Time Management by Sondra Minnich
Upcoming SlideShare
Loading in...5
×
 

Time Management by Sondra Minnich

on

  • 399 views

Time Management project

Time Management project

Statistics

Views

Total Views
399
Views on SlideShare
397
Embed Views
2

Actions

Likes
0
Downloads
20
Comments
0

1 Embed 2

http://192.168.6.179 2

Accessibility

Categories

Upload Details

Uploaded via as Microsoft PowerPoint

Usage Rights

© All Rights Reserved

Report content

Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
  • Full Name Full Name Comment goes here.
    Are you sure you want to
    Your message goes here
    Processing…
Post Comment
Edit your comment

    Time Management by Sondra Minnich Time Management by Sondra Minnich Presentation Transcript

    • Time Management Sondra Minnich
    • Table of Contents O Introduction O Day 1: • Activities by quadrant • Graph of time management breakdown O Day 2: • Activities by quadrant • Graph of time management breakdown O Conclusion: • Strengths, Weakness and How I Can Improve
    • Introduction O This project was made to discover how I manage my time O I recorded all of my activities over 2 days O Once recorded, I categorized each activity using the time management matrix O Matrix parts are as follows: I- Important and Urgent II- Unimportant and Not Urgent III- Unimportant and Urgent IV- Unimportant and Not Urgent
    • Day 1 (By Quadrant) Urgent Not Urgent Important -Laundry -Sleep -Studied -Breakfast with friends -Dinner with friends -Played guitar -Skype with family Not Important -Quality time with friends -None
    • Time Management Over 24 Hours (day 1) Quadrant I Quadrant II Quadrant III Quadrant IV • It is evident that I spent the day completing important tasks • This was a Friday and on Fridays, I enjoy getting my chores done before the weekend begins • I did not waste a single minute of this day, due to Quadrant IV being empty
    • Day 2 (By Quadrant) Urgent Not Urgent Important -Skyped to discuss travel plans -Breakfast with friends -Studied -Played guitar Not Important -Spent time with friends -Napped
    • Time Management over 24 hours (day 2) Quadrant I Quadrant II Quadrant III Quadrant IV • This day was spent doing things that were not necessarily important or serious • This was a Saturday, which is why there was a lot of wasted time • I spent most of this day with friends • I did not have many important and urgent tasks • I had numerous amounts of unimportant tasks
    • Strengths O When there needs to be tasks completed, I focus easily O Fridays are the day I dedicate to Quadrant I O When I have a high rate of Quadrant I tasks, I generally have very little Quadrant IV tasks O I am able to focus on what’s most important when it is urgent fairly successfully
    • Weaknesses O If I don’t have any goals set, I waste the time that I have O It is tough to set and complete Quadrant I tasks on weekends O I spend a lot of time with friends, but not enough time for myself and my hobbies
    • How Can I Improve? O Set more Quadrant 1 goals for weekends O Find a better balance between friends and personal time O Use weekends to balance out each quadrant O Do not let Quadrant III be the largest quadrant on a regular basis