Your SlideShare is downloading. ×
0
Ppt casablanca ie
Ppt casablanca ie
Ppt casablanca ie
Ppt casablanca ie
Ppt casablanca ie
Ppt casablanca ie
Ppt casablanca ie
Ppt casablanca ie
Ppt casablanca ie
Ppt casablanca ie
Upcoming SlideShare
Loading in...5
×

Thanks for flagging this SlideShare!

Oops! An error has occurred.

×
Saving this for later? Get the SlideShare app to save on your phone or tablet. Read anywhere, anytime – even offline.
Text the download link to your phone
Standard text messaging rates apply

Ppt casablanca ie

66

Published on

0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total Views
66
On Slideshare
0
From Embeds
0
Number of Embeds
0
Actions
Shares
0
Downloads
0
Comments
0
Likes
0
Embeds 0
No embeds

Report content
Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
No notes for slide

Transcript

  • 1. Oudini Sofia
  • 2. Megalopolis of 4MEconomic inhabitantscapital of1 615 km² Ecological stakesSustainability?
  • 3. Development of an area…… without damagingthe environmental, social and economical conditions.
  • 4. Water and atmosphere are contaminated…
  • 5. Petrochemicalindustries producingmore sulfate thanthe maximumauthorized
  • 6. Lack of education oriented to environment protection…
  • 7.  In the streets… In the shantytowns In the green spaces…
  • 8.  Excess of CO2 emissors through old cars lacking of maintenance Only 1 tramway to try to reduce private transport.
  • 9. Implementation of new policies: More civical education at school and administrations Bioindustry, greenfield Replant the Bouskoura forest Multiply tramway lines Taxing city center access Develop pedestrian street Installation plan of new trash cans

×