Your SlideShare is downloading. ×
W.b 08. 04.13
W.b 08. 04.13
W.b 08. 04.13
Upcoming SlideShare
Loading in...5
×

Thanks for flagging this SlideShare!

Oops! An error has occurred.

×
Saving this for later? Get the SlideShare app to save on your phone or tablet. Read anywhere, anytime – even offline.
Text the download link to your phone
Standard text messaging rates apply
0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total Views
42
On Slideshare
0
From Embeds
0
Number of Embeds
2
Actions
Shares
0
Downloads
0
Comments
0
Likes
0
Embeds 0
No embeds

Report content
Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
No notes for slide

Transcript

  • 1. BTEC Extended Diploma in Creative Media ProductionIG4 Final Major ProjectProduction DiaryPROGRESS UPDATE PLAN FOR NEXT MONTH / WEEK(Including Possible ContingencyPlans If Problems Anticipated)Mon W/B 14/01/13(Detailed Weekly Summary)Today was the first lesson we had when we was given thisproject so I had to start thinking and deciding what type ofproject I wanted to do. I decided that I would make aCelebrity, Beauty and Fashion magazine for older teenagefemales. So now that I have come up with my initial idea Ihave begun filling in my time management timeline as Iknow exactly what things I will need to do for: research,pre-production, production and post-production.I plan to have this time management task completed anduploaded to my blog by next week. Then I will began the pieceof work I said I would do next on my time managementschedule which is part of my market research – I will be lookingat magazines with the same genre as me and target audience tofind the magazines that influence me then I will put them into aPowerPoint.Mon W/B 21/01/13(Detailed Weekly Summary)I have started doing this PowerPoint and I am now half waythrough it I have included pictures of the magazine – thecover contents page, double page spreads and images theyuse throughout the magazine and said what images I planto use for mine and gave information about the magazinesthat influence me.I just need to add a few more slides to this and it will be donehopefully by the end of this week if not the end of next week’sfirst lesson so I am ready to do something else for next weekwhich will be writing my project proposal.Mon W/B 28/01/13(Detailed Weekly Summary)I did plan to have my Influences PowerPoint finished bynow however I have not yet managed to do this but this isbecause my project proposal needed to be completedearlier than I thought so as the proposal had to becompleted first I did that instead and uploaded it to myblog.I have now completed my PowerPoint and uploaded it to myblog. Now for the rest of the week I will be carrying on with mypre-production where I will be finding images of pages, frontcovers and contents pages of Teen Vogue magazine as that ismy main magazine inspiration and then with these I will becreating a mood board to show what I am going for with myown magazine.Mon W/B 04/02/13(Detailed Weekly Summary)Today I began looking at all other magazines with the samegenre of my magazine and gathered images of all the onesthat I liked and put them into a mood board and then fromthese I picked my favourite and created a separate moodboard using just images from the magazine that influencedme the most.I have created the two mood boards that I planned to do thisweek and have uploaded them both to my blog. Next week isour week off so I am going to book out a camera and during thisweek off take most of the images for my magazine as up to nowI have 1 model. I will need quite a few more people however as Iam only using one person for my front cover this will do fine fornow.Mon W/B 11/02/13(Detailed Weekly Summary)I planned to book out a camera from college and take mostof the images for my magazine as this is the week we haveBecause I wasn’t able to take my pictures this week I will see if Ican arrange to do that by next week instead whether it is during
  • 2. BTEC Extended Diploma in Creative Media ProductionIG4 Final Major ProjectProduction Diaryoff from college however because A levels needed them Icouldn’t have one there as they had to use all the camerasso there was none left for anyone else, so instead I wroteup a plan of what images I would take, who would be inthe pictures and how many people I would need and I nowhave friends that have agreed to let me photograph themfor my magazine.the week or at the weekend.As I will be taking pictures outside of college, during my lessonsnext week I will start creating a thorough questionnaire as partof my market research then I will hopefully have this done overmaybe 2 lessons at the most and then hand them out onThursday and then by the beginning of next week I hope to havethe results from them all tallied up and then I will put them onmy blog along with the questionnaire I originally created.Mon W/B 18/02/13(Detailed Weekly Summary)I created my questionnaire and in a college break I handedthem out around the college, approaching my targetaudience and got the results and tallied them up then inmy next lesson I wrote up an analysis talking about myresults, why I asked those specific questions and what I willdo with them now.I now plan to write up a detailed plan of what images I am goingto take and where and explain what is going onto each page.Mon W/B 25/02/13(Detailed Weekly Summary)I wrote my magazine pitch in the first two lessons I had thisweek and I timed myself reading it through so that I knewhow long the presentation I plan to create will need to be. Iwill now start gathering images for my presentation.I plan to get all the images I need to do my PowerPointpresentation and then I want that to be finished in the firstlesson I have next week so that I can start learning what I needto say for my pitch.Mon W/B 04/03/13(Detailed Weekly Summary)I have now finished my presentation and I am just adding alittle bit more to my pitch as I feel I haven’t yet coveredeverything that I need to talk about.I will start writing cue cards that I will be able to take in with meand continue to try and memorise my pitch ready for Tuesday,as that is the day I will be delivering my pitch. So I need toensure that I am prepared for it.Mon W/B 11/03/13(Detailed Weekly Summary)This week I had my pitch on Tuesday so I made sure that Iwas all prepared so that I would be able to give the bestpitch I could in order to get a good grade for this and Ithink that it went very well.Next week I would like to start designing the front cover for mymagazine as I now have the image that I want to use for it andas I am only using one image I will be able to do this, firstly Ineed to design my masthead, what it will look like and whatcolours as I already have the name.Mon W/B 18/03/13(Detailed Weekly Summary)This week I made the mock ups for my front cover thenbegan designing my front cover, up to now I have done themasthead edited the cover image and put it onto the coverand added the barcode price and date.I will be continuing with this as I still need to come up withabout 4 or 5 cover lines and then I will see how the magazinelooks with that done.Mon W/B 01/04/13 So this week I decided on my cover lines chose the font I am now happy with my cover and I have gone on to editing the
  • 3. BTEC Extended Diploma in Creative Media ProductionIG4 Final Major ProjectProduction Diary(Detailed Weekly Summary) and colour I wanted them to be in and then added themonto my magazine cover then I will see if I like it then if I dothis my cover will be finished and I will be able to go onand design the over pages for my magazine.images I will be using for my double page spread this won’t takelong as I am quite happy with the images that I have took forthese I’d just like to add a little effect to them.Then I will write up what I am going to put onto the double pagespread in word then add it to the page as I am designing it.Mon W/B 08/04/13(Detailed Weekly Summary)Mon W/B 15/04/13(Detailed Weekly Summary)PROGRESS UPDATE PLAN FOR NEXT MONTH / WEEK (Including PossibleContingency Plans)

×