Pueblo School District 60 Renewable Energy Demonstration Project

1,220 views
1,166 views

Published on

Project Review of a 6.3 kW solar electric generator & a 7.5 kW wind turbine that will be used for science and technology education.

Published in: Education, Technology, Business
0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total views
1,220
On SlideShare
0
From Embeds
0
Number of Embeds
2
Actions
Shares
0
Downloads
10
Comments
0
Likes
0
Embeds 0
No embeds

No notes for slide

Pueblo School District 60 Renewable Energy Demonstration Project

  1. 2. Whitney Electric Company Wired to the Future Since 1913
  2. 3. StEPP Grant Funding Strategic Environmental Project Pipeline <ul><li>Author: Tharyn Mulberry, Heaton Principal </li></ul><ul><li>Co-author: Dr. Lee Ann Martinez, CSU Pueblo/Parent </li></ul><ul><li>District 60 Staff </li></ul><ul><ul><li>Mark Gazette, Director of Facilities Management </li></ul></ul><ul><ul><li>Jeff Reed, Project Manager Facilities </li></ul></ul><ul><ul><li>Greg Sinn, Public Relations Officer </li></ul></ul>
  3. 4. Grant Summary <ul><li>$107,480 award to create an environmentally sustainable campus that integrates green technologies into both operations and curricula </li></ul><ul><li>Program components include </li></ul><ul><ul><li>7.5 kW Wind generator with Weather Bug station </li></ul></ul><ul><ul><li>6.3 kW Photovoltaic array with Internet monitoring </li></ul></ul><ul><ul><li>PV system will offset </li></ul></ul><ul><ul><ul><li>146,000 lbs of CO2 </li></ul></ul></ul><ul><ul><ul><li>1,245 lbs of NOx </li></ul></ul></ul><ul><ul><ul><li>125 lbs of SO2 </li></ul></ul></ul>
  4. 5. Aerial view of proposed PV location
  5. 6. Model for Heaton Pole Layout
  6. 7. Model for Heaton System Kiosk
  7. 8. Array Location before Installation
  8. 9. Drilling Caissons for Pole Mounts
  9. 10. PV Work in Progress
  10. 11. Finished Solar Photovoltaic Project
  11. 12. Colorado Wind Resource Map http://www.windpoweringamerica.gov/maps_template.asp?stateab=co
  12. 13. XCEL Energy Comanche Station, Pueblo, CO
  13. 14. XCEL Energy Comanche Station, Pueblo, CO
  14. 15. S-1 Zoning Map
  15. 16. 7.5 kW Wind Turbine Challenges
  16. 17. Renderings for Neighborhood Meetings
  17. 18. Drilling the Caisson for the Base
  18. 19. The Turbine arrives from China
  19. 20. Preparing for the tilt-up
  20. 21. Turbine Control Equipment
  21. 22. Proud Papa
  22. 23. Student Choir Composes Song
  23. 24. Screaming Sixth Graders