Your SlideShare is downloading. ×
0
Introd
Introd
Introd
Introd
Introd
Introd
Upcoming SlideShare
Loading in...5
×

Thanks for flagging this SlideShare!

Oops! An error has occurred.

×
Saving this for later? Get the SlideShare app to save on your phone or tablet. Read anywhere, anytime – even offline.
Text the download link to your phone
Standard text messaging rates apply

Introd

310

Published on

Published in: Business, Technology
0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total Views
310
On Slideshare
0
From Embeds
0
Number of Embeds
0
Actions
Shares
0
Downloads
4
Comments
0
Likes
0
Embeds 0
No embeds

Report content
Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
No notes for slide

Transcript

  • 1. Technical study simulation
  • 2. Initial data Thickness, dip, horizontal and vertical extension of deposit Metal grade Mechanical rock characteristics Objective is to establish : Ore and metal reserves Mine production rate Mining method Type of primary access and production development openings Content of the study Requirements in principal equipment Operating costs of principal operations Capital costs Stope output
  • 3. Choosing of mining method Estimate the operating cost for principal operations Estimate the costs of development and equipment Sizing of development drifts, determination of development volume Mining method Type of principal equipment Sizing of the stope, calculation of recoverable ore tonnage Stope development Estimate the productivity of principal operations
  • 4. Choosing of the type of primary access Choosing of the type of primary access Sizing of openings Evaluation of costs
  • 5. Life of a Mine plan Pre feasibility feasibility construction exploitation
  • 6. Methods of mine evaluation Analogy Direct calculation Empirical approaches

×