Introduction:THE FUTURE OF TUBE AND   PIPE CONNECTIONS        12/21/12
LOKRING Since the first installations in early 1989, LOKRING has become a major     supplier of high performance fluid and...
WELD   – NO WELD
®T E C H N O L O G Y C OR P OR A T I ON           Introduction to LOKRING
®T E C H N O L O G Y C OR P OR A T I ON           Introduction to LOKRING
®T E C H N O L O G Y C OR P OR A T I ON           Introduction to LOKRING
Step One: Cut the pipe, sawsall-type of saw          works quickly and with   no heat generation. Either 110vAC or        ...
Step Two: Briefly sand, gauge and mark eachpipe end (LOKRING flange components only   require inlet/single pipe conditioni...
Step Three: Slip fitting to one of the        prepared pipe ends.
Step 4: Span fitting between prepared   pipe ends, placement according togauge marks and engage first side with           ...
Step 5:          Each installation          oval is visible.
®
THATS ALL THERE IS TO IT…  ...JUST 5 EASY STEPS!!     CUT     PREP     INSERT     SWAGE     INSPECT
Call for a free product    demonstration Today         219-256-5419We provide piping and tubing     solutions that save   ...
Call for a free productdemonstration at your site today   NO WELDING   NO FLANGES   NO THREADS   NO LEAKS   NO KIDDING !
®                          15V24 Micro-alloyed                          Carbon Steel productA.   NPS pipe sizes           ...
®T E C H N O L OG Y C OR P OR A T I ON
®      T E C H N O L OG Y C OR P OR A T I ON                                      316L Stainless Steel ProductA.   NPS pip...
®T E C H N O L OG Y C OR P OR A T I ON
®      T E C H N O L OG Y C OR P OR A T I ON                                              333 AISI/SAE 4130 NACE          ...
®T E C H N O L OG Y C OR P OR A T I ON
Thank you for taking time out  from your busy schedule      STEVE BURKE      Exclusive Distributor      440-479-3986
Upcoming SlideShare
Loading in …5
×

Linked in power point.3

427 views
380 views

Published on

Introduction to Lokring Technology

0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total views
427
On SlideShare
0
From Embeds
0
Number of Embeds
1
Actions
Shares
0
Downloads
13
Comments
0
Likes
0
Embeds 0
No embeds

No notes for slide

Linked in power point.3

  1. 1. Introduction:THE FUTURE OF TUBE AND PIPE CONNECTIONS 12/21/12
  2. 2. LOKRING Since the first installations in early 1989, LOKRING has become a major supplier of high performance fluid and gas transfer fittings to the:Process, Chemical, Marine, Refinery, Mining, Power Generation, Railroad and Automotive Markets.LOKRING has:Qualified the SS and CS product line’s to ANSI B31 code standards Fire Tested to ASTM F1387 and API 607 Rev.#4 Helium Leak Tested to 2x10-11 Std. cc/sec. Installed millions of fittings Established a customer base of global industry leaders such as: Dow Chemical, Texaco, BP, GM, Ford , Merck & Co., E.I. Dupont, Shell Oil, Weyerhaeuser Paper, Union Pacific, ect. Experienced a rework rate of less than one tenth of 1% (versus much higher rework for conventional pipe joining methods)
  3. 3. WELD – NO WELD
  4. 4. ®T E C H N O L O G Y C OR P OR A T I ON Introduction to LOKRING
  5. 5. ®T E C H N O L O G Y C OR P OR A T I ON Introduction to LOKRING
  6. 6. ®T E C H N O L O G Y C OR P OR A T I ON Introduction to LOKRING
  7. 7. Step One: Cut the pipe, sawsall-type of saw works quickly and with no heat generation. Either 110vAC or rechargeable style.
  8. 8. Step Two: Briefly sand, gauge and mark eachpipe end (LOKRING flange components only require inlet/single pipe conditioning).
  9. 9. Step Three: Slip fitting to one of the prepared pipe ends.
  10. 10. Step 4: Span fitting between prepared pipe ends, placement according togauge marks and engage first side with tool head and hand pump.
  11. 11. Step 5: Each installation oval is visible.
  12. 12. ®
  13. 13. THATS ALL THERE IS TO IT… ...JUST 5 EASY STEPS!! CUT PREP INSERT SWAGE INSPECT
  14. 14. Call for a free product demonstration Today 219-256-5419We provide piping and tubing solutions that save time and money. This is a “NO HOT WORK” Permanent Joint.
  15. 15. Call for a free productdemonstration at your site today NO WELDING NO FLANGES NO THREADS NO LEAKS NO KIDDING !
  16. 16. ® 15V24 Micro-alloyed Carbon Steel productA. NPS pipe sizes 1/4” NPS – 4” NPSB. Matching Pipe Specifications ASTM A106 (Seamless) ASTM A53 (Seamless & ERW) ASTM 587 (ERW)C. Pipe Schedules Schedules 40/80 for 1/4” - 4” and 40/80/160 for 1/2”, 3/4” & 1”D. Governing Specifications B31.1 (Power Piping and Utilities) B31.3 (Refinery/Chemical)E. Operating Temperatures 650°F MaximumF. Operating Pressure Matching pipe per B31.1/B31.3
  17. 17. ®T E C H N O L OG Y C OR P OR A T I ON
  18. 18. ® T E C H N O L OG Y C OR P OR A T I ON 316L Stainless Steel ProductA. NPS pipe sizes 1/4” NPS – 3” NPSB. Matching Pipe Specifications ASTM A312 SS Pipe (Seamless) ASTM A312 SS Pipe (ERW) ASTM A106, ASTM A53 (CS pipe)C. Pipe Schedules Schedules 10/40/80 for 1/4” – 3”D. Governing Specifications B31.1 (Power Piping and Utilities) B31.3 (Refinery/Chemical) B31.4 /B31.5/B31.8E. Operating Temperatures -150F/800F (-101/425C)F. Operating Pressure Matching pipe per B31.1/B31.3
  19. 19. ®T E C H N O L OG Y C OR P OR A T I ON
  20. 20. ® T E C H N O L OG Y C OR P OR A T I ON 333 AISI/SAE 4130 NACE Carbon Steel ProductA. NPS pipe sizes 1/2” NPS – 4” NPSB. Matching Pipe Specifications ASTM A333 Gr 6 ASTM A106, API 5L & A53 Grades BC. Pipe Schedules Schedules 40/80 for 1/2 - 4” 40/80/160 for 1/2 – 2”D. Governing Specifications B31.1 (Power Piping and Utilities) B31.3 (Refinery/Chemical)E. Operating Temperatures -50F/400FF. Operating Pressure Matching pipe per B31.1/B31.3
  21. 21. ®T E C H N O L OG Y C OR P OR A T I ON
  22. 22. Thank you for taking time out from your busy schedule STEVE BURKE Exclusive Distributor 440-479-3986

×