Purchasing Process Heat Equipment
8 Step Project Timeline

Stelter & Brinck

Since 1956
1. Order Placement
• Order is placed
•Business terms are confirmed
•Process data is finalized
Stelter & Brinck

Since 1956
2. Drawings Submitted
•Drawings and plans are given to customer for
approval

3. Approval
•AutoCad drawings are submitted ...
4. Manufacturing
•Approved designs are then built to meet the
customers standards

Stelter & Brinck

Since 1956
5. In-House Test Firing
• S&B can fire up to 30MM BTU/hr, fuel oil/natural
gas/propane testing
•Ability to mimic overseas ...
6. Electronic Manuals Issued
•Manuals include start-up/shut down procedures and
a troubleshooting guide

7. Shipment
•Equi...
8. Installation and Start-Up
•Stelter & Brinck’s service technicians
are able to install, start-up, and train
machine oper...
Aftermarket
•Field Service- Technicians keep the equipment
operating at peak performance.
•Parts- Stelter & Brinck keep a ...
Thank you!
Stelter & Brinck

Since 1956

Check out S&B’s Blog Post:
http://www.stelterbrinck.com/blog/looking-for-a-proces...
Upcoming SlideShare
Loading in...5
×

Process Heating Project Timeline

68

Published on

Choosing an OEM of process heat equipment can be challenging; we've created an 8 step project timeline, to give potential clients and idea of what it is like to work with Stelter & Brinck.

Published in: Business
0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total Views
68
On Slideshare
0
From Embeds
0
Number of Embeds
0
Actions
Shares
0
Downloads
2
Comments
0
Likes
0
Embeds 0
No embeds

No notes for slide

Transcript of "Process Heating Project Timeline"

  1. 1. Purchasing Process Heat Equipment 8 Step Project Timeline Stelter & Brinck Since 1956
  2. 2. 1. Order Placement • Order is placed •Business terms are confirmed •Process data is finalized Stelter & Brinck Since 1956
  3. 3. 2. Drawings Submitted •Drawings and plans are given to customer for approval 3. Approval •AutoCad drawings are submitted to customer for approval Stelter & Brinck Since 1956
  4. 4. 4. Manufacturing •Approved designs are then built to meet the customers standards Stelter & Brinck Since 1956
  5. 5. 5. In-House Test Firing • S&B can fire up to 30MM BTU/hr, fuel oil/natural gas/propane testing •Ability to mimic overseas power with in house generator •Testing firing includes an 81 point inspection Stelter & Brinck Since 1956
  6. 6. 6. Electronic Manuals Issued •Manuals include start-up/shut down procedures and a troubleshooting guide 7. Shipment •Equipment is delivered on schedule Stelter & Brinck Since 1956
  7. 7. 8. Installation and Start-Up •Stelter & Brinck’s service technicians are able to install, start-up, and train machine operators Stelter & Brinck Since 1956
  8. 8. Aftermarket •Field Service- Technicians keep the equipment operating at peak performance. •Parts- Stelter & Brinck keep a wide variety of spare parts in stock. Stelter & Brinck Since 1956
  9. 9. Thank you! Stelter & Brinck Since 1956 Check out S&B’s Blog Post: http://www.stelterbrinck.com/blog/looking-for-a-process-heat-equipment-vendor/ Website: www.stelterbrinck.com Twitter: @stelterbrinck Phone: 1-513-367-9300
  1. A particular slide catching your eye?

    Clipping is a handy way to collect important slides you want to go back to later.

×