Solutions for Sustainable Infrastructure                       Design, Engineering & Project ManagementOcto 2011   ober   ...
MaRS Planning & Engineering Services Private Limited601 Sur Mount, Opp. ISCON Mega Mall,S.G HighwayS G Highway, Ahmedabad ...
About UsMaRS Planning & Engineering Services Private Limited, a provider of design, engineering & projectmanagement servic...
Vision, Mission, & Strengths                                          Vision: To be major professional services provider o...
Sectors    Water & Environment                  Roads &                            Buildings & Industries                 ...
StaffSector wise staff details                                         Experience wise staff detailsSr. No   Category     ...
Our PresenceAhmedabad        Mumbai      Bangalore   Mysore                Raipur             Haryana               Kolkat...
Selected Clients
Associations & RegistrationsInternational JV PartnersApproved Vendor    World Bank    W ld B k                   (Registra...
Sectors1.1 Water & Environment
Water & EnvironmentAt MaRS, our approach to delivering services in Water & Environmental sector – whether a city water sup...
Water & EnvironmentWater Supply   Drainage   Storm Water   Solid Waste   EIA   Others
Water & Environment – Selected Projects (1)Water Supply         Drainage              Storm Water           Solid Waste   ...
Water & Environment – Selected Projects (2)Water Supply         Drainage              Storm Water           Solid Waste   ...
Water & Environment – Selected Projects (3)Water Supply         Drainage              Storm Water           Solid Waste   ...
Water & Environment – Selected Projects (4)Water Supply         Drainage              Storm Water           Solid Waste   ...
Water & Environment – Selected Projects (5)Water Supply         Drainage              Storm Water           Solid Waste   ...
Water & Environment – Selected Projects (6)Water Supply         Drainage           Storm Water          Solid Waste   EIA ...
Water & Environment – Selected Projects (7)Water Supply         Drainage              Storm Water           Solid Waste   ...
Water & Environment – Selected Projects (8)Water Supply         Drainage              Storm Water           Solid Waste   ...
Water & Environment – Selected Projects (9)Water Supply         Drainage              Storm Water           Solid Waste   ...
Water & Environment – Selected Projects (10)Water Supply         Drainage           Storm Water            Solid Waste   E...
Water & Environment – Selected Projects (11)Water Supply         Drainage              Storm Water            Solid Waste ...
Water & Environment – Selected Projects (12)Water Supply         Drainage              Storm Water           Solid Waste  ...
Water & Environment – Selected Projects (13)Water Supply         Drainage           Storm Water            Solid Waste   E...
Water & Environment – Selected Projects (14)Water Supply         Drainage           Storm Water            Solid Waste   E...
Water & Environment – Selected Projects (15)Water Supply         Drainage           Storm Water            Solid Waste   E...
Water & Environment – Selected Projects (16) Water Supply         Drainage           Storm Water          Solid Waste   EI...
Water & Environment – Selected Projects (17) Water Supply         Drainage           Storm Water          Solid Waste   EI...
Water & Environment – Selected Projects (18)Water Supply         Drainage           Storm Water          Solid Waste   EIA...
Water & Environment – Selected Projects (19) Water Supply         Drainage           Storm Water          Solid Waste   EI...
Water & Environment – Selected Projects (20) Water Supply         Drainage             Storm Water        Solid Waste   EI...
Water & Environment – Selected Projects (21) Water Supply         Drainage           Storm Water          Solid Waste   EI...
Water & Environment – Selected Projects (22) Water Supply         Drainage           Storm Water          Solid Waste   EI...
Water & Environment – Selected Projects (23) Water Supply         Drainage             Storm Water        Solid Waste   EI...
Water & Environment – Selected Projects (24) Water Supply         Drainage           Storm Water          Solid Waste   EI...
Water & Environment – Selected Projects (25) Water Supply         Drainage           Storm Water          Solid Waste   EI...
Water & Environment – Selected Projects (26) Water Supply         Drainage           Storm Water          Solid Waste   EI...
Water & Environment – Selected Projects (27) Water Supply         Drainage           Storm Water          Solid Waste   EI...
Water & Environment – Selected Projects (28) Water Supply         Drainage            Storm Water         Solid Waste   EI...
Water & Environment – Selected Projects (29) Water Supply         Drainage           Storm Water          Solid Waste   EI...
Water & Environment – Selected Projects (30) Water Supply         Drainage           Storm Water          Solid Waste   EI...
Water & EnvironmentWater Supply   Drainage   Storm Water   Solid Waste   EIA   Others
Water & Environment – Selected Projects (1)Water Supply         Drainage            Storm Water           Solid Waste   EI...
Water & Environment – Selected Projects (2)Water Supply         Drainage           Storm Water            Solid Waste   EI...
Water & Environment – Selected Projects (3)Water Supply         Drainage            Storm Water           Solid Waste   EI...
Water & Environment – Selected Projects (4)Water Supply         Drainage           Storm Water            Solid Waste   EI...
Water & Environment – Selected Projects (5)Water Supply         Drainage           Storm Water            Solid Waste   EI...
Water & Environment – Selected Projects (6)Water Supply         Drainage            Storm Water           Solid Waste   EI...
Water & Environment – Selected Projects (7)Water Supply         Drainage            Storm Water           Solid Waste   EI...
Water & Environment – Selected Projects (8) Water Supply         Drainage            Storm Water         Solid Waste   EIA...
Water & Environment – Selected Projects (9) Water Supply         Drainage           Storm Water          Solid Waste   EIA...
Water & Environment – Selected Projects (10) Water Supply         Drainage           Storm Water           Solid Waste   E...
Water & Environment – Selected Projects (11) Water Supply         Drainage              Storm Water        Solid Waste   E...
Water & Environment – Selected Projects (12) Water Supply         Drainage              Storm Water        Solid Waste   E...
Water & Environment – Selected Projects (13) Water Supply         Drainage              Storm Water        Solid Waste   E...
Water & Environment – Selected Projects (14) Water Supply         Drainage              Storm Water        Solid Waste   E...
Water & Environment – Selected Projects (14) Water Supply         Drainage           Storm Water           Solid Waste   E...
Water & EnvironmentWater Supply   Drainage   Storm Water   Solid Waste   EIA   Others
Water & Environment – Selected Projects (1)Water Supply         Drainage            Storm Water           Solid Waste   EI...
Water & Environment – Selected Projects (2)Water Supply         Drainage           Storm Water            Solid Waste   EI...
Water & EnvironmentWater Supply   Drainage   Storm Water   Solid Waste   EIA   Others
Water & Environment – Selected Projects (1) Water Supply         Drainage            Storm Water           Solid Waste   E...
Water & Environment – Selected Projects (2) Water Supply         Drainage            Storm Water          Solid Waste   EI...
Sectors2.2 Roads & Transportation
Roads & TransportationWith experience in delivering some of India’s recent major road projects including expressways, 6 la...
Roads & Transportation – Selected Projects (1) PMC for Roads – GSRRDA – Kutch 740 Kms Client              Gujarat State Ru...
Roads & Transportation – Selected Projects (2) PMC for Roads – GSRRDA – Panchmahal 372 Kms Client              Gujarat Sta...
Roads & Transportation – Selected Projects (3) PMC for Infrastructure Development – Industrial Estate – Mehasana Division ...
Roads & Transportation – Selected Projects (4) PMC for Infrastructure Development – Industrial Estate – Ahmedabad Division...
Roads & Transportation – Selected Projects (5) PMC for Infrastructure Development – Industrial Estate – Tata Nano Sanand C...
Roads & Transportation – Selected Projects (6) PMC for Road Development – JADA - Jamnagar Client              Jamnagar Are...
Roads & Transportation – Selected Projects (7) PMC for Road Development – GMB - Jamnagar Client              Gujarat Marit...
Roads & Transportation – Selected Projects (8) DPR Preparation and PMC for Fly Over Bridge – Nr. Delhi Gate To Suraj Pole ...
Roads & Transportation– Selected Projects (9)  Infrastructure Upgradation At Gidc Estates (Cip  Scheme) (Mahesana Billimor...
Sectors3.3 Buildings & Industries
Buildings & IndustriesMaRS Planning & Engineering provides engineering design and project management for all types of buil...
Buildings & Industries– Selected Projects (1)  Design, DPR & PMC for upcoming school Buildings  under RMSA Karnatka       ...
Buildings & Industries– Selected Projects (2)  Design, DPR & PMC for upcoming school Buildings  under Karnataka Residentia...
Buildings & Industries– Selected Projects (3) Design, DPR & PMC for upcoming district hospital at Rajpipla, Rajpipla Gujar...
Buildings & Industries– Selected Projects (4) Design, DPR & PMC for Alpha College of Engineering & Technology at Khatraj A...
Buildings & Industries– Selected Projects (5) Design, DPR & PMC for School Buildings for Nadiad Municipality Client       ...
Buildings & Industries– Selected Projects (6) PMC for EWS HOUSING THALTEJ & VASTRAL 220 : 4248 DU Client              Ahme...
Buildings & Industries– Selected Projects (7) PMC for EWS HOUSING VASTRAL 200 & 215 : 2240 DU Client              Ahmedaba...
Buildings & Industries– Selected Projects (8) PMC for Integrated Housing Scheme Development Program – Bagasara – 1088 Du C...
Buildings & Industries– Selected Projects (9) PMC for Swaminarayan Gurukul Campus At Kanbha Client              SWAMINARAY...
Buildings & Industries– Selected Projects (10) PMC for Third Party Technical Supervision, Monitoring & Quality Assurance o...
Buildings & Industries– Selected Projects (11) Design and DPR for INTEGRATED HOUSING SLUM DEVELOPMENT (IHSDP) – GUDM - ODE...
Buildings & Industries– Selected Projects (12) Design, DPR & PMC for Integrated Housing Slum Development (Ihsdp) – Gudm - ...
Buildings & Industries– Selected Projects (13) PMC for Indo German Tool Room, Ahmedabad For Construction Work After The Ea...
Buildings & Industries– Selected Projects (14) PMC for Construction Of New Building Of Gujarat Samachar Press Surat       ...
Buildings & Industries– Selected Projects (12) Design, DPR & PMC for APOLLO INFRATECH PVT. LTD Client               APOLLO...
Sectors4.4 Urban & Regional Planning
Urban & Regional PlanningNo matter how large or small is a community, spatial design programs such as parcels, zoning, lan...
Urban & Regional Planning– Selected Projects (1)  Preparation of Town Planning Scheme for Surat area  TP 42 & 43 , Bhimrad...
Urban & Regional Planning– Selected Projects (2)  Preparation of Town Planning Scheme No. 3, 4 & 5 for  Mehsana Nagar Pali...
Urban & Regional Planning– Selected Projects (3)  Preparation of Town Planning for Dhangadhara Nagar  Palika.  Palika  Cli...
Urban & Regional Planning– Selected Projects (4)  City Development Plan for 7 cities in Madhya  Pradesh,  Pradesh India  C...
Sectors5. Testing & Investigations
Testing & InvestigationsMaRS, through its sister concern MaRS Enviro Research and Engineering Services Private Limited, ba...
Mechanical Testing     HSC-CF PUMPS     VERTICAL TURBINE PUMPS     SUBMERSIBLE PUMPS     SUBMERGED C.F. PUMPS     TUBE WEL...
ELECTRICAL & INSTRUMENTATION EQUIPMENTS    TRANSFORMERS    SWITCH GEAR CONTROL PANELS    CAPACITOR BANK WITH CONTROL PANEL...
PIPES AND SPECIALS: ( RANGING FROM 150MM TO 2000MM DIA.)     MILD STEEL PIPES     DUCTILE IRON PIPES     CAST IRON PIPES  ...
Survey Equipments    Sr. No.   Name of the equipments                Nos.      01      Total Station (Leica 407 & Set1010)...
Sectors6. Facility Management
Facility ManagementFacilities Management is a profession that encompasses multiple disciplines to ensure functionality of ...
Upcoming SlideShare
Loading in...5
×

Mars Company Profile

1,357

Published on

MaRS Planning & Engineering Services Private Limited, a provider of design, engineering & project
management services since last 11 years, is one of the leading consulting services providers in the
Indian Subcontinent. We have a proven name and experience of designing and implementing large
scale infrastructure projects in areas such as water supply schemes, waste water disposal and
treatment, roads and transportation infrastructure, mass housing schemes, landmark commercial and
industrial projects, solid waste management, etc. Formed in 2001, MaRS now employs more than 250
professionals nationally in over 4 offices on 8 States of India.
We have accumulated considerable experience working on a wide variety of projects, and we
maintain close working relationships with specialists and expert professionals Using professionals. our superior
methodology and strong partnership with our customers, MaRS’s highly specialized and trained
people are providing services and solutions that are helping to create sustainable infrastructure for
the future. Today, MaRS maintains a leading position as a service provider of both detailed
engineering and project management services.
Among MaRS\'s 300 plus clients are most of the India\'s major government organizations, urban & local
bodies, internationally reputed organizations, leading construction firms and top corporate houses in
India. The reliability of our business resources and expertise is reflected in our exceptional client
retention. For fulfilling our client’s needs successfully, we have employed the best of people with
quality education and qualified experience.

0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total Views
1,357
On Slideshare
0
From Embeds
0
Number of Embeds
1
Actions
Shares
0
Downloads
19
Comments
0
Likes
0
Embeds 0
No embeds

No notes for slide

Transcript of "Mars Company Profile"

  1. 1. Solutions for Sustainable Infrastructure Design, Engineering & Project ManagementOcto 2011 ober Company Profile & Capabilities Statement www.marsconsultancy.com y
  2. 2. MaRS Planning & Engineering Services Private Limited601 Sur Mount, Opp. ISCON Mega Mall,S.G HighwayS G Highway, Ahmedabad - 380 015Tele-Fax : (+) 91-79-2686 0130E-mail : info@marsconsultancy.comWebsite: www.marsconsultancy.comAhmedabad Mumbai Bangalore Mysore Raipur Haryana Kolkata Oman
  3. 3. About UsMaRS Planning & Engineering Services Private Limited, a provider of design, engineering & projectmanagement services since last 11 years, is one of the leading consulting services providers in theIndian Subcontinent. We have a proven name and experience of designing and implementing largescale infrastructure projects in areas such as water supply schemes, waste water disposal andtreatment, roads and transportation infrastructure, mass housing schemes, landmark commercial andindustrial projects, solid waste management, etc. Formed in 2001, MaRS now employs more than 250professionals nationally in over 4 offices on 8 States of India.We have accumulated considerable experience working on a wide variety of projects, and wemaintain close working relationships with specialists and expert professionals Using our superior professionals.methodology and strong partnership with our customers, MaRS’s highly specialized and trainedpeople are providing services and solutions that are helping to create sustainable infrastructure forthe future Today MaRS maintains a leading position as a service provider of both detailed future. Today,engineering and project management services.Among MaRSs 300 plus clients are most of the Indias major government organizations, urban & localbodies, internationally reputed organizations, leading construction firms and top corporate houses inIndia. The reliability of our business resources and expertise is reflected in our exceptional clientretention. For fulfilling our client’s needs successfully, we have employed the best of people withquality education and qualified experience. l d d lf d
  4. 4. Vision, Mission, & Strengths Vision: To be major professional services provider offering high quality engineering and a project management services which add value to our customers business. Mission: To deliver high quality consultancy services to our clients by providing time bound, cost effective, innovative and technically best solutions through our qualified, motivated and committed workforce.Strengths• Well experienced management staff from different spectrum of infrastructure consultancy• Highly qualified technocrats in all the sectors• Capacity to mobilize large number of competent workforce anywhere in India Capacity to mobilize large number of competent workforce anywhere in India• Commitment to work with Quality & Time as Priority• Professional approach to the work with high technical standards and comparatively low cost• Large base of association with technocrats in different areas of consultancy to deliver the best possible solutions / alternatives to the project for the ultimate benefit of our valued clients.• Empanelled with all leading international and national organizations.
  5. 5. Sectors Water & Environment Roads & Buildings & Industries Transportation •Water Supply Projects •Residential & Commercial •Waste Water & UG Drainage •Townships •Storm water Drainage g •Expressways •Industrial Projects j •Treatment Plants •N ti National & St t Highways l State Hi h •Institutional •Solid Waste Management •Major District Roads •Mass Housing & EWS •City/ULB Environmental Plan •Bridges, Flyovers & Underpasses •SSA, RMSA, & Other Works •Ring Roads •Other Specialized Requirements Urban & Regi. Testing & Facility Management Planning Investigations •MEP Systems •Soft Services •City Development Plans •Geotechnical Investigations •Hard Services •Rural Development Plans •Building Materials Testing •Risk Management •Town Planning Schemes •Pavement Materials Testing •Administration •Establishment of Townships •Mechanical & Machineries •Other Services •Property Development Advice •Electrical & Equipments •Rezoning & Consolidation of lands •Environmental Impacts Testing
  6. 6. StaffSector wise staff details Experience wise staff detailsSr. No Category No. Sr. No Sr No Category No. No1 Water & Waste water 252 Town planning & Urban planning 5 1 More than 15 years 473 Roads, Highways & Bridges 25 2 10 ‐ 15 years 424 Building & Architectural Building & Architectural 15 3 5 ‐ 10 years 5 10 years 485 Project management & TPI 120 4 Less than 5 years 526 Quality control & material inspection 30 5 Trainee engineers 417 Adminstration, HR, Accounts & Other office staff 10Total 230 Total T t l 230
  7. 7. Our PresenceAhmedabad Mumbai Bangalore Mysore Raipur Haryana Kolkata Oman Gurgaon,  Gurgaon, Haryana Kolkata Muscat,  Oman Liaison Office Liaison Office International  Office ff Head Office Ahmedabad,  Gujarat International  Liaison Office Liaison Office Office Offi Mumbai,  Raipur,  Lagos, Nigeria Maharashtra Liaison Office Chhattisgarh  Bangalore &  Mysore M
  8. 8. Selected Clients
  9. 9. Associations & RegistrationsInternational JV PartnersApproved Vendor World Bank W ld B k (Registration No. (R i t ti N 21984) Asian Development Bank (Registration No. 002909) African Development Bank (Registration No. 00076239)
  10. 10. Sectors1.1 Water & Environment
  11. 11. Water & EnvironmentAt MaRS, our approach to delivering services in Water & Environmental sector – whether a city water supplyscheme, a regional water treatment plant, or a city sanitation plan – is always logic‐based, project‐specific,and tailored to our clients’ particular requirements. Our ability to deliver high‐quality design, engineering & projectmanagement services i b d on our teams’ strong understanding of the standards, codes, d i i is based ’ d di f h d d d design‐processes,national and local policies, project constraints, and financial issues specific to each of our clients and their respectiveindustries and sectors. We use a wide range of the latest technical software for water and environmental modelingwith highly‐skilled and experienced staff. g y pAn important obstacle to achieving environmental goals in many projects has been the failure to adequately addressthe associated financial issues: the costs of achieving environmental goals; how those costs could be minimized; andthe challenge of matching costs with available resources In order to tackle the financial issue we not only focus on resources. issue,the design and engineering aspects of the project but integrate the key financial constraints and availability withoverall project execution process. Requirement Planning Water S l S h W t Supply Schemes Survey & Investigations Waste Water & UG Drainage High L l d i Hi h Level design & Feasibilities F ibiliti Storm Water Drainage Detailed Design & Engineering Treatment Plants Tendering, BoQ Tendering BoQ, & Estimates Solid Waste Management Project Management & TPI work City/ULB Environmental Plan
  12. 12. Water & EnvironmentWater Supply Drainage Storm Water Solid Waste EIA Others
  13. 13. Water & Environment – Selected Projects (1)Water Supply Drainage Storm Water Solid Waste EIA Others PMC f W t S l S h for Water Supply Scheme Una Package No 24 – ( 70 Kms.) Client Gujarat Water Infrastructure Limited, Gandhinagar, Gujarat Project Cost INR 2530 Millions Contractor Larsen & Toubro Ltd. - Chennai Scheme Govt. of Gujarat Status Completed Services Provided • Project Monitoring • Progress Review • Document Control & Management • Construction Supervision • Approval & Implementation of Quality Systems • Quality Audits • Material Inspections (Mechanical, Electrical, & Instrumentation)PMC
  14. 14. Water & Environment – Selected Projects (2)Water Supply Drainage Storm Water Solid Waste EIA Others PMC F W t Treatment Plant 200mld Capacity For Water T t t Pl t 200 ld C it Client Ahmedabad Municipal Corporation, Ahmedabad, Gujarat j Project Cost INR 325 Millions Contractor Nagarjuna Construction Co. Ltd. – Hyderabad Scheme JnNURM – Central Govt. Status Completed Services Provided • Project Monitoring • Progress Review • Document Control & Management • Construction Supervision • Approval & Implementation of Quality Systems • Quality Audits • Material Inspections (Mechanical, Electrical, & Instrumentation)PMC
  15. 15. Water & Environment – Selected Projects (3)Water Supply Drainage Storm Water Solid Waste EIA Others PMC for Water Supply Scheme Wakaner – 460 Kms. Client Gujarat Water Supply & Sewerage Board, Gandhinagar, Gujarat. Project Cost INR 1090 Millions Contractor Gammon India Ltd. - Mumbai Scheme Govt. of Gujarat Status Completed Services Provided • Project Monitoring • Progress Review • Document Control & Management • Construction Supervision • Approval & Implementation of Quality Systems • Quality Audits • Material Inspections (Mechanical, Electrical, & Instrumentation)PMC
  16. 16. Water & Environment – Selected Projects (4)Water Supply Drainage Storm Water Solid Waste EIA Others PMC for Water Supply Scheme Una Package No 25 – ( 236 Kms.) Client Gujarat Water Infrastructure Limited, Gandhinagar, Gujarat Project Cost INR 432 Millions Contractor G S K Projects Ltd. Scheme Govt. of Gujarat Status WIP Services Provided • Project Monitoring • Progress Review • Document Control & Management • Construction Supervision • Approval & Implementation of Quality Systems • Quality Audits • Material Inspections (Mechanical, Electrical, & Instrumentation)PMC
  17. 17. Water & Environment – Selected Projects (5)Water Supply Drainage Storm Water Solid Waste EIA Others PMC for Water Supply Scheme Surendranagar – 960 Kms Client Gujarat Water Supply & Sewerage Board, Gandhinagar, Gujarat. Project Cost INR 1075 Millions Contractor Gammon India Ltd. - Mumbai Scheme Govt. of Gujarat Status Completed Services Provided • Project Monitoring • Progress Review • Document Control & Management • Construction Supervision • Approval & Implementation of Quality Systems • Quality Audits • Material Inspections (Mechanical, Electrical, & Instrumentation)PMC
  18. 18. Water & Environment – Selected Projects (6)Water Supply Drainage Storm Water Solid Waste EIA Others DPR & PMC for water supply scheme – Nadiad Town, Gujarat Client Gujarat Urban Development Mission, Gandhinagar, Gujarat Project Cost INR 574 Millions Scheme Govt. of Gujarat Status WIP Services Provided • Route Survey & Base Map Preparation • Requirement planning • Feasibility & High Level Design • Detailed Design & Engineering • Specifications & Working Drawings • O&M Guidelines • Tender preparation • Project Management Services • Quality Management ServicesPMC Design
  19. 19. Water & Environment – Selected Projects (7)Water Supply Drainage Storm Water Solid Waste EIA Others PMC services to Surat Urban Development Authority for water supply project Client Surat Urban Development Authority (SUDA), Surat, Gujarat. Project Cost INR 280 Millions Contractor Enviro Control Private Limited Scheme Govt. of Gujarat Status Completed Services Provided • Project Monitoring • Progress Review • Document Control & Management • Construction Supervision • Approval & Implementation of Quality Systems • Quality Audits • Material Inspections (Mechanical, Electrical, & Instrumentation)PMC
  20. 20. Water & Environment – Selected Projects (8)Water Supply Drainage Storm Water Solid Waste EIA Others PMC f W t S l S h for Water Supply Scheme Navda Botad Client Gujarat Water Infrastructure Limited, Gandhinagar, Gujarat Project Cost INR 100 Million Scheme Govt. of Gujarat Status WIP Services Provided • Project Monitoring • Progress Review • Document Control & Management • Construction Supervision • Approval & Implementation of Quality Systems • Quality Audits • Material Inspections (Mechanical, Electrical, & Instrumentation)PMC
  21. 21. Water & Environment – Selected Projects (9)Water Supply Drainage Storm Water Solid Waste EIA Others PMC f R i l W t S l S h for Regional Water Supply Scheme Hafeshwar Client Gujarat Water Supply & Sewerage Board, Gandhinagar, Gujarat Project Cost 1070 Millions Scheme Govt. of Gujarat Status WIP Services Provided • Project Monitoring • Progress Review • Document Control & Management • Construction Supervision • Approval & Implementation of Quality Systems • Quality Audits • Material Inspections (Mechanical, Electrical, & Instrumentation)PMC
  22. 22. Water & Environment – Selected Projects (10)Water Supply Drainage Storm Water Solid Waste EIA Others PMC and Design Verification for EPC contract of water supply scheme based on Narmada Pipeline for Bhavnagar Municipal Corporation Client Bhavnagar Municipal Corporation, Bhavnagar Project Cost INR 260 Millions Scheme S h Govt. f Gujarat G t of G j t Status Completed Services Provided • Design Verification • Project Monitoring • Progress Review • Document Control & Management • Construction Supervision • Approval & Implementation of Quality Systems • Quality Audits • Material Inspections (Mechanical, Electrical, & Instrumentation)PMC
  23. 23. Water & Environment – Selected Projects (11)Water Supply Drainage Storm Water Solid Waste EIA Others PMC f R i l W t S l S h for Regional Water Supply Scheme Bhalpradesh Client Gujarat Water Supply & Sewerage Board, Gandhinagar, Gujarat Project Cost INR 450 Millions Contractor M/S Engineering Professional Co. Pvt. Ltd. Scheme Govt. of Gujarat Status WIP Services Provided • Project Monitoring • Progress Review • Document Control & Management • Construction Supervision • Approval & Implementation of Quality Systems • Quality Audits • Material Inspections (Mechanical, Electrical, & Instrumentation)PMC
  24. 24. Water & Environment – Selected Projects (12)Water Supply Drainage Storm Water Solid Waste EIA Others PMC f R i l W t S l S h for Regional Water Supply Scheme Bedia - Machundri Client Gujarat Water Supply & Sewerage Board, Gandhinagar, Gujarat Project Cost INR 430 Millions Contractor M/s. G.K.C. Projects Croves, Hyderabad Scheme Govt. of Gujarat Status WIP Services Provided • Project Monitoring • Progress Review • Document Control & Management • Construction Supervision • Approval & Implementation of Quality Systems • Quality Audits • Material Inspections (Mechanical, Electrical, & Instrumentation)PMC
  25. 25. Water & Environment – Selected Projects (13)Water Supply Drainage Storm Water Solid Waste EIA Others PMC for water supply scheme - Keshod Client Gujarat Urban Development Mission, Gandhinagar, Gujarat Contractor Classic Networks Private Limited Project Cost INR 104 Millions Scheme Govt. of Gujarat Status Completed Services Provided • Project Monitoring • Progress Review • Document Control & Management • Construction Supervision • Approval & Implementation of Quality Systems • Quality Audits • Material Inspections (Mechanical, Electrical, & Instrumentation) • Bill CertificationPMC
  26. 26. Water & Environment – Selected Projects (14)Water Supply Drainage Storm Water Solid Waste EIA Others PMC for 11 MLD filtration plant at Amreli Client Gujarat Urban Development Mission, Gandhinagar, Gujarat Contractor Maruti Trading Company Limited Project Cost INR 10 Millions Scheme Govt. of Gujarat Status Complete Services Provided • Project Monitoring • Progress Review • Document Control & Management • Construction Supervision • Approval & Implementation of Quality Systems • Quality Audits • Material Inspections (Mechanical, Electrical, & Instrumentation) • Bill CertificationPMC
  27. 27. Water & Environment – Selected Projects (15)Water Supply Drainage Storm Water Solid Waste EIA Others PMC for ESR & Sumps (Water Supply Structures) Client Gujarat Urban Development Mission, Gandhinagar, Gujarat Contractor HH Ripani, Pune Project Cost INR 10 Millions Scheme Govt. of Gujarat Status Complete Services Provided • Project Monitoring • Progress Review • Document Control & Management • Construction Supervision • Approval & Implementation of Quality Systems • Quality Audits • Material Inspections (Mechanical, Electrical, & Instrumentation) • Bill CertificationPMC
  28. 28. Water & Environment – Selected Projects (16) Water Supply Drainage Storm Water Solid Waste EIA Others DPR for water supply scheme – Veraval -Patan Client Gujarat Urban Development Mission, Gandhinagar, Gujarat Project Cost INR 770 Millions Scheme Govt. of Gujarat Status Complete Services Provided • Route Survey & Base Map Preparation • Requirement planning • F ibilit & Hi h L l Design Feasibility High Level D i • Detailed Design & Engineering • Specifications & Working Drawings • O&M Guidelines • T d preparation Tender tiDesign
  29. 29. Water & Environment – Selected Projects (17) Water Supply Drainage Storm Water Solid Waste EIA Others DPR for water supply scheme – Kanakpur Kansad- Gujarat Client Gujarat Urban Development Mission, Gandhinagar, Gujarat Project Cost INR 220 Millions Scheme Govt. of Gujarat Status Complete Services Provided • Route Survey & Base Map Preparation • Requirement planning • Feasibility & High Level Design • Detailed Design & Engineering • Specifications & Working Drawings • O&M Guidelines • Tender preparationDesign
  30. 30. Water & Environment – Selected Projects (18)Water Supply Drainage Storm Water Solid Waste EIA Others DPR for water supply scheme – Mangrol- Gujarat Client Gujarat Urban Development Mission, Gandhinagar, Gujarat Project Cost INR 220 Millions Scheme Govt. of Gujarat Status Complete Services Provided • Route Survey & Base Map Preparation • Requirement planning • F ibilit & Hi h L l Design Feasibility High Level D i • Detailed Design & Engineering • Specifications & Working Drawings • O&M Guidelines • T d preparation Tender tiDesign
  31. 31. Water & Environment – Selected Projects (19) Water Supply Drainage Storm Water Solid Waste EIA Others DPR for water supply scheme – Piplaj, Vasna, Acher at Ahmedabad Client Ahmedabad Municipal Corporation, Ahmedabad, Gujarat Project Cost INR 200 Millions Scheme Govt. of Gujarat Status Complete Services Provided • Route Survey & Base Map Preparation • Requirement planning • Feasibility & High Level Design • Detailed Design & Engineering • Specifications & Working Drawings • O&M Guidelines • Tender preparationDesign
  32. 32. Water & Environment – Selected Projects (20) Water Supply Drainage Storm Water Solid Waste EIA Others DPR for water supply scheme – Rajpipla Town, Gujarat Client Gujarat Urban Development Mission, Gandhinagar, Gujarat Project Cost INR 102.8 Millions Scheme Govt. of Gujarat Status Complete Services Provided • Route Survey & Base Map Preparation • Requirement planning • Feasibility & High Level Design • Detailed Design & Engineering • Specifications & Working Drawings • O&M Guidelines • Tender preparationDesign
  33. 33. Water & Environment – Selected Projects (21) Water Supply Drainage Storm Water Solid Waste EIA Others DPR for water supply scheme – Mahuva Town - Gujarat Client Gujarat Urban Development Mission, Gandhinagar, Gujarat Project Cost INR 160 Millions Scheme Govt. of Gujarat Status Complete Services Provided • Route Survey & Base Map Preparation • Requirement planning • Feasibility & High Level Design • Detailed Design & Engineering • Specifications & Working Drawings • O&M Guidelines • Tender preparationDesign
  34. 34. Water & Environment – Selected Projects (22) Water Supply Drainage Storm Water Solid Waste EIA Others DPR for water supply scheme – Limdi- Gujarat Client Gujarat Urban Development Mission, Gandhinagar, Gujarat Project Cost INR 150 Millions Scheme Govt. of Gujarat Status Complete Services Provided • Route Survey & Base Map Preparation • Requirement planning • F ibilit & Hi h L l Design Feasibility High Level D i • Detailed Design & Engineering • Specifications & Working Drawings • O&M Guidelines • T d preparation Tender tiDesign
  35. 35. Water & Environment – Selected Projects (23) Water Supply Drainage Storm Water Solid Waste EIA Others DPR for water supply scheme – Dhanduka - Gujarat Client Gujarat Urban Development Mission, Gandhinagar, Gujarat Project Cost INR 112.2 Millions Scheme Govt. of Gujarat Status Complete Services Provided • Route Survey & Base Map Preparation • Requirement planning • F ibilit & Hi h L l Design Feasibility High Level D i • Detailed Design & Engineering • Specifications & Working Drawings • O&M Guidelines • T d preparation Tender tiDesign
  36. 36. Water & Environment – Selected Projects (24) Water Supply Drainage Storm Water Solid Waste EIA Others DPR for water supply scheme – Umargaon- Gujarat Client Gujarat Urban Development Mission, Gandhinagar, Gujarat Project Cost INR 160 Millions Scheme Govt. of Gujarat Status Complete Services Provided • Route Survey & Base Map Preparation • Requirement planning • F ibilit & Hi h L l Design Feasibility High Level D i • Detailed Design & Engineering • Specifications & Working Drawings • O&M Guidelines • T d preparation Tender tiDesign
  37. 37. Water & Environment – Selected Projects (25) Water Supply Drainage Storm Water Solid Waste EIA Others DPR for water supply scheme – Bareja- Gujarat Client Gujarat Urban Development Mission, Gandhinagar, Gujarat Project Cost INR 100 Millions Scheme Govt. of Gujarat Status Complete Services Provided • Route Survey & Base Map Preparation • Requirement planning • F ibilit & Hi h L l Design Feasibility High Level D i • Detailed Design & Engineering • Specifications & Working Drawings • O&M Guidelines • T d preparation Tender tiDesign
  38. 38. Water & Environment – Selected Projects (26) Water Supply Drainage Storm Water Solid Waste EIA Others DPR for water supply scheme – Dholka- Gujarat Client Gujarat Urban Development Mission, Gandhinagar, Gujarat Project Cost INR 86 Millions Scheme Govt. of Gujarat Status Complete Services Provided • Route Survey & Base Map Preparation • Requirement planning • F ibilit & Hi h L l Design Feasibility High Level D i • Detailed Design & Engineering • Specifications & Working Drawings • O&M Guidelines • T d preparation Tender tiDesign
  39. 39. Water & Environment – Selected Projects (27) Water Supply Drainage Storm Water Solid Waste EIA Others DPR for water supply scheme – Salaya- Gujarat Client Gujarat Urban Development Mission, Gandhinagar, Gujarat Project Cost INR 835 Millions Scheme Govt. of Gujarat Status Complete Services Provided • Route Survey & Base Map Preparation • Requirement planning • F ibilit & Hi h L l Design Feasibility High Level D i • Detailed Design & Engineering • Specifications & Working Drawings • O&M Guidelines • T d preparation Tender tiDesign
  40. 40. Water & Environment – Selected Projects (28) Water Supply Drainage Storm Water Solid Waste EIA Others DPR for water supply scheme – Vadali - Gujarat Client Gujarat Urban Development Mission, Gandhinagar, Gujarat Project Cost INR 34.8 Millions Scheme Govt. of Gujarat Status Complete Services Provided • Route Survey & Base Map Preparation • Requirement planning • F ibilit & Hi h L l Design Feasibility High Level D i • Detailed Design & Engineering • Specifications & Working Drawings • O&M Guidelines • T d preparation Tender tiDesign
  41. 41. Water & Environment – Selected Projects (29) Water Supply Drainage Storm Water Solid Waste EIA Others DPR for water supply scheme – Somnath - Gujarat Client Gujarat Urban Development Mission, Gandhinagar, Gujarat Project Cost INR 35 Millions Scheme Govt. of Gujarat Status Complete Services Provided • Route Survey & Base Map Preparation • Requirement planning • F ibilit & Hi h L l Design Feasibility High Level D i • Detailed Design & Engineering • Specifications & Working Drawings • O&M Guidelines • T d preparation Tender tiDesign
  42. 42. Water & Environment – Selected Projects (30) Water Supply Drainage Storm Water Solid Waste EIA Others DPR for water supply scheme – Bhachau- Gujarat Client Gujarat Urban Development Mission, Gandhinagar, Gujarat Project Cost INR 20 Millions Scheme Govt. of Gujarat Status Complete Services Provided • Route Survey & Base Map Preparation • Requirement planning • F ibilit & Hi h L l Design Feasibility High Level D i • Detailed Design & Engineering • Specifications & Working Drawings • O&M Guidelines • T d preparation Tender tiDesign
  43. 43. Water & EnvironmentWater Supply Drainage Storm Water Solid Waste EIA Others
  44. 44. Water & Environment – Selected Projects (1)Water Supply Drainage Storm Water Solid Waste EIA Others PMC for 180 MLD Sewage Treatment Plant, Ahmedabad Gujarat Client Ahmedabad Municipal Corporation, Gujarat Contractor DNP Infrastructure Private Limited Project Cost INR 598 Millions Scheme JnNURM – Govt. Of Gujarat Status Completed Services Provided • Project Monitoring • Progress Review • Document Control & Management • Construction Supervision • Approval & Implementation of Quality Systems • Quality Audits • Material Inspections (Mechanical, Electrical, & Instrumentation) • Bill CertificationPMC
  45. 45. Water & Environment – Selected Projects (2)Water Supply Drainage Storm Water Solid Waste EIA Others PMC for 60 MLD Sewage Treatment Plant, Ahmedabad Gujarat Client Ahmedabad Municipal Corporation, Gujarat Contractor Sri Ram EPC Limited Project Cost INR 240 Millions Scheme JnNURM – Govt. Of Gujarat Status Completed Services Provided • Project Monitoring • Progress Review • Document Control & Management • Construction Supervision • Approval & Implementation of Quality Systems • Quality Audits • Material Inspections (Mechanical, Electrical, & Instrumentation) • Bill CertificationPMC
  46. 46. Water & Environment – Selected Projects (3)Water Supply Drainage Storm Water Solid Waste EIA Others PMC for 35 MLD Sewage Treatment Plant, Ahmedabad Gujarat Client Ahmedabad Municipal Corporation, Gujarat Contractor HydroAir Tectonics Pvt. Ltd. Project Cost INR 145 Millions Scheme JnNURM – Govt. Of Gujarat Status Completed Services Provided • Project Monitoring • Progress Review • Document Control & Management • Construction Supervision • Approval & Implementation of Quality Systems • Quality Audits • Material Inspections (Mechanical, Electrical, & Instrumentation) • Bill CertificationPMC
  47. 47. Water & Environment – Selected Projects (4)Water Supply Drainage Storm Water Solid Waste EIA Others PMC for 70 MLD Sewage Treatment Plant, AUDA, Ahmedabad Gujarat Client Ahmedabad Urban Development Authority, Gujarat Contractor Geo Millar – New Delhi Project Cost INR 287 Millions Scheme JnNURM – Govt. Of Gujarat Status Completed Services Provided • Project Monitoring • Progress Review • Document Control & Management • Construction Supervision • Approval & Implementation of Quality Systems • Quality Audits • Material Inspections (Mechanical, Electrical, & Instrumentation) • Bill CertificationPMC
  48. 48. Water & Environment – Selected Projects (5)Water Supply Drainage Storm Water Solid Waste EIA Others PMC for 240 MLD Sewage Treatment Plant, AUDA, Ahmedabad Gujarat Client Ahmedabad Urban Development Authority, Gujarat Contractor United Phosphorus Ltd. Project Cost INR 842 Millions Scheme JnNURM – Govt. Of Gujarat Status Completed Services Provided • Project Monitoring • Progress Review • Document Control & Management • Construction Supervision • Approval & Implementation of Quality Systems • Quality Audits • Material Inspections (Mechanical, Electrical, & Instrumentation) • Bill CertificationPMC
  49. 49. Water & Environment – Selected Projects (6)Water Supply Drainage Storm Water Solid Waste EIA Others PMC for Terminal Sewage Pumping Station 285 & 102 MLD, Ahmedabad, Gujarat Client Ahmedabad Urban Development Authority, Gujarat Contractor Kirloskar Brothers - Pune Project Cost INR 386 Millions Scheme JnNURM – Govt. Of Gujarat Status Work in Progress Services Provided • Project Monitoring • Progress Review • Document Control & Management • Construction Supervision • Approval & Implementation of Quality Systems • Quality Audits • Material Inspections (Mechanical, Electrical, & Instrumentation) • Bill CertificationPMC
  50. 50. Water & Environment – Selected Projects (7)Water Supply Drainage Storm Water Solid Waste EIA Others PMC for Sewerage Network – 50 Kms - Ahmedabad Client Ahmedabad Municipal Gujarat, Ahmedabad, Gujarat Contractor N. P. Patel & Co. Project Cost INR 128 Millions Scheme JnNURM – Govt. Of Gujarat Status Work in Progress Services Provided • Project Monitoring • P og ess Re ie Progress Review • Document Control & Management • Construction Supervision • Approval & Implementation of Quality Systems • Quality Audits • Material Inspections (Mechanical, Electrical, & Instrumentation) • Bill CertificationPMC
  51. 51. Water & Environment – Selected Projects (8) Water Supply Drainage Storm Water Solid Waste EIA Others DPR for Underground Drainage Scheme– Nadiad - Gujarat Client Gujarat Urban Development Mission, Gandhinagar, Gujarat Project Cost INR 1230 Millions Scheme Govt. of Gujarat Status Complete Services Provided • Route Survey & Base Map Preparation • Requirement planning • Feasibility & High Level Design • Detailed Design & Engineering • Specifications & Working Drawings • O&M Guidelines • Tender preparationDesign
  52. 52. Water & Environment – Selected Projects (9) Water Supply Drainage Storm Water Solid Waste EIA Others DPR for Underground Drainage Scheme– Kadi Town- Gujarat Client Gujarat Urban Development Mission, Gandhinagar, Gujarat Project Cost INR 230 Millions Scheme Govt. of Gujarat Status Complete Services Provided • Route Survey & Base Map Preparation • Requirement planning • Feasibility & High Level Design • Detailed Design & Engineering • Specifications & Working Drawings • O&M Guidelines • Tender preparationDesign
  53. 53. Water & Environment – Selected Projects (10) Water Supply Drainage Storm Water Solid Waste EIA Others DPR for Underground Drainage Scheme– Mehasana Town -Gujarat Client Gujarat Water Supply & Sewerage Board, Gandhinagar, Gujarat Project Cost INR 700 Millions Scheme Govt. of Gujarat Status Complete Services Provided • Route Survey & Base Map Preparation • Requirement planning • Feasibility & High Level Design • Detailed Design & Engineering • Specifications & Working Drawings • O&M Guidelines • Tender preparationDesign
  54. 54. Water & Environment – Selected Projects (11) Water Supply Drainage Storm Water Solid Waste EIA Others DPR for Underground Drainage Scheme– Unjha Town -Gujarat Client Gujarat Water Supply & Sewerage Board, Gandhinagar, Gujarat Project Cost INR 374.24 Millions Scheme Govt. of Gujarat Status Complete Services Provided • Route Survey & Base Map Preparation • Requirement planning • Feasibility & High Level Design • Detailed Design & Engineering • Specifications & Working Drawings • O&M Guidelines • Tender preparationDesign
  55. 55. Water & Environment – Selected Projects (12) Water Supply Drainage Storm Water Solid Waste EIA Others DPR for Underground Drainage Scheme– Limdi Town - Gujarat Client Gujarat Water Supply & Sewerage Board, Gandhinagar, Gujarat Project Cost INR 270.56 Millions Scheme Govt. of Gujarat Status Complete Services Provided • Route Survey & Base Map Preparation • Requirement planning • Feasibility & High Level Design • Detailed Design & Engineering • Specifications & Working Drawings • O&M Guidelines • Tender preparationDesign
  56. 56. Water & Environment – Selected Projects (13) Water Supply Drainage Storm Water Solid Waste EIA Others DPR for Underground Drainage Scheme–Bavla Town - Gujarat Client Gujarat Water Supply & Sewerage Board, Gandhinagar, Gujarat Project Cost INR 137.10 Millions Scheme Govt. of Gujarat Status Complete Services Provided • Route Survey & Base Map Preparation • Requirement planning • Feasibility & High Level Design • Detailed Design & Engineering • Specifications & Working Drawings • O&M Guidelines • Tender preparationDesign
  57. 57. Water & Environment – Selected Projects (14) Water Supply Drainage Storm Water Solid Waste EIA Others DPR for Underground Drainage Scheme–Virmgam Town -Gujarat Client Gujarat Water Supply & Sewerage Board, Gandhinagar, Gujarat Project Cost INR 172.59 Millions Scheme Govt. of Gujarat Status Complete Services Provided • Route Survey & Base Map Preparation • Requirement planning • Feasibility & High Level Design • Detailed Design & Engineering • Specifications & Working Drawings • O&M Guidelines • Tender preparationDesign
  58. 58. Water & Environment – Selected Projects (14) Water Supply Drainage Storm Water Solid Waste EIA Others DPR for Underground Drainage Scheme–Umargam Town -Gujarat Client Gujarat Water Supply & Sewerage Board, Gandhinagar, Gujarat Project Cost INR 160 Millions Scheme Govt. of Gujarat Status Complete Services Provided • Route Survey & Base Map Preparation • Requirement planning • Feasibility & High Level Design • Detailed Design & Engineering • Specifications & Working Drawings • O&M Guidelines • Tender preparationDesign
  59. 59. Water & EnvironmentWater Supply Drainage Storm Water Solid Waste EIA Others
  60. 60. Water & Environment – Selected Projects (1)Water Supply Drainage Storm Water Solid Waste EIA Others PMC for Storm Water Drainage– 36 Kms - Ahmedabad Client Ahmedabad Municipal Gujarat, Ahmedabad, Gujarat Contractor P. C. Snehal Construction Co. Project Cost INR 100 Millions Scheme JnNURM – Govt. Of Gujarat Status Work in Progress Services Provided • Project Monitoring • Progress Review • Document Control & Management • Construction Supervision • Approval & Implementation of Quality Systems • Quality Audits • Material Inspections (Mechanical, Electrical, & Instrumentation) • Bill CertificationPMC
  61. 61. Water & Environment – Selected Projects (2)Water Supply Drainage Storm Water Solid Waste EIA Others PMC for Storm Water Drainage– 55 Kms - Drainage Ahmedabad Client Ahmedabad Urban Development Authority, Gujarat Contractor M/s. Laxmi Construction Co. M/s. N. P. Patel & Co. M/s. Gujarat Laxmi MKSM Ltd. Project Cost INR 100 Millions Scheme JnNURM – Govt. Of Gujarat Status Work in Progress Services Provided • Project Monitoring • Progress Review • Document Control & Management • Construction Supervision • Approval & Implementation of Quality Systems • Quality Audits • Material Inspections (Mechanical, Electrical, & Instrumentation) • Bill CertificationPMC
  62. 62. Water & EnvironmentWater Supply Drainage Storm Water Solid Waste EIA Others
  63. 63. Water & Environment – Selected Projects (1) Water Supply Drainage Storm Water Solid Waste EIA Others DPR for Solid Waste Management System for Surat City, Gujarat under JnNURM Client Surat Municipal Corporation, Surat, Gujarat Project Cost INR 530 Millions Scheme JnNURM , Govt. of Gujarat Status Complete Services Provided • Stake Holder Consultation • Opinion Survey • Re ie of Existing System Review E isting S stem • Inventorying of existing assets • Feasibility Studies • Financial Details • Final DPRDesign
  64. 64. Water & Environment – Selected Projects (2) Water Supply Drainage Storm Water Solid Waste EIA Others DPR for Solid Waste Management System for Rajkot City, Gujarat under JnNURM Client Rajkot Municipal Corporation, Surat, Gujarat Project Cost INR 1500 Millions Scheme JnNURM , Govt. of Gujarat Status Complete Services Provided • Stake Holder Consultation • Opinion Survey • Re ie of Existing System Review E isting S stem • Inventorying of existing assets • Feasibility Studies • Financial Details • Final DPRDesign
  65. 65. Sectors2.2 Roads & Transportation
  66. 66. Roads & TransportationWith experience in delivering some of India’s recent major road projects including expressways, 6 lane statehighways, TP scheme roads, Industrial roads, etc., MaRS has the expertise to deliver major road projects. Our abilityto create a multidisciplinary team incorporating the environmental, water, civil and structural engineering elementstogether with social and community f h ih i l d i factors enables us to provide a complete service to our clients. bl id l i liWe use a wide range of the latest technical software for road and transportation infrastructure modeling with highly‐skilled and experienced staff.With the changing modalities of financing, design, execution, & operations of road and transportation infrastructureunder Public Private Partnership modules, we are fully geared up to become an integrated technical partner forprospective developers. Over last few years we have built a close professional relationship with most of the reputeddevelopers, who depend on our ability to help them successfully implement the projects. Requirement Planning Express Highways Survey & Investigations National & State Highways High Level design & Feasibilities Major District Roads Detailed Design & Engineering Bridges, Flyovers & Underpasses Tendering, BoQ, & Estimates i Q i Ring Roads Ri g R d Project Management & TPI work Other Specialized Requirements
  67. 67. Roads & Transportation – Selected Projects (1) PMC for Roads – GSRRDA – Kutch 740 Kms Client Gujarat State Rural Road Development Authority, Gandhinagar, Gujarat. JV Partner Stanley Consultants, USA Project Cost INR 980 Millions Scheme Govt. Of Gujarat Status Work in Progress Services Provided • Project Monitoring • Progress Review • Document Control & Management • Construction Supervision • Approval & Implementation of Quality Systems • Quality Audits • Material Inspections (Mechanical Electrical, & (Mechanical, Electrical Instrumentation) • Bill CertificationPMC
  68. 68. Roads & Transportation – Selected Projects (2) PMC for Roads – GSRRDA – Panchmahal 372 Kms Client Gujarat State Rural Road Development Authority, Gandhinagar, Gujarat. JV Partner Stanley Consultants, USA Project Cost INR 500 Millions Scheme Govt. Of Gujarat Status Work in Progress Services Provided • Project Monitoring • Progress Review • Document Control & Management • Construction Supervision • Approval & Implementation of Quality Systems • Quality Audits • Material Inspections (Mechanical Electrical, & (Mechanical, Electrical Instrumentation) • Bill CertificationPMC
  69. 69. Roads & Transportation – Selected Projects (3) PMC for Infrastructure Development – Industrial Estate – Mehasana Division Client Gujarat Industrial Development Corporation, Gujarat Contractor Natraj Construction Company Project Cost INR 376 Millions Scheme Govt. Of Gujarat Status Work in Progress Services Provided • Project Monitoring • Progress Review • Document Control & Management • Construction Supervision • Approval & Implementation of Quality Systems • Quality Audits • Material Inspections (Mechanical Electrical, & (Mechanical, Electrical Instrumentation) • Bill CertificationPMC
  70. 70. Roads & Transportation – Selected Projects (4) PMC for Infrastructure Development – Industrial Estate – Ahmedabad Division Client Gujarat Industrial Development Corporation, Gujarat Contractor M/s. Kalathia Engg Ltd. M/s. Kunal Structures (INDIA) P. Ltd. M/s. Natraj Construction Co. Project Cost INR 227 Millions Scheme Govt. Of Gujarat Status Work in Progress Services Provided • Project Monitoring • Progress Review • Document Control & Management • Construction Supervision • Approval & Implementation of Quality Systems • Quality Audits • Material Inspections (Mechanical, Electrical, & Instrumentation) • Bill CertificationPMC
  71. 71. Roads & Transportation – Selected Projects (5) PMC for Infrastructure Development – Industrial Estate – Tata Nano Sanand Client Gujarat Industrial Development Corporation, Gujarat Contractor M/s. Kalathia Engg Ltd. Project Cost INR 345 Millions Scheme Govt. Of Gujarat Status Work in Progress Services Provided • Project Monitoring • Progress Review • Document Control & Management • Construction Supervision • Approval & Implementation of Quality Systems • Quality Audits • Material Inspections (Mechanical Electrical, & (Mechanical, Electrical Instrumentation) • Bill CertificationPMC
  72. 72. Roads & Transportation – Selected Projects (6) PMC for Road Development – JADA - Jamnagar Client Jamnagar Area Development Authority, Jamnagar, Gujarat Contractor Project Cost INR 19 Millions Scheme Govt. Of Gujarat Status Completed Services Provided • Project Monitoring • Progress Review • Document Control & Management • Construction Supervision • Approval & Implementation of Quality Systems • Quality Audits • Material Inspections (Mechanical Electrical, & (Mechanical, Electrical Instrumentation) • Bill CertificationPMC
  73. 73. Roads & Transportation – Selected Projects (7) PMC for Road Development – GMB - Jamnagar Client Gujarat Maritime Board, Gandhinagar, Gujarat Contractor Project Cost INR 2.3 Millions Scheme Govt. Of Gujarat Status p Completed Services Provided • Project Monitoring • Progress Review • Document Control & Management • Construction Supervision • Approval & Implementation of Quality Systems • Quality Audits • Material Inspections (Mechanical, Electrical, & Instrumentation) • Bill CertificationPMC
  74. 74. Roads & Transportation – Selected Projects (8) DPR Preparation and PMC for Fly Over Bridge – Nr. Delhi Gate To Suraj Pole Chauraha Udaipur Chauraha, Client Urban Improvement Trust, Udaipur, Rajasthan Contractor Project Cost INR 330 Millions Scheme Govt. Of Rajasthan Status Completed Services Provided • Detailed Design & Engineering • Project Monitoring • Progress Review • Document Control & Management • Construction Supervision • Approval & Implementation of Quality Systems • Quality Audits • Material Inspections (Mechanical, Electrical, & Instrumentation) • Bill CertificationPMC Design
  75. 75. Roads & Transportation– Selected Projects (9) Infrastructure Upgradation At Gidc Estates (Cip Scheme) (Mahesana Billimora Chitra Dediyasan (Mahesana, Billimora, Chitra, Dediyasan, Visnagar, Kalol, Gundlav) Client Gujarat Industrial Development Corporation, Gandhinagar, Gandhinagar Gujarat Project Cost INR 766 Millions Scheme Govt. of Gujarat Status Complete Services Provided • Route Survey & Base Map Preparation • Requirement planning • Feasibility & High Level Design • Detailed Design & Engineering • Specifications & Working Drawings • O&M Guidelines • Tender preparationDesign
  76. 76. Sectors3.3 Buildings & Industries
  77. 77. Buildings & IndustriesMaRS Planning & Engineering provides engineering design and project management for all types of buildings andindustries, and can provide world class building engineering services, globally, with an impressive range of skills andresources. We have gained an outstanding reputation for our lateral thinking and elegant design solutions in manyaspects of b ildi engineering, i l di tall b ildi f building i i including ll buildings, sporting and l i i d leisure projects, airport terminals, education, j i i l d iMilitary Engineering Services and health facilities.With over 10 years of experience, the firm offers excellent technical expertise in all facets of building: from planning,design, construction management and supervision to resolving complex issues associated with building design. Thefirm offers survey works, geotechnical, civil and structural engineering disciplines for buildings, as well as experiencein areas such as facade engineering. The firm’s senior personnel take a hands‐on approach to developing projects,and team management while focusing on economy constructability functionality and sustainability We use a wide management, economy, constructability, sustainability.range of the latest technical software for buildings and industries modeling with highly‐skilled and experienced staff. Architectural Work Residential & Commercial Structural Engineering Townships Mechanical, Electrical & Plumbing Industrial Green Building Certifications Institutional Tendering, BoQ, & Estimates Mass Housing & EWS Project Management & TPI work SSA, RMSA & Other specialized works
  78. 78. Buildings & Industries– Selected Projects (1) Design, DPR & PMC for upcoming school Buildings under RMSA Karnatka RMSA, Client Rastrya Madhyamik Siksha Abhiyan, Bangalore, Karnataka Project Cost INR 2500 Millions Scheme Govt. of India Status Work In Progress Services Provided • Requirement planning • Conceptual Planning • Surveys and Investigations • Architectural Work • Structural Design • Mechanical, Electrical & Plumbing • Landscaping, etc • Working Drawings & Boqs • Tender Preparation • PMC ServicesDesign PMC
  79. 79. Buildings & Industries– Selected Projects (2) Design, DPR & PMC for upcoming school Buildings under Karnataka Residential Educational Educational. Institutions Society, Karnataka Client Karnataka Residential Educational. Institutions Society, Society Karnataka Project Cost INR 1200 Millions Scheme Karnataka Residential Educational. Institutions Society, Karnataka S i t K t k Status Work In Progress Services Provided • Requirement planning • Conceptual Planning • Surveys and Investigations • Architectural Work • Structural Design • M h i l El Mechanical, Electrical & Plumbing i l Pl bi • Landscaping, etc • Working Drawings & Boqs • Tender Preparation • PMC S i ServicesDesign PMC
  80. 80. Buildings & Industries– Selected Projects (3) Design, DPR & PMC for upcoming district hospital at Rajpipla, Rajpipla Gujarat Client Health Department, Gandhinagar, Gujarat Project Cost INR 200 Millions Scheme District Hospital, Gandhinagar, Gujarat Status Work In Progress Services Provided • Requirement planning • Conceptual Planning • Surveys and Investigations • Architectural Work • Structural Design • Mechanical, Electrical & Plumbing • Landscaping, etc • Working Drawings & Boqs • Tender Preparation • PMC Services Design PMC
  81. 81. Buildings & Industries– Selected Projects (4) Design, DPR & PMC for Alpha College of Engineering & Technology at Khatraj Ahmedabad Khatraj, Client Alpha College of Engineering & Technology at Khatraj, Ahmedabad Project Cost INR 37 Millions Scheme Alpha College of Engineering & Technology at Khatraj, Ahmedabad Status St t Completed C l t d Services Provided • Requirement planning • Conceptual Planning • Surveys and Investigations • Architectural Work • Structural Design • Mechanical, Electrical & Plumbing • Landscaping, etc • Working Drawings & Boqs • Tender Preparation • PMC Services Design PMC
  82. 82. Buildings & Industries– Selected Projects (5) Design, DPR & PMC for School Buildings for Nadiad Municipality Client Nadiad Municipality, Gujarat Project Cost INR 30.1 Millions Scheme Nadiad Municipality Status Completed Services Provided • Requirement planning • Conceptual Planning • Surveys and Investigations • Architectural Work • Structural Design • Mechanical, Electrical & Plumbing • Landscaping, etc • Working Drawings & Boqs • Tender Preparation • PMC Services Design PMC
  83. 83. Buildings & Industries– Selected Projects (6) PMC for EWS HOUSING THALTEJ & VASTRAL 220 : 4248 DU Client Ahmedabad Urban Development Authority, Ahmedabad, Gujarat. Contractor M. S. M S Khurana Engg Ltd Engg.Ltd. Project Cost INR 654 Millions Scheme JnNURM – Central Government Status Completed Services Provided • Project Monitoring • Progress Review • Document Control & Management • Construction Supervision • Approval & Implementation of Quality Systems • Quality Audits • Material Inspections (Mechanical, Electrical, & Instrumentation) • Bill CertificationPMC
  84. 84. Buildings & Industries– Selected Projects (7) PMC for EWS HOUSING VASTRAL 200 & 215 : 2240 DU Client Ahmedabad Urban Development Authority, Ahmedabad, Gujarat. Contractor Sintex Industries Ltd Ltd. Project Cost INR 388 Millions Scheme JnNURM – Central Government Status Completed Services Provided • Project Monitoring • Progress Review • Document Control & Management • Construction Supervision • Approval & Implementation of Quality Systems • Quality Audits • Material Inspections (Mechanical, Electrical, & Instrumentation) • Bill CertificationPMC
  85. 85. Buildings & Industries– Selected Projects (8) PMC for Integrated Housing Scheme Development Program – Bagasara – 1088 Du Client GUJARAT URBAN DEVELOPMENT MISSION, GANDHINAGAR, GUJARAT Contractor M/s. M/s Wild Life Saviour Trust M/s. ANSB Ltd. – Amreli Project Cost INR 166 Millions Scheme S h JnNURM Central Government J NURM – C t l G t Status Completed Services Provided • Project Monitoring • Progress Review • Document Control & Management • Construction Supervision • Approval & Implementation of Quality Systems • Quality Audits • Material Inspections (Mechanical, Electrical, & Instrumentation) • Bill CertificationPMC
  86. 86. Buildings & Industries– Selected Projects (9) PMC for Swaminarayan Gurukul Campus At Kanbha Client SWAMINARAYAN GURUKUL, KANBHA, AHMEDABAD, GUJARAT. Project Cost INR 108 Millions Scheme Swaminarayan Kanbha Trust Status Completed Services Provided • Project Monitoring • Progress Review • Document Control & Management • Construction Supervision • Approval & Implementation of Quality Systems • Quality Audits • Material Inspections (Mechanical, Electrical, & Instrumentation) • Bill CertificationPMC
  87. 87. Buildings & Industries– Selected Projects (10) PMC for Third Party Technical Supervision, Monitoring & Quality Assurance of Civil Works under SSAM Summary Sheet State Package Project Cost Karnataka Mysore Package 499.78 Million Belgaum Package 530.23 Million Gujarat SC – 14 & 20 385.16 Million SC – 22 176.40 Million SC – 33 & 40 171.04 Million SC – 56 114.74 Million SC – 65 & 72 408.55 408 55 Million WCA – 03 70.26 Million SC – 84 & 98 793.52 Million Maharashtra Mumbai Division 416.41 Million Haryana Rohtak 490.65 Million Chattisgarh Raipur 1073.26 Million PMC
  88. 88. Buildings & Industries– Selected Projects (11) Design and DPR for INTEGRATED HOUSING SLUM DEVELOPMENT (IHSDP) – GUDM - ODE TOWNSHIP Client GUJARAT URBAN DEVELOPMENT MISSION, GANDHINAGAR, GUJARAT Project Cost INR 127 Millions Scheme Govt. Of Gujarat Status Completed Services Provided • Requirement planning • Conceptual Planning • Surveys and Investigations • Architectural Work • Structural Design • Mechanical, Electrical & Plumbing • Landscaping, etc • Working Drawings & Boqs • Tender Preparation • PMC Services Design
  89. 89. Buildings & Industries– Selected Projects (12) Design, DPR & PMC for Integrated Housing Slum Development (Ihsdp) – Gudm - Unjha Township Client GUJARAT URBAN DEVELOPMENT MISSION, GANDHINAGAR, GUJARAT Project Cost INR 87 Millions Scheme Govt. Of Gujarat Status Completed Services Provided • Requirement planning • Conceptual Planning • Surveys and Investigations • Architectural Work • Structural Design • Mechanical, Electrical & Plumbing • Landscaping, etc • Working Drawings & Boqs • Tender Preparation • PMC Services Design PMC
  90. 90. Buildings & Industries– Selected Projects (13) PMC for Indo German Tool Room, Ahmedabad For Construction Work After The Earthquake Client Indo German Toll Room, Ahmedabad Project Cost INR 48 Millions Scheme Indo German Toll Room, Ahmedabad Status Completed Services Provided • Project Monitoring • Progress Review • Document Control & Management • Construction Supervision • Approval & Implementation of Quality Systems • Quality Audits • Material Inspections (Mechanical, Electrical, & Instrumentation) • Bill CertificationPMC
  91. 91. Buildings & Industries– Selected Projects (14) PMC for Construction Of New Building Of Gujarat Samachar Press Surat Press, Client Gujarat Samachar Press, Surat Project Cost INR 65 Millions Scheme Gujarat Samachar Press, Surat Status Completed Services Provided • Project Monitoring • Progress Review • Document Control & Management • Construction Supervision • Approval & Implementation of Quality Systems • Quality Audits • Material Inspections (Mechanical, Electrical, & Instrumentation) • Bill CertificationPMC
  92. 92. Buildings & Industries– Selected Projects (12) Design, DPR & PMC for APOLLO INFRATECH PVT. LTD Client APOLLO INFRATECH PVT. LTD., CHATRAL, GUJARAT. Project Cost INR 80 Millions Status Completed Services Provided • Requirement planning • Conceptual Planning • Surveys and Investigations • Architectural Work • Structural Design St uctu a es g • Mechanical, Electrical & Plumbing • Landscaping, etc • Working Drawings & Boqs • Tender Preparation p • PMC Services Design PMC
  93. 93. Sectors4.4 Urban & Regional Planning
  94. 94. Urban & Regional PlanningNo matter how large or small is a community, spatial design programs such as parcels, zoning, land use,addresses, transportation networks, and housing stock need to be properly designed and administered bythe urban and local bodies. ULBs also monitor multiple urban and regional indicators, forecast futurecommunity needs, and plan accordingly to help improve the quality of life in their community.In order to address the challenges of urban and regional planning, we employ an integrated team approachto urban, rural and regional planning for both public and private sector initiatives. Working closely with ourclient and our land development, municipal infrastructure and architectural groups, we rigorously assessexisting land uses, development options, planning policies and rationales, local sensitivities, economicconstraints, public input and regulatory standards to formulate the optimum development solution. We ,p p g y p puse a wide range of the latest technical software for urban & regional plan modeling with highly‐skilled andexperienced staff. Requirement Planning City Development Plans Survey & Investigations Rural Development Plans High Level design & Feasibilities Town Planning Schemes Detailed Design & Engineering Establishment of Townships Tendering, BoQ, & Estimates g, Q, Property Development Advice p y p Project Management & TPI work Rezoning & Consolidation of lands
  95. 95. Urban & Regional Planning– Selected Projects (1) Preparation of Town Planning Scheme for Surat area TP 42 & 43 , Bhimrad TP 26 Abhava Client Surat Urban Development Authority, Gujarat Project Cost NA Scheme Govt. of Gujarat Status Complete Services Provided Land Survey, Counter Survey with latest equipments like total stations, Measurement and Matching of land, Preparation of Base Map and Area Statement on the basis of measurement and matching of land Development, Urban Planning, Regional Planning, Preparation of Draft Town Planning Scheme showing roads, percentage of land to acquired and other utilities services, Preparation of development plan, Demarcation of Final plots after getting approval of Town Planning scheme from the final authority.Design
  96. 96. Urban & Regional Planning– Selected Projects (2) Preparation of Town Planning Scheme No. 3, 4 & 5 for Mehsana Nagar Palika Palika. Client Mehasan Nagarpalika Project Cost NA Scheme Govt. of Gujarat Status Complete Services Provided Land Survey, Counter Survey with latest equipments like total stations, Measurement and Matching of land, Preparation of Base Map and Area Statement on the basis of measurement and matching of land Development, Urban Planning, Regional Planning, Preparation of Draft Town Planning Scheme showing roads, percentage of land to acquired and other utilities services, Preparation of development plan, Demarcation of Final plots after getting approval of Town Planning scheme from the final authority.Design
  97. 97. Urban & Regional Planning– Selected Projects (3) Preparation of Town Planning for Dhangadhara Nagar Palika. Palika Client Dhangadhara Nagar Palika. Project Cost NA Scheme Govt. of Gujarat Status Complete Services Provided Land Survey, Counter Survey with latest equipments like total stations, Measurement and Matching of land, Preparation of Base Map and Area Statement on the basis of measurement and matching of land Development, Urban Planning, Regional Planning, Preparation of Draft Town Planning Scheme showing roads, percentage of land to acquired and other utilities services, Preparation of development plan, Demarcation of Final plots after getting approval of Town Planning scheme from the final authority.Design
  98. 98. Urban & Regional Planning– Selected Projects (4) City Development Plan for 7 cities in Madhya Pradesh, Pradesh India Client Directorate of Urban Administration & Development, Madhya Pradesh Project Cost NA Status In Progress Services Provided • In-depth analysis of the existing situation, covering the demographic, economic, fi d hi i financial, i f i l infrastructure, physical, environmental and institutional aspects • Development of a perspective and a vision of the city • Formulating a strategy for bridging the gap between where the city is and where it wishes to go y g • Preparing a City Investment Plan (CIP) and a financing strategyDesign
  99. 99. Sectors5. Testing & Investigations
  100. 100. Testing & InvestigationsMaRS, through its sister concern MaRS Enviro Research and Engineering Services Private Limited, based inAhmedabad, Gujarat, offer an independent material testing and consultancy service to clients in theconstruction industry. Construction Materials Engineering and Testing is a critical component in the processof taking a structure off the blueprint and making it a reality. Our clients have come to depend on MaRS’smaterials engineering and testing staff of professionals to protect their interests during the final design andthe construction phases of their projects. MaRS maintains multi‐faceted modern materials testinglaboratories, equipped with testing equipment such as compression testing machine, marshal’s stabilitytesting machine, strength and compaction devices, sieves, scales, ovens, classification stations, molds, andother equipment necessary to provide results for all types of testing for cement, concrete, asphalt, soil,steel, etc. Our team of engineers and engineering technicians h l our clients anticipate and minimize l f d h help l dpotential issues and delays. On Site & Lab Based Geotechnical Works QA & QC Building Materials Testing Development of Quality M D l t f Q lit Manuals l Pavement M t i l Testing P t Material T ti g Third Party inspections Mechanical & Machineries Damage Assessment Electricals & Equipments Non Destructive Testing Environmental Impacts Testing
  101. 101. Mechanical Testing HSC-CF PUMPS VERTICAL TURBINE PUMPS SUBMERSIBLE PUMPS SUBMERGED C.F. PUMPS TUBE WELL SUBMERSIBLE PUMPS MONO SUBMERSIBLE PUMPS E.O.T. CRANES ELECTROMAGNETIC FLOW METERS BUTTERFLY VALVES NON RETURN VALVES SLUICE VALVES AIR VALVES SLUICE GATES EXPANSION BELLOWS AIR BLOWERS CHLORINATION SYSTEMS CLARIFIER BRIDGES
  102. 102. ELECTRICAL & INSTRUMENTATION EQUIPMENTS TRANSFORMERS SWITCH GEAR CONTROL PANELS CAPACITOR BANK WITH CONTROL PANELS MCC CONTROL PANELS SOFT STARTER CONTROL PANEL PLC BASED INSTRUMENT CONTROL PANEL APFC CONTROL PANEL PCC CONTROL PANEL DOL/STAR-DELTA/ATS CONTROL PANELS H.T. AND L.T. MOTORS H.T. H T CABLES STREET LIGHT POLES AND ACCESSORIES LIGHTING FIXTURES EARTHING
  103. 103. PIPES AND SPECIALS: ( RANGING FROM 150MM TO 2000MM DIA.) MILD STEEL PIPES DUCTILE IRON PIPES CAST IRON PIPES PVC PIPES H D P E PIPES GLASS FIBRE REINFORCED PIPES REINFORCED CEMENT CONCRETE PIPES
  104. 104. Survey Equipments Sr. No. Name of the equipments Nos. 01 Total Station (Leica 407 & Set1010) 2 02 Theodolites 2 03 Dumpy Levels 4 04 Automatic l l A t ti level 4 05 Prismatic compass 4 06 Tangent clinometers 4 07 Plane table with accessories 5 08 Ranging rod 50 09 Leveling staff 25 10 Magnetic Compass 8 11 Staves, Ranging Rod etc. 15 12 Plannimeter. 4 13 Curvimeter 4 14 Digital stop watch 2 15 Metallic tapes 10
  105. 105. Sectors6. Facility Management
  106. 106. Facility ManagementFacilities Management is a profession that encompasses multiple disciplines to ensure functionality of thebuilt environment by integrating people, places, processes and technology. The discipline of facilitymanagement and the role of facility managers in particular are evolving to the extent that many managershave to operate at two levels: strategic‐tactical and operational. In the former case, owners need to beinformed about the potential impact of their decisions on the provision of space and services. In the latter,it is the role of a facility manager to ensure proper operation of all aspects of a building to create anoptimal, safe and cost effective environment for the occupants to function.Our portfolio of services includes Engineering Services, Electro Mechanical, HVAC, Water Management,Waste management, Pest Control, Staffing Solutions and more. The services are offered individually or g , , g yintegrated to provide Total Facility Management Solutions. Whatever be the option, our services arealways tailored to suit your business needs. Under the Facility Management sector, MaRS provides services, specific to the following types. •Hard Services ‐ Mechanical, Electrical, Plumbing, etc. •Soft Services – Cleaning Pest Control Landscaping Waste Management etc Soft Services – Cleaning, Pest Control, Landscaping, Waste Management, etc. •Risk Management Services – Safety & Security, Insurance, Disaster Management, etc. •Administrative Services – Parking management, Mail Management, Tenant Owner Relations, etc. •Other facility management related Services