Prf methannb
Upcoming SlideShare
Loading in...5
×
 

Prf methannb

on

  • 558 views

 

Statistics

Views

Total Views
558
Views on SlideShare
558
Embed Views
0

Actions

Likes
0
Downloads
14
Comments
0

0 Embeds 0

No embeds

Accessibility

Categories

Upload Details

Uploaded via as Microsoft PowerPoint

Usage Rights

© All Rights Reserved

Report content

Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
  • Full Name Full Name Comment goes here.
    Are you sure you want to
    Your message goes here
    Processing…
Post Comment
Edit your comment
  • Sources Russes
  • Planeta
  • Planeta
  • Sources Russes, Planeta
  • Sources Russes, Planeta
  • Planeta
  • Sources Russes
  • Sources Russes
  • Sources Russes
  • MOSER
  • Sources Russes
  • Sources Russes
  • Sources Russes
  • Sources Russes
  • Sources Russes
  • FAUZI

Prf methannb Prf methannb Presentation Transcript

  • Parameters of mining method evaluation What we are looking for choosing the mining method This objectives are contradictory Maximum recovery of reserves recovery characteristics Maximum daily tonnage for productivity characteristics minimum stopes in operation Minimum cost consumption and economic characteristics Under good security conditions
  • Recovery characteristics : sources of dilution and loss Loss in pillars Loss and dilution on irregular ore/waste contacts Dilution when stope opening is larger then ore thickness Loss on irregular footwall Loss and dilution on the working surface during the loading Loss and dilution during extraction under caving waste minerai remblai
  • Recovery characteristics : dilution and losses ore waste waste Recoverable reserve R dilution S losses P
  • Direct calculation of dilution and loss R - recoverable reserve, t R =10000 t P - loss, t P = 900 t S - dilution with waste, t S = 1600 t TV - run of mine tonnage, t TV = R - P + S = 10000 - 900 + 1600 = 10700 t t R - average grade of metal in recoverable reserve, t R = 0,08 t P - average grade of metal in loss, t P = 0,11 t S - average grade of metal in waste (dilution), t S = 0,015 t TV - average grade of metal in run of mine, t TV = (R * t R - P * t P + S * t S )/TV= (10000*0,08 - 900*0,11 + 1600*0,015)/10700 = 0,068 metal ore
  • Indirect calculation of dilution and loss Loss of ore Dilution Loss of metal
  • Dilution and loss optimisation
  • Dilution
  • Losses
  • Productivity characteristics Stope output : tonnes per stope and per month Relative weight of development : metrage of drifts par 1000 t of recoverable ore percentage of development in cost of a tonne of ore Productivity of personnel : tonnes per man and per shift tonnes per man and per year Level of mechanization : percentage of labor in costs
  • Stope output
  • Relative weight of development
  • Productivity of personnel Mine personnel : totale, underground, stope
  • Productivity of underground personnel
  • Level of mechanization
  • Powder consumption
  • Relative operating cost of mining methods compared with room and pillar mining Operating cost of room and pillar mining vary between 2 et 27 $/t with country, it’s 14,5 in average