Tirex Resources Ltd. Corporate Profile

981 views
894 views

Published on

A full description of Tirex Resources Ltd.

0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total views
981
On SlideShare
0
From Embeds
0
Number of Embeds
9
Actions
Shares
0
Downloads
5
Comments
0
Likes
0
Embeds 0
No embeds

No notes for slide

Tirex Resources Ltd. Corporate Profile

  1. 1. Tirex Resources. We don’t simply own a great project…….we own a great DISTRICT of PROJECTS!
  2. 2. DISCLAIMER Certain statements in the following presentation regarding Tirex Resources’ business operations may constitute “forward looking statements”. Such statements are not historical facts, but are predictions about the future, which inherently involve risks and uncertainties, and these risks and uncertainties could cause our actual results to differ materially from those contained in the forward looking statement. George Gorzynski, P.Eng., a Qualified Person under the meaning of Canadian National Instrument 43-101,is responsible for the technical information in this presentation.
  3. 3. CORPORATE SUMMARY Began trading October 19, 2007 (TSX.V: TXX) Shares Outstanding: 37,208,285 (20% held by management) Stock Options: 3,317,000 Other Warrants: Nil Working Capital: $2,100,000 (as of March 2009) * Fully Diluted Working Capital: $4,800,000 (approx.) Last equity financings at $2.75 and $2.10 p share q y g per * Please see the financing news from October 9th, 2008 which is intended to provide for future requirements.
  4. 4. Recent Financing with the EBRD  €6 Million financing  This is the first EVER natural resource investment in Albania by the EBRD  This is the EBRD’s first EVER exploration financing anywhere in the world  The financing came after a period of significant due diligence  Financing comes in three tranches as required by Tirex  Tranche 1 has arrived, tranche 2 and 3 have FLOOR conversion price levels but no CEILING  Favourable terms due to the EBRD’s mandate to assist the growth of free market economies
  5. 5. European Bank for Reconstruction and Development  Established in 1991  Owned by 61 countries and 2 intergovernmental organizations  Rated AAA from Standards & Poors, Aaa from Moody’s and AAA from Fitch  Subscribed capital of €20 billion  Largest investor in Eastern Europe/Central Asia region  Last year, the EBRD invested €5.1 billion in the region (€7 billion targeted for 2009)
  6. 6. EXPERIENCED MANAGEMENT TEAM R. Stuart (Tookie) Angus, LL.B., Chairman Mr. Angus is an independent business advisor to the mining industry. He was formerly Head of the Global Mining Group for Fasken Martineau. For the past 30 years, Mr. Angus has focused on structuring and financing significant international exploration, development and mining ventures. More recently, he was Managing Director of Mergers & Acquisitions for Endeavour Financial. Mr. Angus is the former Chairman of the Board of BC Sugar Refinery Limited, was a Director of First Quantum Minerals until June 2005, was a Director of Canico Resources Corporation until its takeover by CVRD and was a Director of Bema Gold until its takeover by Kinross Gold. He is presently a Director of Polaris Minerals Corporation, Plutonic Power Corporation and Chairman of Nevsun Resources. Bryan Slusarchuk, Chief Executive Officer Mr. Slusarchuk has significant experience financing companies involved in mineral exploration and development. Mr. Slusarchuk was previously a Senior Investment Advisor at Canaccord Capital Corporation, a premier Canadian investment dealer and prior to that was Project Development Manager for a private Canadian-based resource company. While Mr. Slusarchuk sits on the Board of several private and public Canadian corporations, the vast majority of his focus and time is on the management of Tirex Resources and its day-to-day activities. Mr. Slusarchuk has extensive contacts in Europe and North America and has worked within this network to finance and structure Canadian and international mineral exploration activities. George Gorzynski, P. Eng., Director Mr. Gorzynski is a geologist and an international mineral exploration consultant to the junior exploration industry. His wide-ranging experience spans over 25 years and has included projects over much of the globe. Mr. Gorzynski is currently a Director of Impact Silver Corporation, a publicly traded silver producer and exploration company where he was instrumental in identifying, negotiating and completing the purchase of the Royal Mines of Zacualpan project for the company. Mr. Gorzynski holds a Bachelor of Applied Science (Honours) from the University of Toronto and a Master of Applied Science from the University of British Columbia. He is a Professional Engineer registered in the Province of British Columbia. W.J. (Bill) Weymark, P. Eng., Director Mr. Weymark has extensive experience at both the Board and Senior Executive levels dealing with strategic planning, corporate governance, acquisitions, marketing and operations. Until 2007, Mr. Weymark was the President and Chief Executive Officer of Vancouver Wharves / BCR Marine, a Canadian corporation in the transportation industry that employed more than 1,200 people. Prior to this, Mr. Weymark was the Vice President and General Manager of the largest open-pit lead-zinc mine in the world, an operation that employed over 1,000 people. Mr. Weymark is a Professional Engineer and is a member of the Canadian Institute of Mining and Metallurgy, the American Institute of Mining Engineers and the Association of Professional Engineers of British Columbia, Alberta and Saskatchewan. Mr. Weymark has a Bachelor of Applied Science in Mining and Mineral Processing Engineering from the University of British Columbia. .
  7. 7. Management Team continued Carol Shevlin, Chief Financial Officer Mrs. Shevlin is a Senior Policy Analyst at the Financial Services Commission of Ontario. From 2002 to 2005, she acted as a self- employed consultant to public companies specializing in risk management and corporate governance. From 1990 to 2002, Mrs. Shevlin held a variety of management positions with the Office of the Superintendent of Financial Institutions, culminating as a Senior Director. She was an alternative member of the Board of Directors of the Canadian Deposit Insurance Corporation during 1998-1999. Mrs. Shevlin obtained her designation as a Certified General Accountant in 1979 (Ontario) and holds a Bachelors of Arts degree from the University of Toronto. Shoni Bernard, LL.B., Corporate Secretary Ms. Bernard is a member of the Law Society of British Columbia (since July 12, 1983). She obtained a B.Soc. Sc. degree from the University of Ottawa in 1979 and obtained her LL.B. degree from the University of Ottawa in 1982. Ms. Bernard is an experienced corporate lawyer with an in-depth knowledge and understanding of the regulatory environment within which public companies operate. Her focus is on mineral exploration and development companies. Prof. Perparim Alikaj, Ph.D, Albanian Country Manager Prof. Alikaj is based in Tirana, Albania and is a citizen of both Albania and Canada. Prof. Alikaj is the Head of Geophysics Section, Department of Earth Sciences at Polytechnic University of Tirana. Prof. Alikaj is also a private consulting geophysicist in mineral exploration, groundwater exploration and engineering geology. Prof. Alikaj is credited with inventing Real Section IP and Voltage Domain IP technologies. He has consulted on numerous gold and base metal exploration projects throughout the world including projects in North America, Central America, South America, Europe, Asia, Africa and Australia. The largest ore deposit discovered with Real Section IP technology is the San Nicolas deposit with 150 million ton of polymetallic minerals, located at a depth of 200m. Prof. Alikaj has a Bachelors of Science as a Geophysical Engineer, a Master of Science in Geophysics and a Ph.D in Geophysics from the Polytechnic University of Tirana. He is a member of the European Association of Geoscientists and Engineers and of the Canadian Exploration Geophysical Society.
  8. 8. Tirex Technical Team Dr. Allan R. Miller, P.Geo. Chief Geologist Dr. Miller is a Mineral Deposits Specialist and formerly Mineral Deposits Research Scientist with the Geological Survey of Canada in charge of region-scale metallogenic and deposit-scale alteration studies in northern Canada. Dr. Miller lends his considerable expertise to mapping and interpreting the geology and mineralization of the Mirdita District. This work has already produced some new and innovative interpretations of the VMS deposits of the district, and is generating new target areas for exploration. Dr. C. Tucker Barrie, Consulting VMS Expert Dr. Barrie is a renowned consulting VMS deposit specialist and Adjunct Professor at Laurentian University and at the University of Windsor (Canada). He has written several landmark papers on VMS deposits and has studied many of the major VMS districts in the world. He is in high demand internationally for lectures and courses on VMS deposits. He joins Tirex as a Consulting VMS Expert and will support the Tirex team with his expertise and experience. Dr. Perparim Alikaj, Head of Albanian Advisory Team Dr. Alikaj is an internationally recognized geophysicist and is Head of the Geophysics Section, Department of Earth Sciences at Polytechnic University of Tirana (Albania). Dr. Alikaj is a citizen of both Albania and Canada is credited with inventing Real Section IP and Voltage Domain IP technologies. He has consulted on numerous exploration projects around the world. The largest ore deposit discovered with Real Section IP technology is the San Nicolas VMS deposit in Mexico containing 65 million tonnes of copper, zinc, silver and gold mineral reserves. Dr. Alikaj advises Tirex on both geophysics and coordinates activities with Albanian authorities. John Nicholson, P. Geo., Project Manager Mr. Nicholson has led large and complex exploration projects from the high Arctic to Mexico and South America. He brings to Mirdita a wealth of experience in project management and logistics along with a strong geological background that ensures the exploration is carried out effectively and to high professional standards. Brian Game, P. Geo., Joint Project Manager Mr. Game is a highly experienced geologist and manages the project when Mr. Nicholson is off site. Mr. Game’s long and varied career includes project management and exploration projects from Canada to South America including Flin Flon, Manitoba (Canada), one of the great VMS districts of the world.
  9. 9. ABOUT ALBANIA Rapidly Emerging economy European Union (EU) membership targeted for 2013 Formal invitation to join NATO in 2008 Albania is a stable parliamentary democracy Population of 3,600,000 Government is eager to attract and retain foreign investment and recently reduced the corporate tax rate from 20% to 10% Same stable Mining Law in place since 1994
  10. 10. THE SETTING Southern Europe Excellent Logistics Supportive government World Class potential Underexplored by modern methods
  11. 11. THE OPPORTUNITY Pioneers in a new era of Albanian mineral exploration Tirex acquired the biggest concession in the country covering most of the main copper-zinc-gold VMS District Mirdita is a potentially World Class District with multiple gold-rich economic deposits The district has had limited modern exploration Without modern exploration, the Albanians found 17 historical deposits, 9 of which went into production Being the First Mover has its advantages!
  12. 12. Targeting an Entire District "Historical data suggests that the Tirex property has the potential to host a large VMS base metal district." (NI 43-101 Technical Summary Report, Mirdita Project, Albania, 2007)
  13. 13. MIRDITA PROJECT POTENTIAL “VMS…deposits vary from small low grade lenses to world class deposits that form some of the most valuable aggregates of metal in the world.” from NI 43-101 Technical Summary Report, Mirdita Project, Albania, 2007 So what is the potential of the Mirdita Project within this spectrum? SIZE: The District has large historic production - over 10 Mtonnes with many additional known deposits and exploration targets. The potential for size is LARGE. GRADE: The Mirdita Project has known high grade deposits
  14. 14. PROJECT DESCRIPTION MIRDITA PROJECT: A large Copper-Zinc-Gold District-scale play DEPOSIT TYPE: Volcanogenic Massive Sulphides (VMS) similar in form to great mining districts such as Noranda and Kuroko THE BLUE SKY POTENTIAL: Development of a World-Class VMS Mining District with multiple, large, gold-rich economic deposits
  15. 15. GOOD INFRASTRUCTURE Existing infrastructure from previous mining Good Access & Extensive Road Networks Electrical Power Grid Short distance to sea port Short distance to labour pool Major highway construction occurring on and near the property, improving already favourable logistics
  16. 16. In addition to drilling verification holes in known deposit areas, Tirex will also be drilling numerous High Priority but previously un-drilled geophysical targets. These are targets that the company identified during the Tirex 2007 airborne EM geophysical survey. As this was the first ever airborne geophysical survey in the history of the country, many of these targets have never been drill tested and provide investors with potential exposure to pure discovery.
  17. 17. Large New Area Discovered by Tirex in 2008  favourable volcanic host rocks hidden from previous state run exploration programs by a thin limestone cap  this large area has never been explored using modern methods  Tirex has identified this large new area through deep penetrating geophysics, geochemistry and modern mapping methods  huge new, undrilled potential  drill targets are established for Spring 2009 in this brand new area  highly prospective for gold and silver rich VMS mineralization
  18. 18. Precious Metals  To date, Tirex has produced outstanding gold and silver assays  Silver was never assayed for in previous Albania state run programs and gold was assayed for very sporadically and kept a state secret  The high gold levels in every successful Tirex drill hole thus far indicates District-scale gold potential  Gold levels have been consistently good over long 50-65m intercepts, with some exceptionally high grade intercepts over 5-20m lengths  Mirdita is developing into a large District-scale gold and silver opportunity, previously unknown
  19. 19. Hole 1 at Koshaj Intersects 65 Metres of Mineralization KOSHAJ DEPOSIT - DRILL HOLE MR08-01 KOSHAJ DEPOSIT - DRILL HOLE MR08-01 CORE CORE COPPE SILVE FROM TO LENGTH FROM TO LENGTH LEAD COPPER ZINC SILVER ZINC R GOLD LEAD R GOLD (m) (m) (m) (m) (%)(m) (%) (m) (%) (%) (g/t) (%) (g/t) (%) (g/t) (g/t) 38.5 103.5 65.0 103. 0.6 9.0 0.3 48.4 2.7 38.5 5 65.0 0.6 9.0 0.3 48.4 2.7 Including 38.5 42.2 Including 3.7 0.8 16.3 0.9 118.6 8.3 38.5 42.2 3.7 0.8 16.3 0.9 118.6 8.3 Including 40.4 41.2 Including 0.8 1.4 53.8 2.2 369.6 29.5 40.4 41.2 0.8 1.4 53.8 2.2 369.6 29.5 Including 52.8 66.9 Including 14.1 0.9 11.6 1.0 141.6 5.5 52.8 66.9 14.1 0.9 11.6 1.0 141.6 5.5 Including 63.8 66.9 Including 3.1 2.3 34.8 2.4 376.1 14.6 63.8 66.9 3.1 2.3 34.8 2.4 376.1 14.6 Including 76.0 103.5 Including 27.5 0.8 12.5 0.1 13.0 2.2 103. 76.0 5 27.5 0.8 12.5 0.1 13.0 2.2 For True Widths, please refer to Tirex News Releases.
  20. 20. Tirex Intersects Further Strong Mineralization at Mirdita KOSHAJ DEPOSIT ZIN FROM TO CORE LENGTH COPPER C LEAD SILVER GOLD KOSHAJ DEPOSIT (m) (m) (m) (%) (%) (%) (g/t) (g/t) ZIN FROM TO CORE LENGTH HOLECOPPER DRILL MR08-02 C LEAD SILVER GOLD (m) (m) (m) (%) (%) (%) (g/t) (g/t) 134. DRILL HOLE MR08-02 74.3 6 60.4 1.1 6.7 0.1 17.7 1.6 Including 74.3 134.6 60.4 1.1 6.7 0.1 17.7 1.6 33. 75.3 78.9 3.7 2.4 2 1.1 172.0 8.6 Including 75.3 78.9 Including 3.7 2.4 33.2 1.1 172.0 8.6 27. Including 75.3 75.9 0.7 7.3 3 1.8 310.5 15.1 75.3 75.9 0.7 Including 7.3 27.3 1.8 310.5 15.1 132. 11. Including 116.8 7 15.9 1.2 4 0.1 15.2 2.0 116.8 132.7 15.9 1.2 11.4 0.1 15.2 2.0 DRILL HOLE MR08-03 DRILL HOLE MR08-03 134. 121.6 5 12.9 0.5 4.4 0.6 44.5 1.7 121.6 134.5 12.9 0.5 4.4 0.6 44.5 1.7 Including Including 124. 11. 121.6 124.1 121.6 2.5 1 0.4 11.3 2.5 2.6 0.4 135.0 3 5.4 2.6 135.0 5.4 Including Including 132.8 134.5 1.7 134. 2.9 14.5 0.8 107.4 14. 4.2 132.8 5 1.7 2.9 5 0.8 107.4 4.2
  21. 21. More Great Results from Hole 4 & 5 KOSHAJ DEPOSIT FROM TO CORE LENGTH COPPER ZINC SILVER GOLD (m) (m) (m) (%) (%) (g/t) (g/t) DRILL HOLE MR08-05 137.9 153.9 16.0 1.0 5.2 11 1.7 KOSHAJ DEPOSIT Including 145.9FROM 146.9 TO CORE LENGTH 1.0 1.6COPPER15.2 ZINC 57 SILVER 5.1 GOLD (m) (m) (m) (%) (%) (g/t) (g/t) Including DRILL HOLE MR08-05 151.8 152.9 1.1 1.8 18.1 41 4.1 137.9 153.9 DRILL HOLE MR08-04 16.0 1.0 5.2 11 1.7 88.70 124.60 35.9 0.23 3.18 13.9 1.0 Including Including 145.9 146.9 1.0 1.6 15.2 57 5.1 88.7 91.6 2.9 0.48 5.42 132.8 4.2 Including Including 88.7 151.8 89.3 152.9 0.6 1.1 1.01 1.8 21.27 18.1612.0 41 18.0 4.1 Including 103.6 124.6 21.0 0.32 4.64 5.1 1.0 Including 103.6 116.6 13.0 0.43 5.26 6.8 1.2 Including 110.6 115.6 5.0 0.48 7.88 5.6 1.3
  22. 22. Koshaj Deposit continued - Hole 6 & 7 KOSHAJ DEPOSIT (continued) KOSHAJ DEPOSITFROM (continued) TO INTERSECTION COPPER ZINC LEAD SILVER GOLD FROM TO (m) (m) INTERSECTION (m) COPPER ZINC(%) LEAD(%)SILVER GOLD (%) (g/t) (g/t) (m) (m) (m) (%) (%) (%) (g/t) (g/t) DRILL HOLE MR08-06 152.0 DRILL HOLE MR08-06 170.9 18.9 0.60 3.43 0.22 20.2 1.1 152.0 Includin 170.9 18.9 0.60 3.43 0.22 20.2 1.1 g Including 158.1 163.7 5.6 1.70 6.72 0.02 7.2 1.1 158.1 163.7 5.6 1.70 6.72 0.02 7.2 1.1 DRILL HOLE MR08-07 DRILL HOLE MR08-07 185.6 163.5 185.65 22.2 0.29 1.70 0.10 10.1 0.6 163.5 5 22.2 0.29 1.70 0.10 10.1 0.6 Including Includin 163.5 164.1 0.6 1.39 11.34 0.09 26.7 2.0 g Including 11.3 179.1 179.7 163.5 164.1 0.6 0.6 5.71 9.15 1.39 0.25 144.6 0.09 14.1 4 26.7 2.0 Includin g 179.1 179.7 0.6 5.71 9.15 0.25 144.6 14.1
  23. 23. Gurthi South No. 2 – First Drillholes GURTHI SOUTH No. 2KOSHAJ DEPOSIT (continued) FROM TO INTERSECTION COPPER ZINC LEAD SILVER GOLD (m) (m) (m) (%) (%) (%) (g/t) (g/t) FROM TO ESTIMATED TW COPPER ZINC SILVER GOLD (m) (m) DRILL HOLE MR08-06 (m) (%) (%) (g/t) (g/t) 152.0 170.9 18.9 0.60 3.43 0.22 20.2 1.1 DRILL HOLE MR08-16 Includin 125.4 139.2 g 13.9 3.5 0.6 7.5 1.3 158.1 163.7 5.6 1.70 6.72 0.02 7.2 1.1 Including 126.3 DRILL HOLE MR08-07 129.9 3.7 10.6 0.2 6.5 2.9 Including 185.6 126.3 127.4 1.1 13.6 0.2 11.5 7.4 163.5 5 22.2 0.29 1.70 0.10 10.1 0.6 DRILL HOLE MR08-25Includin g 11.3 120.0 127.1 163.5 164.1 7.1 0.65.9 1.39 0.7 4 37.5 0.09 26.7 3.4 2.0 Including Includin 122.0 126.7 4.7 7.0 0.7 40.8 3.9 g Including 179.1 179.7 0.6 5.71 9.15 0.25 144.6 14.1 126.1 126.7 0.6 12.8 0.2 24.6 4.9
  24. 24. High Grade Gurthi South No. 2 Open for Expansion
  25. 25. News Flow is Consistent as Exploration Ramps Up at Mirdita  February 18, 2009… Tirex Intersects Significant Gold Grades and High Grade Copper at Mirdita  January 13, 2009…. Tirex Resources First Hole in DEPOSIT IntersectsHOLE MR08-01Mineralization including strong gold,…. KOSHAJ New Zone - DRILL 61.5m (202ft) of  November 06, 2008…. CORE COPPE SILVE Tirex Resources Intersects 7.1m (23.3 ft) of 5.9% copper, 3.4g/t gold and 37.5 G/T silver at Mirdita FROM TO LENGTH R ZINC LEAD R GOLD  October 23, 2008… Tirex Resources intersects high grade mineralization in new zone at Mirdita (m) (m) (m) (%) (%) (%) (g/t) (g/t)  October 9, 2008… Tirex Arranges € 6 million Financing with European Bank for Reconstruction and Development  September 10, 2008… 103. Tirex Commences Drilling of New and Previously Unexplored Old Man Mountain Anomaly at Mirdita 38.5 5 65.0 0.6 9.0 0.3 48.4 2.7  August 20, 2008… Tirex Resources Identifies Large New Prospective VMS Areas at Mirdita  July 14, 2008… Tirex Resources Expands Koshaj Deposit at Mirdita Including  July 9, 2008… 38.5 42.2 3.7 0.8 16.3 Tirex Resources Commences Drilling of Large Historic Mine Area at Mirdita 0.9 118.6 8.3  June 16, 2008… Tirex Resources Adds 3rd Drill to Mirdita Project Including  June 12, 2008… 40.4 41.2 0.8 1.4 Tirex Intersects 16.0m of 1% Cu, 5.2% Zn, 11 g/t Ag and 1.7 g/t Au 53.8 2.2 369.6 29.5  May 23, 2008… Tirex Resources Arranges Additional Financing Including  May 22, 2008… Tirex Resources Arranges Financing 52.8 66.9 14.1 0.9 11.6 1.0 141.6 5.5  May 15, 2008… Dr. C. Tucker Barrie Joins Dr. Allan R Miller’s Strong Technical Team at Mirdita Including  May 08, 2008… Tirex Resources Begins Drilling Gurthi South 63.8 66.9 3.1 2.3 34.8 2.4 376.1 14.6  May 01, 2008… Tirex Resources Intersects 60 Metres of Strong Mineralization at Mirdita  April 01, 2008… Including Tirex Resources Update: Assays Pending and Second Drill Now Working at Mirdita 103.  March 06, 2008 … Tirex Announces Arrival76.0nd Drill in Albania of 2 5 27.5 0.8 12.5 0.1 13.0 2.2  March 03, 2008 … Tirex Announces Assay Results from First Drill hole at Mirdita  February 13, 2008 … Tirex Intersects Mineralization on First Drill Hole, Assays to Follow  January 28, 2008 … Tirex Resources Announces Start of Drilling in Albania  January 14, 2008 … Tirex Resources Announces Arrival of Drill in Albania
  26. 26. RICH MINING HISTORY 1950-1992: State run exploration by Soviet, Chinese and Albanians discovered most of the known deposits Mined over 10 million tonnes of copper-bearing rock of unspecified grade from areas on and near the property Zinc not mined despite high grades due to a lack of processing facilities. Gold production kept a state secret Only limited modern exploration Early 2007, Tirex flew the first airborne electromagnetic survey in Albania and identified 102 geophysical anomalies, most previously undrilled
  27. 27. Base Camp Now Constructed, Close to Initial Drill Sites
  28. 28. Three Drills Now Turning!
  29. 29. MUNELLE – GURTHI AREA NORTHERN MIRDITA PROPERTY
  30. 30. FUTURE PLANS EXPLORATION Phase 1 drilling at Koshaj and at Gurthi South No. 2 is complete. Very high grade, gold-rich VMS was encountered in Phase 1. Phase 2 is now planned to further define and expand these zones. First hole at Letitna encountered 61.5m (true width) of strong mineralization. Multiple holes planned to follow up on this excellent intersection in Phase 2. Multiple holes are planned to test previously undrilled geophysical anomalies, with the opportunity for discovery during Phase 2. Ground geophysical work is ongoing Major growth planned through the exploration of known deposits and high priority exploration targets
  31. 31. CORPORATE Strong administrative and technical teams in place in both Canada and Albania Board of Directors with a history of significant wealth creation in the exploration and development space Strong financial backing by the EBRD, important in these turbulent times Company is well funded to execute exploration plans with a major financial backer in place
  32. 32. SUMMARY A CONFLUENCE OF OPPORTUNITIES An entire under-explored VMS District with World Class potential in southern Europe Previously unknown strong gold and silver component to District now discovered Strong administrative and marketing teams in place in both North America and Europe Veteran technical team on the project utilizing state-of-the-art exploration technology Strong gold prices
  33. 33. Thank you! Tirex Resources Ltd. 5052 Victoria Drive, Vancouver, BC, V5P 3T8 T: 604-687-7160 F: 604-687-7165 www.tirexresources.com info@tirexresources.com

×