Your SlideShare is downloading. ×
0
Integrated Railway Transport Management System
Integrated Railway Transport Management System
Integrated Railway Transport Management System
Integrated Railway Transport Management System
Integrated Railway Transport Management System
Integrated Railway Transport Management System
Integrated Railway Transport Management System
Integrated Railway Transport Management System
Integrated Railway Transport Management System
Integrated Railway Transport Management System
Integrated Railway Transport Management System
Integrated Railway Transport Management System
Integrated Railway Transport Management System
Integrated Railway Transport Management System
Integrated Railway Transport Management System
Integrated Railway Transport Management System
Upcoming SlideShare
Loading in...5
×

Thanks for flagging this SlideShare!

Oops! An error has occurred.

×
Saving this for later? Get the SlideShare app to save on your phone or tablet. Read anywhere, anytime – even offline.
Text the download link to your phone
Standard text messaging rates apply

Integrated Railway Transport Management System

1,049

Published on

SIS Group Int. offers a reliable integrated railway transport management system. The system increases railway safety, controllability, carrying capacity.

SIS Group Int. offers a reliable integrated railway transport management system. The system increases railway safety, controllability, carrying capacity.

Published in: Technology, Business
0 Comments
2 Likes
Statistics
Notes
  • Be the first to comment

No Downloads
Views
Total Views
1,049
On Slideshare
0
From Embeds
0
Number of Embeds
0
Actions
Shares
0
Downloads
32
Comments
0
Likes
2
Embeds 0
No embeds

Report content
Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
No notes for slide

Transcript

  • 1. Integrated Railway Transport Management System <br />
  • 2. SIS Integrated Railway Transport Management System <br />Management<br />Automation<br />Telephony<br />Video<br />Open <br />Transport <br />Network <br />(OTN)<br />Automation<br />ACS of <br />Railway<br />transport<br />IPData <br />Transfer<br />Network<br />Data<br />Centers<br />Dispatch<br />Control<br />Networking<br />Telephony<br />Video <br />Surveillance<br />GSM-R<br />FOC<br /> IP<br />
  • 3. SIS Integrated Railway Transport Management System<br />Safety<br />Manageability<br />Transport Capacity<br />
  • 4. SIS Integrated Railway Transport Management System<br />Country <br />Boarder<br />GSM-R<br />GSM-R<br />GSM-R<br />Neighboring Country<br />Boarder Station<br />Control Center<br />Small Station<br />Large Station<br />Transport Network based on OTN/SDH<br />Neighboring country<br />ACS<br />ACS<br />Dispatch Control<br />Automation<br />Telephony<br />Video<br />
  • 5. SIS Integrated Railway Transport Management System<br />Country <br />Boarder<br />GSM-R<br />GSM-R<br />GSM-R<br />Coverage of the whole railway infrastructure<br />Neighboring Country<br />Boarder Station<br />Control Center<br />Small Station<br />Large Station<br />Transport Network based on OTN/SDH<br />Neighboring country<br />ACS<br />ACS<br />Dispatch Control<br />Automation<br />Telephony<br />Video<br />
  • 6. SIS Integrated Railway Transport Management System<br />Interaction with external systems<br />External <br />systems<br />International Carriage Planning<br />АСS of neighboring Countries<br />ACS<br />Train Ferries Management Systems<br />Dispatch Control <br />Customs<br />Automation<br />Telephony<br />Financial Systems<br />Video<br />Power Transmission System<br />
  • 7. SIS Integrated Railway Transport Management System<br />Reliability<br />The SIS Integrated Railway Transport Management System<br />is protected against failures<br />
  • 8. SIS Integrated Railway Transport Management System<br />Back up communication channel<br />Primary <br />Data Center<br />LAN<br />Back up Data Center<br />Control Center<br />GSM-R<br />OTN/SDH<br />StationN<br />Station1<br />Cable Break Protection<br />ACS<br />ACS<br />Dispatch Control<br />Dispatch Control<br />Automation<br />Automation<br />Telephony<br />Telephony<br />Video Surveillance<br />Video Surveillance<br />
  • 9. SIS Integrated Railway Transport Management System<br />Managing via the back up <br />communication channel<br />Primary <br />Data Center<br />LAN<br />Back up Data Center<br />Control Center<br />GSM-R<br />OTN/SDH OTN/SDH<br />StationN<br />Station1<br />Infrastructure<br />or<br />Nature<br />Catastrophe<br />ACS<br />ACS<br />Dispatch Control<br />Dispatch Control<br />Automation<br />Automation<br />Telephony<br />Telephony<br />Video Surveillance<br />Video Surveillance<br />
  • 10. SIS Integrated Railway Transport Management System<br />Mirroring of major Network Functions <br />Control Center<br />Network<br />GSM-R<br />Enterprise<br />Telephony<br />Dispatcher<br />Station Duty Officer<br />Networking <br />Failure<br />
  • 11. SIS Integrated Railway Transport Management System<br />Switch to Enterprise Telephony<br />Network <br />failure<br />Control Center<br />Network<br />GSM-R<br />Enterprise<br />Telephony<br />Dispatcher<br />Station Officer<br />
  • 12. SIS Integrated Railway Transport Management System<br />Key Solutions<br />WE OFFER SOLUTIONS<br />www.sis-group.com<br />
  • 13. Transfer Control<br />Scheduling<br />(Cargo Transportation, <br />Traffic, Repair) <br />Cargo<br />Transfer <br />order<br />Scheduling<br />Cargo Life Cycle/<br />Optimization <br />Monitoring<br />Cargo Pricing<br />Carriage<br />Identification<br />System<br />Management and Control<br />Dispatch<br />Control <br />Order Execution<br />
  • 14. SIS Integrated Railway Transport Management System<br />Execution<br />Scheduling<br />Dispatch Control<br />Carriage Transit<br />Video<br />Hot Box<br />Switches, Traffic Lights…<br />Power Supply<br />Communication with the Operator and the Locomotive Driver<br />
  • 15. SIS Integrated Railway Transport Management System<br />Benefits<br />Reliability<br />Increase<br />Profit Increase<br />Orders Quantity Increase<br />Transport Speed Increase<br />
  • 16. SIS Integrated Railway Transport Management System<br />Implementation Stages <br />Detailed Technical Design<br />Draft Design<br />Concept <br />Implementation<br />Maintenance <br />
  • 17. Contact<br />Let’s work together!<br />Andrei Ponomarev <br />Chief Business Development Officer<br />SIS Group International<br />ul. Odoyevskogo, 131<br />220015, Minsk, Belarus<br />Phone: +375 (17) 259 13 09<br />Fax:     +375 (17) 259 13 00<br />Mobile: +375 (29) 7600209<br />E-mail: andrei.ponomarev@sis.com.by<br />www.sis-group.com<br />

×