5e consulting method statement for project financing

820 views
687 views

Published on

Published in: Business
0 Comments
2 Likes
Statistics
Notes
  • Be the first to comment

No Downloads
Views
Total views
820
On SlideShare
0
From Embeds
0
Number of Embeds
5
Actions
Shares
0
Downloads
12
Comments
0
Likes
2
Embeds 0
No embeds

No notes for slide

5e consulting method statement for project financing

  1. 1. h elping e xecute your p rojects 5e Consulting Approach & Methodology For Project Financing – Infrastructure Projects www.5econsulting.in 5E Consulting, india, ahmedabad, sourabh agarwal, readesign, architecture, project management, sustainabilityl estate, Project Feasibility, Research, Technology and system, Economic commercial, Legal, green building, leed, griha, sustainability, Swapnil anil, real estate demand assessment, Ahmedabad, ranchi, cept, nicmar, energy star rating, interior design, earned value management, pert, cpm, Microsoft project, primavera, material management, multiplex, truck terminal, amusement park, bridge, building, park, garden, bus stop, viability study, planning, infrastructure, environment, usgbc, igbc, teri, leed ap, housing, construction, contractor, sbst, school of building science and technology, flyover, industrial shead, shed, water harvesting, heat island effect, third party inspection, telecom towers, eoi, rfp, storm water management, energy modeling, renewable energy, carbon credits, 5e, five elements, five e, 5, e, consultants, consultancy, consulting, rainwater harvesting, solar energy, wind energy, green power, green e, construction activity pollution prevention, fsi, saleable area, gicea, carpet area, builtup built-up, area super builtup mckinsey plants reuse recycling resource reduction Rajkot solid waste management ocean villa resort cottage tourism tourists survey opinion survey cvc classified volume count mdf agrifibre board rfp eoi tender estimation quantity survey hvac air conditioning power albedo aquifer architectural architect performance index performance monitoring dashboard basis of design commissioning report agent biofuel vermin-composting vermin composting waste to energy blackwater brownfield vc pe funding venture capital private equity bankable feasibility reports document power point excel ms project leed rating platinum certified 1so 9000 14001 automation density carbon dioxide climate change rainfall flood commissioning authority Inddor environmental quality air quality controls factor End-to-End Integrated Solution Provider linking the entire value chains from Planning & Architecture to Engineering/Design to Project Management across various sectors: Core Infrastructure, Urban Services, Public Health Eng, Transportation and Value Added/ Themed based/ Integrated Development. premier design engineering and consultancy organization Budget Business Process ModelingTransportation
  2. 2. Financing Options for Water Supply Project Derive Project Need (Incl. PPP ) 1 Conduct Technical Feasibility 2 Conduct Financial Feasibility 3 Derive Capital Investment Requirement (CAPEX) a Derive Ongoing Revenue Sources b Derive Ongoing Operational Expenditure (OPEX) c Draw Profit & Loss Statement d Draw IRR, Equity IRR, Payback period, etc. d Derive Contribution Break up e Is Project Self Sustainable Scan Available Grant Schemes 4 Can a component be funded by grants Rework No No Deduct Grant Component & Rework Financial Feasibility 5 Yes Derive Equity Component 6 Yes <ul><li>Seek funding from the equity holders – Industries, ULB, Others. </li></ul><ul><li>Form SPV as a holding company to manage project and operations </li></ul><ul><li>Debt obligation to be taken care by the SPV </li></ul>Derive Debt Component 7 Prepare DPR a Approach Banks, Institutions b IDFC, World Bank, ADB, Infra Financing Companies Present proposition & Seek Funding c Propose refinancing opts to lead banker d Funds Cleared Rework No Go

×