SlideShare is now on Android. 15 million presentations at your fingertips.  Get the app

×
  • Share
  • Email
  • Embed
  • Like
  • Save
  • Private Content
 

UnleashIT Casestudy

by on Mar 21, 2012

  • 233 views

Agile methods are increasingly popular of late due to flexibility of iterative development with changes, but there is a strong cost rationale for traditional work specialization and planned based ...

Agile methods are increasingly popular of late due to flexibility of iterative development with changes, but there is a strong cost rationale for traditional work specialization and planned based approaches to project management. One need not necessarily make a choice among these seemingly different options. Hybrid methods work with both, leveraging the best of both and unleash is a step in that direction.
The salient features of the product include
1) CMMI level 3, 4 and 5 compliance.
2) Early warning capability in-built. Systems are designed to provide early capability warning even before things get in wrong direction.
3) Follows complete project life cycle approach (SDLC) with executive controls.
4) Ability to create and re-use project templates for efficient projects execution.
5) Ability to customize and integrate with any existing ERP systems.
6) Features of TOC and critical chain approach are integrated.

Statistics

Views

Total Views
233
Views on SlideShare
233
Embed Views
0

Actions

Likes
0
Downloads
0
Comments
0

0 Embeds 0

No embeds

Accessibility

Upload Details

Uploaded via SlideShare as Microsoft PowerPoint

Usage Rights

© All Rights Reserved

Report content

Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
Post Comment
Edit your comment

UnleashIT Casestudy UnleashIT Casestudy Presentation Transcript