Your SlideShare is downloading. ×
Portfolio
Upcoming SlideShare
Loading in...5
×

Thanks for flagging this SlideShare!

Oops! An error has occurred.

×
Saving this for later? Get the SlideShare app to save on your phone or tablet. Read anywhere, anytime – even offline.
Text the download link to your phone
Standard text messaging rates apply

Portfolio

390

Published on

Published in: Business, Technology
0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total Views
390
On Slideshare
0
From Embeds
0
Number of Embeds
1
Actions
Shares
0
Downloads
0
Comments
0
Likes
0
Embeds 0
No embeds

Report content
Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
No notes for slide

Transcript

  • 1. Maureen J. Soules, CIDPortfolio Submission Portfolio Index • Introduction PageUniversity of Minnesota • United Health Group – San Francisco, CA: Four Floor Re-StackCollege of Design – Slide 2 This project consisted of reconfiguring four floors in a high-rise office building in downtown San Francisco while remaining occupied. EachInterior Design Track – Slide 3 floor plate was 12,500 SF and the total number of employees involved – Slide 4 was 800. – Slide 5Application for Fall 2011 Term – Slide 6 • United Health Group – Phoenix, AZ: Three Floor Re-Stack – Slide 7 This project consisted of reconfiguring three floors in a call center office – Slide 8 building in downtown Phoenix while remaining occupied. Each floor – Slide 9 plate was 23,500 SF and the total number of employees involved was – Slide 10 over 1,000. • Utility Engineering– Minneapolis, MN: Furniture Installation Plans – Slide 11 This project was a new tenant build out. The furniture coordination plans – Slide 12 were incorporated into the A&E Construction Documents. This project – Slide 13 was completed in two phases within a 12-month period. – Slide 14 – Slide 15 • Royal Bank Of Canada: Phased Office Reconfiguration – Slide 16 This project was a Partial Reconfiguration of an occupied office. It was – Slide 17 completed in four phases to minimize the need for new furniture. • Royal Bank Of Canada – Seattle, WA: Furniture Installation – Slide 18 This project was a new tenant build out. The furniture coordination plans – Slide 19 were incorporated into the A&E Construction Documents. • Fluid Interiors – Minneapolis, MN: Showroom RenderingsDate Submitted: January, 2011 – Slide 20 This project was developed for a rendering competition. The photograph show the existing conditions and the renderings show the proposed furniture plans. This rendering won 1st place of 22 entries
  • 2. United Health Group/SCS: San Francisco Office – Four Floor Re-StackUniversity of MinnesotaCollege of DesignInterior Design TrackApplication for Fall 2011 TermDate Submitted: January, 2011SHEET INDEXGI101 Cover SheetGI102 OTI ChecklistGI103 Level 1B Parking PlanGI104 Level 2B Parking Plan January, 2011 Maureen Soules, CID: Portfolio Submission 2
  • 3. United Health Group/SCS: San Francisco Office – Four Floor Re-StackUniversity of MinnesotaCollege of DesignInterior Design TrackApplication for Fall 2011 TermDate Submitted: January, 2011SHEET INDEXGI127 Level 27 Path Of Travel PlanGI227 Plaza Level Path Of Travel Plan Elevations and DetailsRR127 Restroom Plans and Details January, 2011 Maureen Soules, CID: Portfolio Submission 3
  • 4. United Health Group/SCS: San Francisco Office – Four Floor Re-StackUniversity of MinnesotaCollege of DesignInterior Design TrackApplication for Fall 2011 TermDate Submitted: January, 2011SHEET INDEXGI201 General NotesGI301 SpecificationsGI302 SpecificationsGI303 Specifications January, 2011 Maureen Soules, CID: Portfolio Submission 4
  • 5. United Health Group/SCS: San Francisco Office – Four Floor Re-StackUniversity of MinnesotaCollege of DesignInterior Design TrackApplication for Fall 2011 TermDate Submitted: January, 2011SHEET INDEXAE127 Architectural Floor PlanAE202 Wall Types, Sections and DetailsAE601 Door Schedule and HardwareAE727 Reflected Ceiling Plan January, 2011 Maureen Soules, CID: Portfolio Submission 5
  • 6. United Health Group/SCS: San Francisco Office – Four Floor Re-StackUniversity of MinnesotaCollege of DesignInterior Design TrackApplication for Fall 2011 TermDate Submitted: January, 2011SHEET INDEXAF127 Finish PlanAF427 Enlarged Finish PlanAT127 Power and Voice / Data Coordination PlanIE127 Furniture Coordination Plan January, 2011 Maureen Soules, CID: Portfolio Submission 6
  • 7. United Health Group: Phoenix Office –Three Floor Re-Stack Elevation Details Main Circulation Accent WallsLower LevelMain LevelUpper Level January, 2011 Maureen Soules, CID: Portfolio Submission 7
  • 8. United Health Group: Phoenix Office –Three Floor Re-Stack Carpet Accents Full Floor PlansLower LevelMain LevelUpper Level January, 2011 Maureen Soules, CID: Portfolio Submission 8
  • 9. United Health Group: Phoenix Office –Three Floor Re-Stack Carpet Accents Detail PlansLower LevelMain LevelUpper Level January, 2011 Maureen Soules, CID: Portfolio Submission 9
  • 10. United Health Group: Phoenix Office –Three Floor Re-Stack Final Plan Of Record Adjacency Plan By DepartmentLower LevelMain LevelUpper Level January, 2011 Maureen Soules, CID: Portfolio Submission 10
  • 11. Utility Engineering: New Furniture Plans Furniture Installation Phased Plans • Phase 1 Overall Plan • Phase 2 Panel Plan and Component PlanJanuary, 2011 Maureen Soules, CID: Portfolio Submission 11
  • 12. Utility Engineering: New Furniture Plans As Built Furniture Installation Plans • Panel and Electrical Plan • Worksurface and Support Plan • Internal Component PlanJanuary, 2011 Maureen Soules, CID: Portfolio Submission 12
  • 13. Utility Engineering: New Furniture PlansFurniture DetailsPrivate Office PlanPrivate Office ElevationPrivate Office RenderingWorkstation PlansWorkstation Details January, 2011 Maureen Soules, CID: Portfolio Submission 13
  • 14. Utility Engineering: New Furniture Plans Furniture PhotosJanuary, 2011 Maureen Soules, CID: Portfolio Submission 14
  • 15. Utility Engineering: New Furniture PlansRenderedFurnitureDetails January, 2011 Maureen Soules, CID: Portfolio Submission 15
  • 16. Royal Bank Of Canada: Phased Office Reconfiguration Phased Furniture Plan Existing Furniture Plan Proposed Furniture PlanJanuary, 2011 Maureen Soules, CID: Portfolio Submission 16
  • 17. Royal Bank Of Canada: Phased Office Reconfiguration Phased Furniture Plans Phase 1 Phase 2 Phase 3 Phase 4January, 2011 Maureen Soules, CID: Portfolio Submission 17
  • 18. Royal Bank Of Canada – Seattle, WA: Furniture Installation Plans Furniture Installation Plans Sheet 1: 35th Floor – Furniture Coordination Plan Sheet 2: 36th Floor – Furniture Coordination PlanJanuary, 2011 Maureen Soules, CID: Portfolio Submission 18
  • 19. Royal Bank Of Canada – Seattle, WA: Furniture Installation Plans Furniture Installation Photos 36th Floor: Lounge Area 36th Floor: Board Room 36th Floor: Private Office Typical 35th Floor: Workstation Typical 35th Floor: Workstation Typical 35th Floor: Workstation TypicalJanuary, 2011 Maureen Soules, CID: Portfolio Submission 19
  • 20. Fluid Interiors Showroom: Rendering Competition – First Place Rendering 1: South Proposed Front Showroom Photo 2: East Existing Front Showroom Rendering 2: East Proposed Front ShowroomJanuary, 2011 Maureen Soules, CID: Portfolio Submission 20

×