Your SlideShare is downloading. ×
0
Pueblo School District 60 Renewable Energy Demonstration Project
Pueblo School District 60 Renewable Energy Demonstration Project
Pueblo School District 60 Renewable Energy Demonstration Project
Pueblo School District 60 Renewable Energy Demonstration Project
Pueblo School District 60 Renewable Energy Demonstration Project
Pueblo School District 60 Renewable Energy Demonstration Project
Pueblo School District 60 Renewable Energy Demonstration Project
Pueblo School District 60 Renewable Energy Demonstration Project
Pueblo School District 60 Renewable Energy Demonstration Project
Pueblo School District 60 Renewable Energy Demonstration Project
Pueblo School District 60 Renewable Energy Demonstration Project
Pueblo School District 60 Renewable Energy Demonstration Project
Pueblo School District 60 Renewable Energy Demonstration Project
Pueblo School District 60 Renewable Energy Demonstration Project
Pueblo School District 60 Renewable Energy Demonstration Project
Pueblo School District 60 Renewable Energy Demonstration Project
Pueblo School District 60 Renewable Energy Demonstration Project
Pueblo School District 60 Renewable Energy Demonstration Project
Pueblo School District 60 Renewable Energy Demonstration Project
Pueblo School District 60 Renewable Energy Demonstration Project
Pueblo School District 60 Renewable Energy Demonstration Project
Pueblo School District 60 Renewable Energy Demonstration Project
Pueblo School District 60 Renewable Energy Demonstration Project
Pueblo School District 60 Renewable Energy Demonstration Project
Pueblo School District 60 Renewable Energy Demonstration Project
Upcoming SlideShare
Loading in...5
×

Thanks for flagging this SlideShare!

Oops! An error has occurred.

×
Saving this for later? Get the SlideShare app to save on your phone or tablet. Read anywhere, anytime – even offline.
Text the download link to your phone
Standard text messaging rates apply

Pueblo School District 60 Renewable Energy Demonstration Project

1,105

Published on

Project Review of a 6.3 kW solar electric generator & a 7.5 kW wind turbine that will be used for science and technology education.

Project Review of a 6.3 kW solar electric generator & a 7.5 kW wind turbine that will be used for science and technology education.

Published in: Education, Technology, Business
0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total Views
1,105
On Slideshare
0
From Embeds
0
Number of Embeds
0
Actions
Shares
0
Downloads
10
Comments
0
Likes
0
Embeds 0
No embeds

Report content
Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
No notes for slide

Transcript

  • 1.  
  • 2. Whitney Electric Company Wired to the Future Since 1913
  • 3. StEPP Grant Funding Strategic Environmental Project Pipeline
    • Author: Tharyn Mulberry, Heaton Principal
    • Co-author: Dr. Lee Ann Martinez, CSU Pueblo/Parent
    • District 60 Staff
      • Mark Gazette, Director of Facilities Management
      • Jeff Reed, Project Manager Facilities
      • Greg Sinn, Public Relations Officer
  • 4. Grant Summary
    • $107,480 award to create an environmentally sustainable campus that integrates green technologies into both operations and curricula
    • Program components include
      • 7.5 kW Wind generator with Weather Bug station
      • 6.3 kW Photovoltaic array with Internet monitoring
      • PV system will offset
        • 146,000 lbs of CO2
        • 1,245 lbs of NOx
        • 125 lbs of SO2
  • 5. Aerial view of proposed PV location
  • 6. Model for Heaton Pole Layout
  • 7. Model for Heaton System Kiosk
  • 8. Array Location before Installation
  • 9. Drilling Caissons for Pole Mounts
  • 10. PV Work in Progress
  • 11. Finished Solar Photovoltaic Project
  • 12. Colorado Wind Resource Map http://www.windpoweringamerica.gov/maps_template.asp?stateab=co
  • 13. XCEL Energy Comanche Station, Pueblo, CO
  • 14. XCEL Energy Comanche Station, Pueblo, CO
  • 15. S-1 Zoning Map
  • 16. 7.5 kW Wind Turbine Challenges
  • 17. Renderings for Neighborhood Meetings
  • 18. Drilling the Caisson for the Base
  • 19. The Turbine arrives from China
  • 20. Preparing for the tilt-up
  • 21. Turbine Control Equipment
  • 22. Proud Papa
  • 23. Student Choir Composes Song
  • 24. Screaming Sixth Graders
  • 25. Questions

×