0
No. Marks Description of goods Packing style qnty
Length,
mm
Width,
mm
Height,
mm
Weight of 1
unit, kg
1 T-002 main column...
Drawing of the cargo on barges.
# Vessel's name Port of departure
Date of
departure
Port of Destination
Date of
arriving
1 Fairload Masan, Korea 10.09.201...
# Vessel's name Port of departure
Date of
departure
Port of Destination
Date of
arriving
Comments
1 Fairload Masan, Korea ...
Handling of the barges in Mikhalchikovo, Russia
# Vessel's name Berthed
Discharging
commenced
Discharging
completed
1 DRS ...
S3 e1
S3 e1
S3 e1
S3 e1
S3 e1
S3 e1
S3 e1
S3 e1
S3 e1
S3 e1
S3 e1
S3 e1
S3 e1
S3 e1
S3 e1
S3 e1
S3 e1
S3 e1
S3 e1
S3 e1
S3 e1
S3 e1
Upcoming SlideShare
Loading in...5
×

S3 e1

390

Published on

Published in: Business
0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total Views
390
On Slideshare
0
From Embeds
0
Number of Embeds
3
Actions
Shares
0
Downloads
1
Comments
0
Likes
0
Embeds 0
No embeds

No notes for slide

Transcript of "S3 e1"

  1. 1. No. Marks Description of goods Packing style qnty Length, mm Width, mm Height, mm Weight of 1 unit, kg 1 T-002 main column (top) steel skid 1 25 293 8 624 8 226 117 679 2 T-003 main column (bottom) steel skid 1 25 600 8 101 8 370 202 138 3 T-005 primary absorber steel skid 1 38 131 3 018 3 224 72 431 4 T-008 stripper steel skid 1 36 886 4 124 4 336 129 002 5 T-009 debutanizer steel skid 1 39 878 4 330 4 905 104 868 6 T-010 c3/c4 splitter steel skid 1 3 907 3 522 4 082 87 318 7 T-011 ppf separator column 1st stage steel skid 1 63 661 5 686 5 535 235 855 8 T-012 ppf separation column 2d stage steel skid 1 63 661 5 686 5 810 234 250 Total: 8 1 183 541 Cargo description
  2. 2. Drawing of the cargo on barges.
  3. 3. # Vessel's name Port of departure Date of departure Port of Destination Date of arriving 1 Fairload Masan, Korea 10.09.2013 St.Petersburg, Russia 25.10.2013 2 DRS 1 St.Petersburg, Russia 28.10.2013 Mikhalchikovo, Russia 10.11.2013 3 DRS 3 St.Petersburg, Russia 02.11.2013 Mikhalchikovo, Russia 16.11.2013 The cargo to be delivered within 24 days from the date of first barge arrived in Mikhalchikovo, i.e. by 10.12.2013. Customer declared that he can deliver by himself hole cargo within 12 days and He has much better offer for ocean vessel with much earlier dates of arrival in SPb. Planned schedule of cargo delivery.
  4. 4. # Vessel's name Port of departure Date of departure Port of Destination Date of arriving Comments 1 Fairload Masan, Korea 10.09.2013 St.Petersburg, Russia 06.11.2013 2 DRS 1 St.Petersburg, Russia 09.11.2013 Mikhalchikovo, Russia 21.11.2013 - Arrived in SPb - 28.10.2013 - Berthed - 07.11.2013 - Loading commenced - 07.11.2013 - Loading completed - 09.11.2013 3 DRS 3 St.Petersburg, Russia 11.11.2013 Mikhalchikovo, Russia 23.11.2013 - Arrived in SPb - 08.11.2013 - Berthed - 09.11.2013 - Loading commenced - 10.11.2013 - Loading completed - 11.11.2013 FACTS
  5. 5. Handling of the barges in Mikhalchikovo, Russia # Vessel's name Berthed Discharging commenced Discharging completed 1 DRS 1 23.11.2013 26.11.2013 30.11.2013 2 DRS 3 06.12.2013 08.12.2013 15.12.2013 Cargo was delivered on January’2014
  1. A particular slide catching your eye?

    Clipping is a handy way to collect important slides you want to go back to later.

×