A Slum Redevelopment Project

12,975 views
12,543 views

Published on

I came to know regarding this competition from rediff.com
Salient features of a well-designed inclusive Neighbourhood (Colony) for the urban poor is characterized by a well conceptualized effort at social cohesion:
I. Housing Unit and Layouts of Cluster Housing
II. Neighbourhood Colony Layouts
III. Basic Physical Infrastructure (Water Supply, Sanitation, Drainage, Roads, Street Lighting, Solid
Waste Management, etc.)
IV. Cohesive Social Infrastructure (Community Centre, Informal Sector Market, Livelihood Centre,
etc.)

Published in: Education, Technology, Business
2 Comments
21 Likes
Statistics
Notes
No Downloads
Views
Total views
12,975
On SlideShare
0
From Embeds
0
Number of Embeds
0
Actions
Shares
0
Downloads
0
Comments
2
Likes
21
Embeds 0
No embeds

No notes for slide

A Slum Redevelopment Project

  1. 1. Space, Light and Order......those are things that men need just as much as they need bread and a place to sleep.” Le Corbusier
  2. 2. INTEGRATED HOUSING AND SLUM REDEVELOPMENT PROJECT AT VIRAR,THANE,MAHARASHTRA, INDIA ARCHITECT-SUVARNA LELE
  3. 3. <ul><ul><ul><ul><ul><li>India is undergoing transition from rural to semi urban society. </li></ul></ul></ul></ul></ul><ul><li>Increasing migration from rural to urban areas. </li></ul><ul><li>Mismatch between demand and supply of sites and services . </li></ul><ul><li>Disparity between high land costs , cost of construction and lower incomes leading to non sustainable situation. </li></ul><ul><li>Construction sector provides employment to 16% of work force. </li></ul>PREVAILING SCENARIO
  4. 4. <ul><li>Lack of equitable supply of land, shelter and services at affordable prices. </li></ul><ul><li>Environmental paradigms neglected while design and planning . </li></ul><ul><li>Depletion of resources in construction and negligence of ecology in design . </li></ul><ul><li>Lack of application of cost effectiveness and energy efficiency in construction. </li></ul>PREVAILING SCENARIO
  5. 5. <ul><li>IHSDP Project Benefits to Slum Dwellers:- </li></ul><ul><li>Housing </li></ul><ul><li>Provision of Individual Toilets Drainage </li></ul><ul><li>Water Supply Arrangement </li></ul><ul><li>Roof Top Rain Water Harvesting </li></ul><ul><li>Electric Connection </li></ul><ul><li>Storm Water disposal pipe line </li></ul><ul><li>Community Center </li></ul>Project Benefit to Slum Dwellers
  6. 6. 8.Employment opportunities during project development 9.This Project will uplift the standard of living. 10.Creditworthiness of the dwellers will Improve. 11.After getting the tenure in family name they can get the personal loan . Project Benefit to Slum Dwellers
  7. 7. <ul><li>Use Of Advance Cost Effective Technology / Material , Earthquake Resistant Technology </li></ul>ENGG. SURVEY <ul><li>Fly -Ash, Lime and Gypsum mixed bricks (Fal-G) will be used for construction of dwelling units. </li></ul><ul><li>Precast Ferro Cement jali will be used in place of steel or wooden window. </li></ul><ul><li>Man Hole Covers For Inspection Chamber will be used made from precasted Ferro cement. </li></ul><ul><li>Precast RCC door frame will used in place of teak-wood frame. </li></ul><ul><li>Precast Ferro Cement Chhajja cum Lintal will be used in place of conventional insitu RCC for cost & time saving purpose. </li></ul><ul><li>Precast Ferro Cement steps will be used in place of conventional brick masonry. </li></ul>
  8. 8. PREVAILING SCENARIO
  9. 9. Justification for need of the project <ul><li>No any Housing scheme like Lok Awas Yojana (LAY) of GOM of VAMBAY (Valmiki Ambedkar Malin Basti Awas Yojana) was launche by the State or GOI. The above scheme was only in 61 town of the state. Hence DMC could not provide the basic need to slum residents. </li></ul><ul><li>The main object of IHSDP to provide shelter along with the basic need like Water, Road, Drain, Storm Water Disposal, Solid Waste Disposal, Sewerage, Street light etc are in one package which provides hygienic and habitable condition to the poor, which will definitely up lift the standard of living. </li></ul>
  10. 10. EXISTING SITE PLAN 303 units to be designed in a scarce area of 8961.0Sqm
  11. 11. PROPOSED SITE PLAN
  12. 13. PLAN OF A SINGLE FLAT
  13. 14. BUILDING PLAN
  14. 15. BUILDING PLAN WITH LAWN
  15. 16. COMMUNITY CENTRE
  16. 17. GROUND FLOOR FIRST FLOOR
  17. 18. SECOND FLOOR Third Floor
  18. 19. Community centre Small Area available for community centre which is situated at the entrance of the site.
  19. 20. TEMPLE
  20. 21. Landscaping Appropriate landscaping in small area available
  21. 22. Energy saving electrical fittings
  22. 23. Rainwater Harvesting
  23. 24. Storage Storage of Rain Water
  24. 25. THANK YOU “ A great building must begin with the unmeasurable, must go through the measurable means when it is being designed and in the end must be unmeasurable.” Louis Kahn

×