Your SlideShare is downloading. ×

Requirements engineering challenges

770

Published on

Discusses some of the problems of requirements engineering

Discusses some of the problems of requirements engineering

Published in: Business, Technology
0 Comments
4 Likes
Statistics
Notes
  • Be the first to comment

No Downloads
Views
Total Views
770
On Slideshare
0
From Embeds
0
Number of Embeds
1
Actions
Shares
0
Downloads
59
Comments
0
Likes
4
Embeds 0
No embeds

Report content
Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
No notes for slide

Transcript

  • 1. Requirements engineering challenges Ian Sommerville http://www.youtube.com/watch?v=bK-y0CaGkhU Requirements engineering challenges, 2013 Slide 1
  • 2. Fundamental reasons why establishing requirements for complex systems will always be a difficult technical and organisational problem Requirements engineering challenges, 2013 Slide 2
  • 3. • Changing requirements • Differing perspectives • Lack of standardization • People and politics Requirements engineering challenges, 2013 Slide 3
  • 4. Requirements change • System requirements reflect the world outside of the system. • As this is constantly changing then the requirements will inevitably also change • It is often difficult to understand the implications of changes for the requirements as a whole Requirements engineering challenges, 2013 Slide 4
  • 5. Types of change • Technology changes – New technologies may have to be incorporated into the system • Organisational changes – The business structure and organization may change Requirements engineering challenges, 2013 Slide 5
  • 6. Environmental changes • Market changes – The market for a system may change because of other systems introduced by competitors or changed customer expectations • Economic changes – The business may do better/worse than Requirements engineering challenges, 2013 Slide 6
  • 7. Political and legal changes • External events lead to a change in government policies or regulations • In critical systems – these may lead to requirements change Requirements engineering challenges, 2013 Slide 7
  • 8. Stakeholder perspectives Technical perspective Objects Functions Roles ... Social perspective Certification perspective User perspective Interactions Usability Requirements engineering challenges, 2013 The problem and the required system Customer perspective Management perspective Slide 8
  • 9. Requirements conflicts • Different perspectives are not consistent and different stakeholders will want different things from a system • It is inevitable that some requirements will be conflicting so that it is impossible to satisfy all stakeholder requirements without compromise Requirements engineering challenges, 2013 Slide 9
  • 10. Key stakeholders are busy • Developing detailed requirements for future systems often cannot be given a high priority by the senior people who will be affected by these requirements. Requirements engineering challenges, 2013 Slide 10
  • 11. • It is difficult to arrange meetings and stakeholders do not have time to think deeply about the system • They therefore express their requirements as vague, high-level descriptions, which have to be interpreted by engineers Requirements engineering challenges, 2013 Slide 11
  • 12. How good are the requirements? • There are no objective ways to compare alternative sets of requirements proposals to decide which are ‘better’ Requirements engineering challenges, 2013 Slide 12
  • 13. • The impact of a system on a business is very hard to understand in advance so therefore we cannot tell which might be the ‘best’ system for any particular business Requirements engineering challenges, 2013 Slide 13
  • 14. Quality improvement • A common approach to quality improvement is to develop an effective process then standardize that process • This means that all development then uses a proven approach • But this is very difficult for requirements engineering Requirements engineering challenges, 2013 Slide 14
  • 15. Process and product variability • The level of detail required in a requirements specification differs greatly depending on the type of product that is being developed • Specifications for different types of system may be expressed in completely different ways Requirements engineering challenges, 2013 Slide 15
  • 16. • A railway signalling system is a very detailed specification that can be validated by authorities outside of the organisation procuring the software • A computer game specification is a storyboard with pictures and examples Requirements engineering challenges, 2013 Slide 16
  • 17. Process variability • Different companies use completely different processes involving different types of people to derive these specifications • Scope for process standardisation and support is therefore limited Requirements engineering challenges, 2013 Slide 17
  • 18. Politics and people • Many system requirements are influenced by the politics in an organisation. • Decisions on requirements are not made on a rational basis but are made because of the personal goals of stakeholders Requirements engineering challenges, 2013 Slide 18
  • 19. • New systems are often introduced to give central management in an organization more control and to ensure that all parts of the organization work in the same way • But this may be resisted by stakeholders who use existing systems that are better suited to their ways of working Requirements engineering challenges, 2013 Slide 19
  • 20. • Requirements engineers may not understand the politics and, even when they do, they may not be able to challenge the ‘political’ requirements Requirements engineering challenges, 2013 Slide 20
  • 21. • People providing requirements for a system may not be convinced that the system is necessary or may feel that other systems should have a higher priority. • They may actively or passively refuse to cooperate in the requirements engineering process Requirements engineering challenges, 2013 Slide 21
  • 22. Summary • Requirements engineering is an inherently difficult process • Issues that contribute to this difficulty are – Changing requirements – Differing views of system stakeholders – Product and process variablity – The political nature of system requirements Requirements engineering challenges, 2013 Slide 22

×