/ Engineers Architects/ Engineers DraftmenCapability Statement -8- Jul.2011
  12. 12. What we doWhat we doRoyal Haskoning Vietnam provides services of design, project management and constructionmanagement in the fields of Buildings, Industry & Energy, Maritime & Waterways and Water.Project Management• Feasibility Studies• Site Development Studies• Budget Estimates• Project Planning• Construction Administration• Progress Control & Reporting• Permits & Licenses• Procurement of Specialist Materials• Tendering & Selection of Contractors• Quality AssuranceDesign• Master Planning• Design Development & Conceptual Design• Architectural & Interior Design• Civil & Structural Design• Electrical Design• Mechanical Design• Design of Utility Systems• Design of Effluent & Water Treatment Plants• Tender Documents & Specification• Construction Drawings• Design Appraisal• Due Dilegence• LEEDConstruction Management• Site Organization• Coordination of Contractors• Daily Site Supervision• Quality Control• Cost/Budget Control• Payment documentation• Site Administration• Progress Control• Safety and Security ManagementCapability Statement -9- Jul.2011
  13. 13. Code of ConductOur Responsibilities conflict between private and company business. In addition, we avoid conflicts of interest in ourWe recognise our responsibilities towards our consultancy services for our clients, based on ourclients, our employees, our partners in business, independent position. In doing business, we doour shareholders and to society. To our clients, not accept gifts or hospitality of significant valuewe aim to add value to their business, by focus- in any form, nor do we offer the same.ing our advice not merely on our clients’ needsbut also on our client’s clients needs. To our Our Economic Principlesemployees, we aspire to be employer of choice, We strive for a sound financial performance asby offering interesting and challenging assign- a means for continuity. Profitability is a measurements in a work environment which is good and for the value that we add for our clients. We aimsafe, which encourages talent development and to achieve sustainable profitability by attainingwhich offers competitive terms and conditions and maintaining long-term positions in the topof service. With our partners in business - sup- of our core markets. In striving for profitability,pliers, (sub)contractors, joint venture partners – we support and seek free and fair competitionwe seek mutually beneficial relationships which and we will not prevent others from competingare based on the principles as laid down in this freely with us.code of conduct. To our shareholders, we aim toprotect the value of their investment and pro- Upholding Our Principlesvide an acceptable return. Last but not least, tosociety we aim to conduct our business as a re- We believe that our code of conduct underpinssponsible member of society. And in our advice, the values of our business. We therefore considerwe constantly strive for sustainable solutions, this code of conduct as an essential part of ourfor our clients, our clients’ clients and our society. long-term success as a company. And we recog-We recognise that these responsibilities are in- nise that we are judged by how we act – not byseparable. It is therefore our duty that we best how we state we act. We are therefore respon-assess how to achieve and maintain the right bal- sible for ensuring that we all know this code ofance between these responsibilities in executing conduct, recognise the importance of it, respect itall of our business activities. and adhere to it.Our IntegrityWe insist on a sincere, honest and fair approachin business – and we expect the same from thosewho we do business for and with. As such, wesubscribe the Code of Ethics of the FIDIC (Inter-national Federation of Consulting Engineers). Weobserve the laws and regulations of the countriesin which our employees and our companies oper-ate. All our business transactions must be reflect-ed accurately and fairly in our accounts. We avoidCapability Statement - 10 - Jul.2011
  14. 14. Project ReferencesPROJECT REFERENCES1. Industry & Energy1.1 Food & Beverage Project Name Green Field Factory Location VSIP Bac Ninh, Bac Ninh Province Client PepsiCo Vietnam Period 2010-2012 Scope of work PepsiCo develops to build a green field factory in VSIP, Bac Ninh province, Vietnam located on the land area of approximately 12 ha. Royal Haskoning Vietnam (RHV) is awarded to the project. RHV provides full consultancy services of design, project management and construction management for the following works including architecture, structure and M&E. The structural design includes the supervision of topo & soil investigation. The M&E design includes fire engineering, waste -storm water and electrical engineering with suitable documents for FF/Const licenses. This factory is designed and constructed as sustainable factory which directs to gain a green and friendly environment LEED certificate. The project consists of following main buildings: future extensible process & filling, pack, utilities, warehouse and office. There are 6 filling lines in this phase, which is expanded to 7 lines in the future. Project Name Route 66 Location Amata IZ, DOng Nai Province Client Nestle Vietnam Ltd. Period 2010-2012 Scope of work 25% of all Nestlé worldwide coffee production comes from Vietnam. Nestlé invests to build a second factory in Amata IZ, Dong Nai province, Vietnam. The factory is located on the site area of 10.8 ha and produces the soluble coffee powder. There will be no packing or filling on-site. Royal Haskoning Vietnam (RHV) is awarded to the project. RHV provides full consultancy services of soil investigation, permits, design, project and construction management. Moreover Royal Haskoning provides full consultancy services for Nestlé around the globe, especially in Asia: Thailand, Phillipines & Indonesia.Capability Statement - 11 - Jul.2011
  15. 15. INDUSTRY & ENERGY Project Name Dielac II Infant Powder Milk Plant Location VSIP Binh Duong, Binh Duong Province Client Vinamilk Period 2010-2011 Scope of work Vietnam Milk Joint Stock Company (Vinamilk) is the leading milk manufacturer in Vietnam. Due to the large demand of powder milk, Vinamilk develops one more Dielac II Infant Powder Milk factory with high-end equipment. The factory is built on the total area of 6 ha at VSIP, Binh Duong, Vietnam, which 60% of this area is constructed. The main buildings are a process building of approximately 12,000 m2, a warehouse of 16,000m2 and an office building of 1,000m2. Vinamilk selected Royal Haskoning Vietnam to carry out the design, design management and QS services for this factory. It is the first time Vinamilk and RHV cooperate together. It is both an opportunity and a challenge for RHV to get a long - term business with Vinamilk. Project Name Chocolate Factory Location My Xuan B1 IZ, Ba Ria-Vung Tau Province Client Dobla Period 2009-2011 Scope of work Dobla is a leading producer of chocolate cups and decorations from the Netherlands. Not only does Dobla supply worldwide, but they also manufacture across the borders. Our products are made in the Netherlands, Belgium and the United States. Dobla would like to expand his chocolate products to the Asian market. They develop to build a new chocolate factory in My Xuan A IZ, Ba Ria - Vung Tau province, Vietnam located on the land area of 1.3 ha. Royal Haskoning Vietnam provides full consultancy services of design, project management & construction mangement for architectural, structural and mechanical & electrical works. Project Name New Food Factory Location Cu Chi, Ho Chi Minh City, Vietnam Client Unilever Vietnam Period 2010-2011 Scope of work Unilever started operation in Vietnam in 1995. To meet the market’s need, Unilever Vietnam develop another factory in Cu Chi, Ho Chi Minh City, Vietnam. The factory is located on the land area of 1.3 ha next to the existing factory. It consists of approximately 15,000m2 floor area with 3 floors and 2 mezzanines with the administration office and process area (with equipments/machines) in one factory block. Royal Haskoning Vietnam (RHV) provides full consultancy services of design for architectural, structural and mechanical & electrical works, assistance for tender and project management. Royal Haskoning Vietnam and Unilever Vietnam are partners from 1995 in providing full consultancy services of design, project & construction management for many factories: shampoo, tea, ice-cream, noodle, food....Capability Statement - 12 - Jul.2011
  16. 16. Project Name Sequent Brewery Plant Location Angola Client Krones AG Period 2010-2011 Scope of work In recent years Royal Haskoning, on behalf of Krones AG, has been successfully involved in large projects. Krones, as being one of the leading manufacturers of machinery and production lines in the food and beverage industry, contracted Royal Haskoning as partner in the Sequele-project. This project is located around 35 km outside Luanda, the capital of Angola. On an estate of 62ha, a beverage production plant is foreseen including a can factory, glass factory, supporting facilities, canteen and administration building. Several existing buildings on the premises have to be respected and implemented in the design as much as possible. Total build surface is approx. 100.000m2 excluding roads. Royal Haskoning is contracted to provide project management and total design from conceptual design up to and including tendering documents and execution design in the fields of architecture, structural engineering, building installations and infrastructure. Furthermore some studies where done like soil investigation and topographical survey. All conceptual designs and coordination are executed in the Netherlands, for detailed design a substantial contribution is provided through our overseas offices in Indonesia, Thailand and Vietnam. So far this is the largest project done with overseas offices working to one uniform final product. All engineering was completed in only 14 months. Project Name Sabeco Brewery, Song Lam Location Nghe An Province Client Krones AG, Germany Period 2008-2010 Scope of work A turnkey project for the design, construction and installation works of a complete brewery: the initial capacity of the brewery is 50 million litres per year and this will be expanded in the future to 100 million litres per year. The total site area is approximately 17 hectares and total constructed floor area is over 51,000m2. Royal Haskoning Vietnam (RHV) carried out all design works for the buildings, including the architectural, structural and building services design. Moreover RHV provided the project and construction management services including cost and progress controls and health, safety and environmental supervision. Main buildings include the brew-house, tank room and filling hall. The complete factory is inclusive of power supply, water treatment plant and waste water treatment plant.Capability Statement - 13 - Jul.2011
  17. 17. Project Name Sabeco Brewery, Quang Ngai Location Quang Phu Industrial Zone, Quang Ngai City, Quang Ngai Province Client Krones AG, Germany Period 2007-2010 Scope of work A turnkey project for the design, construction and installation works of a complete brewery: the initial capacity of the brewery is 50 million litres per year and this will be expanded in the future to 100 million litres per year. The total site area is over 14 hectares and total constructed floor area is approximately 50,000m2. Royal Haskoning Vietnam (RHV) carried out all design works for the buildings, including the architectural, structural and building services design. Moreover RHV provided the project and construction management services including cost and progress controls and health, safety and environmental supervision. Main buildings include the brew-house, tank room and filling hall. The complete factory is inclusive of power supply, water treatment plant and waste water treatment plant. Project Name Civil Upgrades of Dutch Lady Facility Location Binh Hoa Commune, Thuan An District, Binh Duong Province Client Royal Friesland Campina ( Formerly Known As Dutch Lady Vietnam) Period 2009 Scope of work Royal FrieslandCampina Vietnam selected Royal Haskoning Vietnam (RHV) for the several upgrades of the existing factory in Binh Duong province. RHV provided design, tendering process, project & construction management for these projects: new milk reception area, new raised slab, modification to utility building, an extension to the existing building. Moreover Royal Haskoning is Royal FrieslandCampina’s repeat partner in the world. Project Name Masan Fishsauce & noodle Factory Location Lot 6, Tan Dong Hiep A Industrial Zone, Binh Duong Province Client Masan Food Corp. Period 2009 Scope of work Masan Food Corp. invested a new factory located on the land area of 10 hectares in Tan Dong Hiep A IZ, Binh Duong province. The factory’s constructed area is around 34,300m2. Royal Haskoning Vietnam (RHV) was selected to the project. RHV provided all consultancy services of architectural design, structural and M & E engineering as well as tendering for this project.Capability Statement - 14 - Jul.2011
  18. 18. Project Name Dutch Lady Dairy Factory Location Chau Son Industrial Zone, Ha Nam Province Client Royal Friesland Campina (Formerly Known As Dutch Lady Vietnam) Period 2006-2008 Scope of work Dutch Lady Vietnam produces milk products for the Vietnamese market. Dutch Lady’s first factory, also designed by Royal Haskoning Vietnam, was built in Binh Duong province in 1996. The factory in Ha Nam is their second factory in Vietnam and has been constructed on a greenfield site. The project included a factory for the production of liquid milk and drinking yoghurt. It also included a separate facility for the production of infant milk products, utility and office building, canteen, water treatment and waste water treatment plant, store buildings, parking areas and roads. As of May 2008 the annual production capacity of the factory is 200 million kg of dairy products. Project Name Saigon Cu Chi Brewery Project, Phase 1 & Phase 2 Location Tay Bac Cu Chi Industrial Zone, Ho Chi Minh City Client Krones AG, Germany Period 2006-2008 Scope of work A turnkey project for the design, construction and installation works of a complete brewery. The initial capacity of the brewery is 100 million litres per year and this was expanded in the future to 200 million litres. Royal Haskoning Vietnam (RHV) carried out all the design works for the buildings, including the architectural, structural and building services design. RHV also provided project & construction management services including cost and progress controls and health, safety and environmental management. The total site area is approximately 50 ha and the total constructed floor area over 30,000m2. Main buildings include the brewhouse, tank room, filling hall and full store. The complete factory includes power supply, water treatment plant and waste water treatment plant. The brewery buildings and materials comply with GMP guidelines and are suitable for food industry use. Phase 2 doubled the capacity of the brewery adding another tank room, full store, bottling hall, NH3 building extension and external works. RHV is very proud that this project received the Vietnamese Construction Quality Gold Cup Award 2010. Project Name Combibloc Project Location Binh Hoa Commune, Thuan An District, Binh Duong Province Client Royal Friesland Campina (Formerly Known Dutch Lady Vietnam) Period 2002 - 2003 Scope of work The redevelopment project comprised a service area and a filling room as a high care area for three combi bloc fillers. The existing corridor and store were modified as a packing area for three downstream lines that can function as accumulator, promotion sticker labeler, straw applicator, shrink wrapper and carton sealer. Royal Haskoning Vietam provided construction design, tender procedure, construction management, site supervision and health, safety and environmental management.Capability Statement - 15 - Jul.2011
  19. 19. Project Name Best Food Factory Location Cu Chi District, Ho Chi Minh City Client Unilever Bestfood Vietnam Period 2002 Scope of work Unilever requested Royal Haskoning Vietnam to provide a design and tender document for alteration works to their tea factory in Cu Chi, Ho Chi Minh City. The works consisted of two different projects carried out at the same time. The first project was a re-fit out and extension of the ice tea production facility and the second project was the incorporation of all the acquired Best food operations from the Best food factory. The design included architectural, structural and mechanical & electrical works. Project Name Vietnam Foremost Dairy Factory, Song Be Location Binh Hoa Commune, Thuan An District, Binh Duong Province Client Royal Friesland Campina (formerly known as Dutch Lady Vietnam) Period 2001 - 2002 Scope of work Three years after the opening of their milk processing plant in Song Be province (Binh Duong province), Vietnam Foremost decided to extend their factory with 3,500 m2 of warehouse. In addition, 1,500m2 of production building was added and various amendments to the existing facility ware carried out. Royal Haskoning Vietnam provided the designs for the building extension and the expansion of the utility systems. Overall project management and construction management was part of the scope of work as well. Project Name Nigeria Brewery Pld. Location Nigeria, Africa Client Heineken Technical Services Period 2000 Scope of work After two successful projects in Vietnam, Royal Haskoning Vietnam was requested by Heineken Technical Services to prepare the detailed design and other tender documents for the extension of two of their breweries in Nigeria. RHV is part of a team of Haskoning offices in the Netherlands, Thailand, Nigeria and Vietnam. This is the perfect example of a multi-national cooperation where the expertise and resources of the different offices were used to the benefit of the project. For example, various building materials were sourced from different parts of the world; i.e. a main part of the structural steel was sourced from Thailand. The scope of work comprised two bottling halls, a full store and a brewhouse including the necessary infrastructural works.Capability Statement - 16 - Jul.2011
  20. 20. Project Name Tiger/Heineken Brewery Plant Location Ho Chi Minh City Client Vietnam Brewery Ltd. Period 1995 - present Scope of work Royal Haskoning Vietnam (RHV) has provided consultancy services for the Heineken / Tiger brewery in Ho Chi Minh City, Vietnam from the start of the first extension until the recently completed forth extension in Ho Chi Minh City. RHV provides the design, project management, construction management and site supervision of all of the brewery projects for Heineken/Tiger in HCMC and Ha Tay. The works comprise extension of production buildings, warehouses, water / waste water treatment plants, storm and process water drainage systems, etc. There is the strong emphasis in brewery projects on the integration of the buildings and facilities with the process equipment. Strong coordination and a very flexible approach to design are required in order to provide such integration within the set time frame. Moreover Royal Haskoning provides consultancy services for Heineken around the globe, in nearly all countries in Asia, Africa, Russia and Europe. Project Name Tiger/Heineken Brewery Plant Location Ha Tay Client Asia Pacif ic Brewery (Hanoi) Ltd. Period 1995 - present Scope of work Besidies providing full consultancy services for Heineken/ TIger brewery plant in Ho Chi Minh City, Royal Haskoning Vietnam (RHV) has provided consultancy services for the Heineken / Tiger brewery in Hatay (near Hanoi) from the start of the first extension until the recently completed extension of phase B1. RHV provides the design, project management, construction management and site supervision of all of the brewery projects for Heineken/Tiger in HCMC and Ha Tay. The works comprise extension of production buildings, warehouses, water / waste water treatment plants, storm and process water drainage systems, etc. There is strong emphasis in brewery projects on the integration of the buildings and facilities with the process equipment. Strong coordination and a very flexible approach to design are required in order to provide such integration within the set time frame. Moreover Royal Haskoning provides consultancy services for Heineken around the globe, in nearly all countries in Asia, Africa, Russia and Europe.Capability Statement - 17 - Jul.2011
  21. 21. Project Name Unilever Noodle Factory Location Binh Chanh, Ho Chi Minh City Client Wall’s Vietnam Co., Ltd. (Unilever) Period 1999 - 2000 Scope of work An existing noodle plant was renovated and the existing utilities were replaced or upgraded to comply with the Unilever standards for food processing. Royal Haskoning Vietnam prepared detailed designs and specifications and took care of the project management and construction supervision. Project Name Vietnam Foremost Chilling Centre Location Binh Hoa Commune, Thuan An District, Binh Duong Province Client Royal Friesland Campina (formerly known as Dutch Lady Vietnam) Period 1996 Scope of work Royal Haskoning Vietnam carried out the design and construction management for a fresh milk receiving, and small scale processing plant. This chilling centre was the first one of several that will be constructed in the future in the agriculture areas of Song Be province (Binh Duong province). Project Name Wall’s Ice Cream Factory, Cu Chi Location Cu Chi District, Ho Chi Minh City Client Wall’s Vietnam Co., Ltd. (Unilever) Period 1996 - 1998 Scope of work Royal Haskoning Vietnam provided design of the first stage of an ice cream factory in Cu Chi, Ho Chi Minh City. The scope of work included a production facility, cold store, waste water treatment plant, offices and amenities. Project Name Distribution Centre for Wall’s Ice Cream Factory Location Phu Nhuan District, Ho Chi Minh City Client Wall’s Vietnam Co., Ltd. Period 1997 Scope of work Royal Haskoning Vietnam provided design, project & construction management for a cold store, office building, workshop and infra-structural works to an ice cream distribution center. The facilities are partly existing buildings on a site in the center of Ho Chi Minh City.Capability Statement - 18 - Jul.2011
  22. 22. 1.2 Chemical Project Name Akzo Nobel Deco Paint Extension Location Amata Industrial Park, Dong Nai Province Client Akzo Nobel Coatings Vietnam Period 2008 - 2011 Scope of work Akzo Nobel intends to extend the factory at Amata site and to adapt some existing structures for the production of solvent based products. Royal Haskoning Vietnam carried out the following services for this project: process design, civil, architectural and mechanical & electrical design, project and construction management and health, safety & environment management. The original factory buildings were also designed by Royal Haskoning Vietnam. Project Name Akzo Nobel Deco Paint Manufacturing Facility Location Amata Industrial Park, Dong Nai Province Client Akzo Nobel Coatings Vietnam Period 2003 - 2004 Scope of work The new facility is located on a land area of 4 hectares at Amata Industrial Park, Dong Nai province, Vietnam. The project is divided into three phases and capacities. After completing all phases the capacity will reach about 20 to 25 million litres annually depending on the product mix. In the first phase of this project, a plant capacity of about 6 million-litre water-borne and 1 million-litre of solvent-borne paint has been planned. The production building includes offices, laboratories and amenities (about 2,200m2). The warehouse of about 2,500 m2 comprises offices with future expansion capabilities. The production equipment and air compressor with dryer, firewater basin includes hydrant systems for the firefighting network. Royal Haskoning Vietnam has a full scope of design capabilities, architectural, structural and mechanical & electrical design as well as relevant process design.Capability Statement - 19 - Jul.2011
  23. 23. Project Name Jotun Paints Manufacturing Facility Extension Location Song Than Industrial Zone, Binh Duong Province Client Jotun Paints Vietnam Ltd. Period 2003 - 2004 Scope of work The facility is located on a land area of 11,970 m2 at the Song Than Industrial Zone, Binh Duong province, Vietnam. The existing factory including main office building, canteen and locker building, production and warehouse building, mainly producing solvent based paints takes up 30% of the site. The new factory expansion was designed to handle solvent based and water based paints including a new production building, new FG warehouse, new drum storage building and utility buildings such as a washing station, toxic store, maintenance store, generator building, air compressor and fire fighting building. Royal Haskoning Vietnam had a full scope of design capabilities: architectural, structural and mechanical & electrical design as well as relevant process design. Project Name ICI Paints Vietnam Location District 9, Ho Chi Minh City Client ICI Paints Vietnam Ltd. Period 2000 Scope of work In an existing paint factory the waterborne and solvent borne section had to be separated and the capacity of the plant needed to be extended. Royal Haskoning Vietnam was awarded the EPCM contract for the entire project, which included building renovation, renovation of the building services, extension of utility systems and relocation and procurement of production facilities.Capability Statement - 20 - Jul.2011
  24. 24. 1.3 Cold Stores & Warehouses Project Name Warehouse & Off ices Location TNT-Vietrans Express Company Ltd. Client 2010 Period TNT-Vietrans Express Company Ltd. developed a warehouse at the TNT Scope of work warehouse near Noi Bai, Hanoi, VIetnam in 2010. The warehouse has a two story building. A ground floor is warehouse facility with a conveyor and some offices with an additional second floor level for the offices. The warehouse ‘s constructed area is around 2,600 m2. Royal Haskoning Vietnam (RHV) are selected to this project. RHV provided design review, suppliers liaison, construction supervision and HSE management. Project Name UTS Saigon Van Location Dong An Industrial Park, Binh Duong Province Client Saigon Van Co., Ltd. Period 2005-2006 Scope of work Royal Haskoning Vietnam completed a new warehouse facility with office and utilities in Dong An Industrial Park. The project included an office building, room for record storage and auxiliary buildings containing canteen, gym, lockers, maintenance room, etc. Royal Haskoning Vietnam provided the following services: preparing project data book, conceptual design, tender design and tender documents, detailed design and construction management. Project Name Concessionaire Cold Stores Location Various places Client Wall’s Vietnam Co., Ltd. (Unilever) Period 1997 Scope of work Royal Haskoning VIetnam completed the conceptual, detailed design of a cold store and engine room. This was a modular design for various locations. The concessionaire cold stores were part of a distribution system of Wall’s products.Capability Statement - 21 - Jul.2011
  25. 25. 1.4 Production Facilities Project Name Upgrade of the Fire Fighting system Location Ho Chi Minh City Client Totalgaz Vietnam Period 2010-2011 Scope of work Totalgaz Vietnam Company Limited awarded the project of upgrade of the fire fighting system at the existing LPG Tank Farm in District 7, Ho Chi Minh City to Royal Haskoning Vietnam (RHV) in the beginning of 2010. The project consists of: • Site survey of the existing fire water system • Collation of design guidelines • Study and concept design of three options for the upgrade of the fire water system, and possibly another alternative Developing the selected option to tender design (civil, mechanical and electrical) • Basis of Design document • Construction cost estimate • Drawings for submission to the fire department Totalgaz Vietnam Company Limited selected RHV for the construction management and site supervision services of the upgrading of fire fighting system, a new pump house, pontoon as well. This work will be carried out in February, 2011. Project Name Holtrade Underf loor Wheellathe Foundation Location Da Nang City, Da Nang Province Client Holtrade GMBH, Germany Period 2009 Scope of work This is a wheellathe workshop which is built for maintenance and repairing of the steel wheels of trains. The awarded contractor constructed a 60m2 underground pit & foundation where the lathe is installed. Holtrade GMBH awarded this project to Royal Haskoning Vietnam (RHV). RHV provided consultancy services of architectural and structural design of the pit & foundation, tender and contract management, project and construction management. Project Name Inspection of Building Location Ho Chi Minh City Client Colgate Palmolive Vietnam Ltd. Period 2009 Scope of work Royal Haskoning Vietnam provided the level survey of the whole building including a settlement assessment, a survey of crack widths and deflection of beams and columns; calculation checks of the existing structure including the calculation of remaining safety factors for the building. Also, a state of the art crack width monitoring system was installed to monitor the building real time. All information was combined in a report including all recommendations.Capability Statement - 22 - Jul.2011
  26. 26. Project Name Puma Location Long Hau Industrial Zone, Can Giuoc District, Long An Province Client Worldcat Period 2008 - 2009 Scope of work Royal Haskoning Vietnam carried out the design, review and construction management services including health, safety and environmental management for the new facility of Puma in Vietnam. After commencement of work on site, Puma requested Royal Haskoning Vietnam to provide the interior design of the office building. Project Name ABB New Production Facility Location Tien Son Industrial Zone, Bac Ninh Province Client ABB Vietnam Ltd. Period 2008 - 2009 Scope of work The global company ABB originates from Europe (Sweden/Switzerland) and is a world market leader in power and automation technologies. The company employs over 115,000 in its worldwide operations. ABB decided to develop a new production facility in Tien Son Industrial Zone, Bac Ninh province, Vietnam for their medium voltage and high voltage products. The facility includes production space, warehouses, office building, utility building and auxiliary services totaling 11,250m2. Royal Haskoning Vietnam carried out conceptual design, detailed and tender design, construction management and project aftercare as well as health, safety and environmental management. RHV was involved in reconstruction works at ABB’s existing Hanoi transformer factory, and we are pleased to have ABB as a repeat client. Project Name Dien Nam- Dien Ngoc Industrial Park Location Quang Nam Province Client Indochina Land Period 2008 Scope of work Indochina Land acquired a 13.74ha greenfield site in Quang Nam province with the intention of developing it as an industrial park consisting of 65 standard factory units. Each unit has a footprint area of 1,000m2 with optional mezzanine space suitable for offices. The basic units can be fitted-out in a number of ways and also combined into larger units, suitable for light industry or warehouse, etc. Royal Haskoning Vietnam provided complete services for the development of the industrial park including a master plan showing road layouts, main and distribution services and a detailed design of the standard units.Capability Statement - 23 - Jul.2011
  27. 27. Project Name Colgate Palmolive New Facility Location My Phuoc Industrial Zone iii, Binh Duong Province Client Colgate Palmolive Vietnam Ltd. Period 2007- 2009 Scope of work Colgate Palmolive building is a state-of-the-art production facility in an industrial zone outside of Ho Chi Minh City. Royal Haskoning Vietnam provided full consultancy and construction management services for the whole project. Colgate Palmolive and Royal Haskoning Vietnam are committed to the environment and are working in a joint effort in this project to deliver a sustainable, green building. This design required the LEED certification by the United States Green Building Coucil (USGBC). Colgate Palmolive (Vietnam) Ltd. has been awarded the Silver LEED certificate for this project. It is a first LEED certified building in Vietnam. Such a LEED certified building will bring an environmental and economic benefit. And it also demonstrates the owner’s and Royal Haskoning’s commitment to environmental stewardship and social responsibility.RHV’s design included a master plan for future developments on the site. Project Name Wassenburg Medical Devices Location Pho Noi A Industrial Zone, Hung Yen Province Client Wassenburg & Co. BV Period 2006-2008 Scope of work Wassenburg invested in a production facility in the North of Vietnam for medical equipment. Wassenburg selected Royal Haskoning Vietnam as their consultant for the complete design and construction management works. The project was completed on budget well within the tight timeframe. The project included training facilities, canteen, offices, warehouse and assembly areas. Planned future extensions including testing facilities were incorporated into the site master plan. Project Name Sprinkler Expansion Project Location Vietnam Singapore Industrial Zone, Binh Duong Province Client Kimberly Clark Vietnam Period 2007 Scope of work Royal Haskoning Vietnam provided the concept design, construction design, tendering and construction management through to completion of a sprinkler system upgrade to comply with NFPA standards. The complex project was designed and carried out in a working factory where coordination and safety were paramount.Capability Statement - 24- Jul.2011
  28. 28. Project Name Aalborg Industries Location Hai Phong City, Hai Phong Province Client Aalborg Industries A/S Period 2005-2006 Scope of work Royal Haskoning Vietnam provided consultancy services for an Aalborg project to build a marine boiler production factory in An Hong Industrial Zone, Hai Phong City, Vietnam. RHV provided Aalborg with the following services: architectural, structural, civil design, and mechanical & electrical design; contract negotiation and / or tender procedure & evaluation; construction management and site supervision. Project Name Kimberly Clark Personal Care Products Plant Location Vietnam - Singapore Industrial Zone, Binh Duong Province Client Kimberly Clark Vietnam Ltd. Period 2004-2005/ 2002 - 2003 Scope of work A personal care products plant of approx. 30,000m2 for local market and export sales which is located on a land area of 50,000m2. The facility operates 3-5 lines together with appropriate warehousing, utility building, offices and external works. The first phase (2002/2003) consisted of the production building, offices and auxiliary buildings. The second phase (2004/2005) was comprised of a second combined production / warehouse building complete with related buildings. Royal Haskoning Vietnam assisted the Client with a full scope of services from concept design, detailed design, tendering to construction management including project controls of the complete facility, including design for all building related services. Project Name Green Cross – New Production Facility Location Vietnam Singapore Industrial Park - Vsip, Binh Duong Province Client Green Cross Inc. Period 2003 - 2005 Scope of work Green Cross is a company from the Philippines producing brands of bleaches and cologne related products. Most products are alcohol based and this requires careful design of the installations. Royal Haskoning Vietnam took care of the complete plant design, including all process equipment for the manufacturing of Green Cross products.Capability Statement - 25 - Jul.2011
  29. 29. Project Name East West Seed Location Cu Chi District, Ho Chi Minh City Client East West Seed Vietnam Ltd. Period 2004-2005 Scope of work A new seed processing facility, including dry store. For this project, Royal Haskoning Vietnam carried out project and construction management (with cost and progress controls) and full design services. The dry store aims at keeping the seeds at very low humidity to prevent them from sprouting. RHV provided full building design with a complete sealed-off structure. Project Name Lever Vietnam Manufacturing Site Location Cu Chi District, Ho Chi Minh City Client Lever Vietnam J.V. Co. Period 2004 Scope of work The Cu Chi manufacturing site project was aimed at realizing new manufacturing facilities for Lever Vietnam. The facilities were constructed at the Cu Chi Site, Lot A2-3, Cu Chi Industrial Zone, Ho Chi Minh City. The site is located on a 6ha piece of land, adjacent to the EPS factory. In the first phase the site was developed to accommodate a liquid plant, which was designed with a total initial output of 26,000 tons of product per annum and provisions for future expansion of the plant. All necessary facilities and utilities required for the operation of the plant were provided in compliance with the local standards, regulations and codes of practice, but according to an international quality level. Royal Haskoning Vietnam carried out the detailed engineering for the whole site developed with appropriated infrastructures, buildings mid structures, facilities and utility systems required for the proper operation of the liquid plant and integration with other sites. Project Name USP Granulation Plant, Ba Ria – Vung Tau Location Ba Ria - Vung Tau Province Client Baconco J.V. Co. Period 2000 - 2001 Scope of work A new USP granulation plant was built in the last bay of the existing full store, with an area of 44m x 44m. The roof of the existing building was raised to accommodate the new production equipment. The floor and foundations of the existing building were modified to receive the new production equipment. Royal Haskoning Vietnam carried out the detailed design, specifications, tendering, installation & construction management.Capability Statement - 26 - Jul.2011
  30. 30. Project Name Philips New Lamp Manufacturing Plant Location Bien Hoa, Dong Nai Province Client Philips Electronics Vietam Ltd. Period 2001 - 2002 Scope of work For this factory, Philips originally intended to carry out the turn-key work. The project was for a new fluorescent lights manufacturing plant of 3,000m2 in a land area of approx. 14,000m2 for local market and export sales. Royal Haskoning Vietnam carried out an independent cost-review and it appeared the project could be reduced by 20% compared to other turn-key offers, by carefully selecting suppliers and revising the design to comply more with local practice. RHV coordinated the soil investigation of the site to determine the most cost-effective foundation. RHV prepared concept and detailed designs including architectural, structural, mechanical & electrical and logistical layouts of the buildings and surroundings. RHV also provided construction management and site supervision to ensure a smooth progress of the construction works and this resulted in an international standard plant. Project Name Lever Shampoo Plant Location District 9, Ho Chi Minh City Client Lever Vietnam J.V. Co. Period 2000 - 2001 Scope of work Royal Haskoning carried out the full scope of design, project and construction management for the Lever shampoo plant. The design included a raw material day store, mixing area, filling/packing area, finished product day store, raw utility area and production offices. Included in the scope were building services such as lighting, small power, telephone, computer network, airconditioning and ventilation, external works, a shampoo mixing plant consisting of mixing tanks, storage tanks, pumps and piping, including a “cleaning-in-place” system. Project Name Net North Detergent Plant Location Van Dien, Ha Noi Client Lever Vietnam J.V. Co. Period 2000 Scope of work At the request of Lever Vietnam, Royal Haskoning Vietnam made the design and implemented the renovation of a third party detergent factory in Hanoi. The scope of work was comprised of renovation of the existing building, modification of buildings to receive new equipment, a new warehouse and 3-story packaging building. Modification of the water plant, a new electrical distribution system, steam line and compressed air system were also part of the scope of work.Capability Statement - 27 - Ju.2011
  31. 31. Project Name Shell Retail Outlets Location Multi places Client Vermeer Contractors Group Period 1998 Scope of work Design of a standard retail outlet for Shell fuel stations was made, adjusted to the Vietnamese conditions. This design was the standard for a large number of outlets to be constructed in Vietnam. Project Name ABB Transformer Factory Location Ha Noi Client ABB Transformers Period 1996 Scope of work The scope of this project was the design for the rehabilitation of a transformer factory. Besides the architectural up-grading of various assembly halls, one of the existing buildings was provided with a 70 ton overhead crane. Project Name Detergent Factory (Renovation) Location Ha Noi Client Lever Haso (Unilever) Period 1995 - 1996 Scope of work Royal Haskoning Vietnam carried out the design and construction management for the renovation of an existing factory to a modern detergent factory (shampoo and bar soap). The works contained various production buildings, offices, social building and infrastructural works.Capability Statement - 28 - Jul.2011
  32. 32. 1.5 Water/Waste Water Treatment Plants Project Name Muharrap Sewage Treatment Plant Location Kingdom of Bahrain Client - Period 2009 Scope of work The Muharraq STP Project comprises the construction of a wastewater treatment plant and related facilities, the construction of a Sewer Trunk Main and the wastewater connection network for connection of 24 existing WWPS to the Sewer Trunk Main. Royal Haskoning Vietnam provided the structural design for this project. Project Name Vinatex Waste Water Treatment Plant Location Hanoi Client Vinatex Period 2003 - 2004 Scope of work The main objective of the project was to treat generated wastewater from three textile companies before it is discharged into rivers to meet the “Vietnam discharge standards for Industrial water”. The treatment plant has a capacity of 10,000m3 wastewater per day. Total construction & equipment cost budget was approximately USD 4.0 millions, in which 35 % was financed by ORET/ MILIEV subsidy. Royal Haskoning Vietnam & Stork Aqua worked as a consortium, in which Royal Haskoning Vietnam was overall responsible for the architectural, structural design, mechanical & electrical works and construction management. Project Name Di an Water Project Location Di An, Binh Duong Province Client Intertec Contracting A/S Period 2001 - 2002 Scope of work Royal Haskoning Vietnam carried out the design review and monitoring on site services for the construction of a water supply plant for the Binh Duong water supply company. The plant included a mixing tank, sedimentation acceleration, rapid sand filter, treated water tank, treated water pumping station, chemical feed building and washing water drainage tank. Project Name Dairy Factory – Thuan An, Binh Duong Location Binh Hoa Commune, Thuan An District, Binh Duong Province Client Royal Friesland Campina (Formerly Known As Dutch Lady Vietnam) Period 2001 - 2002 Scope of work After completion of their factory, Vietnam Foremost Dairy decided to further extend the facilities with a laboratory, a wastewater treatment plant and a yogurt production unit. Royal Haskoning Vietnam provided design, project and construction management and consultancy services for the extension.Capability Statement -29- Jul.2011
  33. 33. 1.6 Energy Project Name The Fourth Power Development Project 3x8 MW, Stelco Location Republic of Maldives Client Semco Maritime A/S Period 2009 Scope of work The project consists of the design and construction of a fourth powerhouse in Male, Republic of Maldives. It is equipped with 2x8MW diesel oil generator sets and designed for 3x8MW power generation. Royal Haskoning worked together in a consortium of an M&E consultant and M.A.N. as engine supplier for development of the preliminary, concept, detailed and for construction architectural- and structural design. Project Name General Electric Turbine Assembly Facility Location Hai Phong Province Client General Electric Period 2008 Scope of work General Electric plans to construct a wind turbine assembly facility in the North of Vietnam. Royal Haskoning Vietnam assisted General Electric with the initial phase of the project by investigating foundation and soil improvement possibilities. Project Name Camau Power Plant Phase I Location Camau Province Client Campanon Saigon Builders Period 2006 Scope of work Camau phase 1 project is part of the Ca Mau gas-power fertilizer complex in the southern-most province of Ca Mau, and was designed to be operated by either gas or fuel oil with a capacity of 750 MW in the first phase. The plant consisted of two gas turbines, two heat recovery steam generators, and one steam turbine. The two gas turbines were expected to generate power by early 2007, the complete power plant was scheduled for commercial operation in December 2007. Royal Haskoning Vietnam performed design work for lot 4, comprising architectural, structural and mechanical & electrical design, for the general site (roads, drains, lighting etc), and for most of the non-technical buildings, including the admin building, switchyard control building, central control building, workshop, warehouse, canteen, etc. Furthermore the design of foundations for various parts of the plant was RHV’s scope of work as well.Capability Statement - 30 - Jul.2010
  34. 34. Project Name Camau Power Plant Phase II Location Camau Province Client Campanon Saigon Builders Period 2006 Scope of work Phase II of the Camau power plant project increased the capacity from 750 MW in the first phase to 1400 MW when phase II was completed. Royal Haskoning Vietnam performed design works for lot 4, comprised of architectural, structural and mechanical & electrical design for the general site (roads, drains, lighting etc), and for most of the non-technical buildings, including the admin building, switchyard control building, central control building, workshop, warehouse, canteen, etc. The design of foundations for various parts of the plant was Royal Haskoning Vietnam’s scope of work as well.Capability Statement - 31 - Jul..2011

×