Final major project production diary by james fox 08.4.13

232 views
160 views

Published on

Published in: Career
0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total views
232
On SlideShare
0
From Embeds
0
Number of Embeds
5
Actions
Shares
0
Downloads
0
Comments
0
Likes
0
Embeds 0
No embeds

No notes for slide

Final major project production diary by james fox 08.4.13

  1. 1. BTEC Extended Diploma in Creative Media ProductionIG4 Final Major ProjectProduction DiaryPROGRESS UPDATE PLAN FOR NEXT MONTH / WEEK(Including PossibleContingency Plans If Problems Anticipated)Mon W/B 07/01/13(Detailed Weekly Summary)Mon W/B 14/01/13(Detailed Weekly Summary)Mon W/B 21/01/13(Detailed Weekly Summary)Firstly I created my blog, then exceeding in completing myproduction schedule and idea’s generation. I gave it a thought andstarted researching on the topic I chose which was a double pagespread of a fashion based magazine. This focus will enhance intomore advanced information to the reader.Surpass completion on Ideas generation and proceed inkeeping my production schedule up to date. The 28.1.13will consist of producing a proposal so preparation issufficient.Mon W/B 28/01/13(Detailed Weekly Summary)My production is running smoothly considering into initiation myresearch and proposal which are coming to exceed in completion.Pre-production for my proposal is now being submitted.Top on completing my proposal and providing moreresearch information on my final major project.Mon W/B 04/02/13(Detailed Weekly Summary)My week’s pre-production has consisted of completion of myproposal which didn’t take along as set out. This accomplishmenthas surpassed me to start comparing both idea’s generation andmy proposal to depict on what ideas I’ve chosen.Complete work on comparing idea’s generation toproposal and have an evaluation finished.Mon W/B 11/02/13(Detailed Weekly Summary)Mon W/B 18/02/13(Detailed Weekly Summary)Completion of set objectives are of enhanced detail and I’m happywith the standard of work I’ve produced. To forward thisprogression I’ve lightened the idea of starting my pitch within anearlier date.To complete pre-production for my pitch which is set tobe performed within the next 2-3 weeks.Mon W/B 25/02/13(Detailed Weekly Summary)Pre-Production is in order and is exceeding in completion. Thepitch script is going through conclusion throughout today’s lesson.Hopefully concluding this success through will prove completion ofPre-production for my pitch.To complete pre-production for my pitch which is set tobe performed within the next 2-3 weeks. Moving ontopre-production for my final major project.
  2. 2. BTEC Extended Diploma in Creative Media ProductionIG4 Final Major ProjectProduction DiaryMon W/B 04/03/13(Detailed Weekly Summary)Pre-production for my pitch is now completed and in the comingweeks I just exceed in perfecting my presentation.CompletedMon W/B 11/03/13(Detailed Weekly Summary)Pre-production for my pitch is now completed and in the comingweeks I just exceed in perfecting my presentation.CompletedMon W/B 18/03/13(Detailed Weekly Summary)Pre-production for my pitch is now completed and in the comingweeks I just exceed in perfecting my presentation.CompletedMon W/B 01/04/13(Detailed Weekly Summary)Throughout completing my pitch on the 25.03.13, progression hasbeen running smoothly.The main outlet now is to produce my final majorproject a little pre-production is still needed but I willexceed in completion.Mon W/B 08/04/13(Detailed Weekly Summary)Everything is now completed Everything is now completedMon W/B 15/04/13(Detailed Weekly Summary)Everything is now completed Everything is now completedPROGRESS UPDATE PLAN FOR NEXT MONTH / WEEK (Including PossibleContingency Plans)

×