Film Production Risk AssessmentSCENE/LOCATION:           Scene 1 - CorridorHAZARD:                   Wires loose          ...
Upcoming SlideShare
Loading in …5
×

Film production risk_assessment_2_ig5_

181 views

Published on

0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total views
181
On SlideShare
0
From Embeds
0
Number of Embeds
2
Actions
Shares
0
Downloads
1
Comments
0
Likes
0
Embeds 0
No embeds

No notes for slide

Film production risk_assessment_2_ig5_

  1. 1. Film Production Risk AssessmentSCENE/LOCATION: Scene 1 - CorridorHAZARD: Wires loose PublicRISK RATING (1 = Low 3 2Risk, 5 = Mass Effect):Action to avoid: Tape all wires to floor Make all people aware filming in taking placeSCENE/LOCATION: Scene 2 – CorridorHAZARD: Door (trapped fingers, Crowds etc)RISK RATING (1 = Low 2 2Risk, 5 = Mass Effect):Action to avoid: Put a sign on the door Keep plenty of room to indicate when available filmingSCENE/LOCATION: Scene 2 – CorridorHAZARD: Hospital EquipmentRISK RATING (1 = Low 2Risk, 5 = Mass Effect):Action to avoid: Ensure equipment is kept away and safeSCENE/LOCATION: Scene 3-CarHAZARD: Hit by a carRISK RATING (1 = Low 5Risk, 5 = Mass Effect):Action to avoid: Be aware of road users outside hospital

×