Your SlideShare is downloading. ×
Ppt casablanca ie
Upcoming SlideShare
Loading in...5
×

Thanks for flagging this SlideShare!

Oops! An error has occurred.

×

Introducing the official SlideShare app

Stunning, full-screen experience for iPhone and Android

Text the download link to your phone

Standard text messaging rates apply

Ppt casablanca ie

59
views

Published on


0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total Views
59
On Slideshare
0
From Embeds
0
Number of Embeds
0
Actions
Shares
0
Downloads
0
Comments
0
Likes
0
Embeds 0
No embeds

Report content
Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
No notes for slide

Transcript

  • 1. Oudini Sofia
  • 2. Megalopolis of 4MEconomic inhabitantscapital of1 615 km² Ecological stakesSustainability?
  • 3. Development of an area…… without damagingthe environmental, social and economical conditions.
  • 4. Water and atmosphere are contaminated…
  • 5. Petrochemicalindustries producingmore sulfate thanthe maximumauthorized
  • 6. Lack of education oriented to environment protection…
  • 7.  In the streets… In the shantytowns In the green spaces…
  • 8.  Excess of CO2 emissors through old cars lacking of maintenance Only 1 tramway to try to reduce private transport.
  • 9. Implementation of new policies: More civical education at school and administrations Bioindustry, greenfield Replant the Bouskoura forest Multiply tramway lines Taxing city center access Develop pedestrian street Installation plan of new trash cans