Competitive wind turbine drive trains
    through representative testing
    Dr. Stefan Lammens, Vice President – Chief Sales & Marketing Officer
    Wind Power Technology                                                  A brand of ZF




                                                                                           © ZF Friedrichshafen AG, 2012
1                      Presentation Title, Date
                       OWI-Lab, 27/09/2012                                 A brand of ZF
Combination of ZF and Hansen
                                                                                                               +




    Customers




    Products
                    2 MW                       1,5 MW to 6,15 MW




     Regions




                 Gainesville, USA                                                                        Gainesville, USA         Lommel, Belgium
    Production                                               Lommel, Belgium

    Locations




                                                                                                                                                                           © ZF Friedrichshafen AG, 2012
                                       Coimbatore, India      Tianjin, China                            Coimbatore, India         Tianjin, China


                                                           Source: ZF; Hansen Transmission Annual Report 2011, 31.03.11 and Annual Report 2010, 31.03.10


2                                   OWI-Lab, 27/09/2012                                                                                                    A brand of ZF
The Business Unit Wind Power Technology is
                     part of the Industrial Technology Division of ZF

    ZF Friedrichshafen AG               Shareholders: 93.8 % Zeppelin Foundation and 6.2 % Dr. Jürgen and Irmgard Ulderup Foundation


                               Division                 Division                  Division                  Division                    Joint Venture
                                                                                                                                        Steering Systems     4)
                               Powertrain               Chassis                   Commercial Vehicle        Industrial
                               Technology               Technology                Technology                Technology                  50 %
    CEO, Market

                               Transmissions            Chassis Systems           Truck & Van               Construction                Passenger Car
                                                                                  Driveline Technology      Machinery Systems           Steering Systems
    Finance,                   Axle Drives              Chassis
                                                        Components                Bus Driveline             Agricultural                Commercial Vehicle
    Controlling,
                               Powertrain Modules                                 Technology                Machinery Systems           Steering Systems
    IT, Process Management
                                                        Rubber & Plastics
                                                                                  CV Axle Systems           Material Handling           Passenger Car
    Human Resources                                                                                                                     Steering Columns
                                                        Suspension                                          Systems
                                                        Technology                CV Chassis Modules
                                                                                                            Test Systems                Global Aftermarket
                                                                                  CV Damper
    Materials Management                                                          Technology                Special Driveline
                                                                                                            Technology
                                                                                  CV Powertrain
                                                                                  Modules                   Electronic Systems
    Operations and
    Technology                                                                                              Marine Propulsion
                                                                                                            Systems

    Compliance 1)                                                                                           Aviation Technology

    Die Casting Technology2)                                                                                Wind Power
                                                                                                            Technology




                                                                                                                                                                     © ZF Friedrichshafen AG, 2012
    ZF Services 3)


       Board of Management        Organizational unit    1) linked to CEO                                4) ZF Lenksysteme GmbH is a joint venture between
                                                         2) linked to Materials Management domain           ZF Friedrichshafen AG and Robert Bosch GmbH.
       Integration of Hansen       Partial activities    3) linked to Market domain
       Transmissions               in wind power

3                                            OWI-Lab, 27/09/2012                                                                                     A brand of ZF
Key Figures
                         2011 Group
    The ZF Group – An Overview                                   2011    2011/2010

                          Sales                       € 15,509 million        20 %


                          Employees (end of year)              71,488         11 %


                          Capital expenditure          € 1,058 million        82 %


                          R&D expenditure                € 754 million        17 %


                          121 production companies in 27 countries


                          8 main development locations in 4 countries




                                                                                                © ZF Friedrichshafen AG, 2012
                          34 service companies and more than 650 service partners


4                        OWI-Lab, 27/09/2012                                    A brand of ZF
Wind Market Segments

                            Global Annual Market Installations (in GW)
60 GW
                                                 Onshore         Offshore                                        6.3
                                                                                                   5.6
50 GW
                                                                                       4.9
                                                           2.0                 3.9
                                               0.8                     2.9
40 GW                                 1.5
                           0.6

30 GW
                  0.2
                                                                                                  49.7          52.8
                                                       45.8                   43.4    46.0
20 GW      0.2                        37.9     40.5                   41.1
                          37.6
                  28.2
10 GW      19.8

    0 GW
           2007   2008    2009        2010    2011     2012e          2013e   2014e   2015e      2016e         2017e

 Offshore wind power technology is still in the emerging stage and larger, more efficient turbines
  along with optimization of the nascent supply chain have large potential for reducing Cost of Energy
  (CoE)
 Reducing CoE of offshore wind will help wind to become a base-load production for the grid in mid-




                                                                                                                                  © ZF Friedrichshafen AG, 2012
  long term
 Flemish stakeholders take a pioneering role in offshore innovations and developments
                                                                                         Source: ZF WPT Market Intelligence

5                                OWI-Lab, 27/09/2012                                                              A brand of ZF
CoE Reductions Critical to Competitiveness


    Wind competitive with fossil fuels                                 Cost of Energy (EUR/MWh)

                                                                        Cost of Energy (CoE) is defined as:




                                                                        Onshore
                                                                            A reduction of 10% in onshore wind CoE will
                                                                             make it directly competitive with natural gas at
                                                                             today’s lower energy prices



                                                                        Offshore
                                                                            As wind farms are installed at sites further from
                                                                             shore and in deeper water, the industry will have
                                                                             to work hard to decrease current levels of
                                                                             CAPEX per megawatt installed




                                                                                                                                                   © ZF Friedrichshafen AG, 2012
    Note: NG prices = USD 4.00-6.75/MMBTU, Coal = USD 1.60-
    1.70.MMBTU, onshore wind capacity factor = 30%, no CO2 costs for
    fossil technology, EUR = 1.45 USD.
    Source, MAKE, Lazard, others
                                                                                         Source: MAKE Consulting, ZF WPT Market Intelligence

6                                          OWI-Lab, 27/09/2012                                                                     A brand of ZF
Impact of gearboxes on CoE


    Offshore Wind Cost Drivers                         Offshore CAPEX structure

                                                                                          Others         Preparational
                                                            Management        Insurance    1%               Work
                                                                  2%             2%                           1%
                                                           Contingencies
                                                                  3%
                                                       Electrical Grid
                                                             6%
 CAPEX impact of a gearbox is limited within a
                                                       Substation                                        Foundations
  typical offshore project, however, turbine
                                                          6%                                                26%
  suppliers are continually looking for ways to
  reduce component weight and material
  usage
                                                                Installations Vessels
                                                                         18%
 Not the offshore environment is changing wind
                                                                                            Other Turbine
  turbine gearbox specifications, but the                                                   Components
  challenges in O&M are emphasizing the                                                         31%
  importance of reliability, with a direct impact on
  OPEX and AEP




                                                                                                                                        © ZF Friedrichshafen AG, 2012
                                                                    Gearbox
                                                                      4%


                                                                              Source: MAKE Consulting, ZF WPT Market Intelligence

7                              OWI-Lab, 27/09/2012                                                                      A brand of ZF
Our mission

       We reduce the kWh cost of renewable energy


 We develop competitive products with      proven reliability
     to lower costs of unplanned OPEX
     to guarantee AEP by increased availability




                                                                                 © ZF Friedrichshafen AG, 2012
8                     OWI-Lab, 27/09/2012                        A brand of ZF
Trends in drive train technology


    Diversity in solutions on the market
 Search for the lowest CoE yields various           Mechanical power transfer:
  industrial solutions for the drive train,               gearbox
  being a trade-off between all design
  drivers:                                                hydraulic converter

        reliability                                 Electrical generator
        weight and cost                                  gear driven or direct drive ?
        efficiency                                       high speed, medium speed, low speed ?
        serviceability                                   traditional or permanent magnet
                                                           generator ?
        grid compatibility
                                                     Power conversion / transfer
                                                          low, medium, high voltage ?
                                                          AC or DC ?




                                                                                                             © ZF Friedrichshafen AG, 2012
    All published solutions claim to be winners,
    but few are proven by test and experience
9                             OWI-Lab, 27/09/2012                                            A brand of ZF
Representative testing


 Representative testing is key to proof reliability of our competitive designs


Logistic complexity and uncontrolled              What ?
 environment of a wind turbine makes
 it a tough ‘test lab’


Short time-to-market requirements in
 new developments put time pressure
 on field validation campaign
                                                            Start the turbine !


Representative (lab) testing
 capabilities are a long-term key




                                                                                                  © ZF Friedrichshafen AG, 2012
 differentiator of ZF WP



10                     OWI-Lab, 27/09/2012                                        A brand of ZF
Representative testing




                             It is possible to
                             transform wind
                           turbine behaviour
                                into test rig
                               conditions…




                                                            © ZF Friedrichshafen AG, 2012
11   OWI-Lab, 27/09/2012                    A brand of ZF
Hansen Transmissions International
                  Evolution of wind turbines and testing procedures

                                                                       ZF WP Capability       ZF WP DORoTe

                                                                                     Dynamic Testing @
                                                                                     ZF WP 13.2 MW Test Bench

                                             Industry Standard   Overload Prototype Testing

100% Serial testing, first at partial, later at full load

1970                           1980                1990             2000                        2010                2020




                                                                                                                             © ZF Friedrichshafen AG, 2012
     ZF WP is continuously improving its testing procedures by implementing ZF WP
                           specific dynamic testing methods
* Indicative Numbers & years
12                                    OWI-Lab, 27/09/2012                                                    A brand of ZF
Design verification proving reliability

                                          Technology/
                                            Materials
                                           Verification




                                                          Reliable Designs
                                        Component and
            State-of-the-art
                                        Sub-assembly
             Design Tools



                                         Verification



                                           Gearbox
                                          Verification




                                              Field




                                                                             © ZF Friedrichshafen AG, 2012
                                           Verification


13                             OWI-Lab, 27/09/2012          A brand of ZF
Component and Sub-assembly Verification

 ZF WP’s dynamic bearing
  system test rig
      testing real size bearings
      in their actual arrangement
       as built in the gearbox
      under representative wind
       turbine loading and
       operational conditions




                                                                                               © ZF Friedrichshafen AG, 2012
      This pro-active testing method contributes largely to the design of robust
                  bearing arrangements for new reliable gearboxes


14                        OWI-Lab, 27/09/2012                                  A brand of ZF
Gearbox Verification




                                 Motor       GB1     GB2 Generator

                    ZF WP’s 13.2 MW / 16.8 MW Dynamic Test Rig
     -   13.2 MW rated power        -    1500 RPM nom speed     -    1000 tons of steel
     -   16.8 MW peak power         -    2600 RPM max speed     -    1000 tons of concrete




                                                                                                        © ZF Friedrichshafen AG, 2012
     -   Investment                 -    80 kNm at motors       -    35m x 10m
         > 10 M EUR                                             -    100% Availability (24/7)

15                             OWI-Lab, 27/09/2012                                      A brand of ZF
Next steps in representative testing

 From gearbox verification to complete drive train / wind turbine testing

Need for more large scale test infrastructure and
 prototype field testing
Research topics
     •   make tests even more representative by correlation
         between field and test rig conditions
     •   increase acceleration factor for life testing on test rigs




New conditions require dedicated testing
     •   cold / hot climate          OWI climate chamber
     •   offshore                    e.g. corrosion testing




                                                                                        © ZF Friedrichshafen AG, 2012
     •   grid codes                  e.g. grid compatibility testing



16                              OWI-Lab, 27/09/2012                     A brand of ZF
Additional leverage to reduce CoE


 Minimise OPEX and optimise availability in our service offering




                                                                                   © ZF Friedrichshafen AG, 2012
17                       OWI-Lab, 27/09/2012                       A brand of ZF
Additional leverage to reduce CoE


 Minimise OPEX and optimise availability in our service offering



O&M business is evolving rapidly
ZF has a global footprint for offering service solutions for wind turbine
 gearboxes
 Our unique gearbox know-how and large installed gearbox base will enable
     intelligent preventive maintenance



 Research challenge: innovation in performance and condition monitoring
       create wind turbine data sets (SCADA, CMS, …)
       develop intelligent processing algorithms




                                                                                             © ZF Friedrichshafen AG, 2012
       merge measurements and algorithms into added value for O&M



18                            OWI-Lab, 27/09/2012                            A brand of ZF
Conclusions


 ZF contributes to further proof competitive wind energy technology

 Wind energy has grown significantly during last decades
 Further CoE reduction will support wind to gain share in future energy mix, where
  offshore wind is still emerging
 Proven reliability contributes to lower OPEX and higher AEP
     •   Representative testing is key
     •   ZF WP emphasizes this with large test capabilities
     •   Next steps to focus on further improvement and expansion of test infrastructure


 Additional leverage to reduce CoE by using intelligent preventive maintenance as
  part of our service solution


 More and larger scale testing is better affordable in public test infrastructure (e.g.
  OWI), where governmental support increases regional competitiveness and
  contributes globally to stimulate renewable energy




                                                                                                           © ZF Friedrichshafen AG, 2012
19                            OWI-Lab, 27/09/2012                                          A brand of ZF
Thank you very much for your attention!




                                                        © ZF Friedrichshafen AG, 2012
20   Presentation Title, Date
     OWI-Lab, 27/09/2012                A brand of ZF

More Related Content

What's hot

Aras How To Think About Aras Integrations
Aras How To Think About Aras IntegrationsAras How To Think About Aras Integrations
Aras How To Think About Aras IntegrationsProdeos
 
120919 digitalkonferansen tore bjerke
120919 digitalkonferansen tore bjerke120919 digitalkonferansen tore bjerke
120919 digitalkonferansen tore bjerkeDigin
 
Otm con8923 pdf_8923_0002
Otm con8923 pdf_8923_0002Otm con8923 pdf_8923_0002
Otm con8923 pdf_8923_0002jucaab
 
Next-Gen Data Center: Improving TCO & ROI in Data Centers Through Virtualizat...
Next-Gen Data Center: Improving TCO & ROI in Data Centers Through Virtualizat...Next-Gen Data Center: Improving TCO & ROI in Data Centers Through Virtualizat...
Next-Gen Data Center: Improving TCO & ROI in Data Centers Through Virtualizat...IMEX Research
 
Nevmug Emc January 2009
Nevmug   Emc January 2009Nevmug   Emc January 2009
Nevmug Emc January 2009csharney
 
Blade Servers & Virtualization State of the Industry
Blade Servers & Virtualization State of the IndustryBlade Servers & Virtualization State of the Industry
Blade Servers & Virtualization State of the IndustryIMEX Research
 
Blade Servers & Virtualization: State of the Industry
Blade Servers & Virtualization: State of the IndustryBlade Servers & Virtualization: State of the Industry
Blade Servers & Virtualization: State of the IndustryIMEX Research
 
Aras PLM Software Integration Basics
Aras PLM Software Integration BasicsAras PLM Software Integration Basics
Aras PLM Software Integration BasicsAras
 
Stephen Bryant Visual CV Resume 2013
Stephen Bryant Visual CV Resume 2013Stephen Bryant Visual CV Resume 2013
Stephen Bryant Visual CV Resume 2013Stephen Bryant
 
CMC Research Presentation
CMC Research PresentationCMC Research Presentation
CMC Research Presentationfinance21
 
Omnikron Services 2009
Omnikron Services 2009Omnikron Services 2009
Omnikron Services 2009Robin Borough
 
IT Portfolio Management - lower the entry barriers with LeanIX
IT Portfolio Management - lower the entry barriers with LeanIXIT Portfolio Management - lower the entry barriers with LeanIX
IT Portfolio Management - lower the entry barriers with LeanIXLeanIX GmbH
 
OEL Group Overview
OEL Group OverviewOEL Group Overview
OEL Group OverviewHassanasheg
 
Transnet’S Competitive Supplier Development Program (Csdp)
Transnet’S Competitive Supplier Development Program (Csdp)Transnet’S Competitive Supplier Development Program (Csdp)
Transnet’S Competitive Supplier Development Program (Csdp)Railways and Harbours
 
Cloud services zimbabwe
Cloud services   zimbabweCloud services   zimbabwe
Cloud services zimbabweTechZim
 
Siemens Rail Services. Customized service solutions for rail systems
Siemens Rail Services. Customized service solutions for rail systemsSiemens Rail Services. Customized service solutions for rail systems
Siemens Rail Services. Customized service solutions for rail systemsRollingOnRails
 
ABB Consulting and Full Service-The road to efficiency and reliability-april2013
ABB Consulting and Full Service-The road to efficiency and reliability-april2013ABB Consulting and Full Service-The road to efficiency and reliability-april2013
ABB Consulting and Full Service-The road to efficiency and reliability-april2013Sammy Saba
 
EMC Cloud Computing Casee Studies for Zimbabwe breakfast briefing by Grant Mu...
EMC Cloud Computing Casee Studies for Zimbabwe breakfast briefing by Grant Mu...EMC Cloud Computing Casee Studies for Zimbabwe breakfast briefing by Grant Mu...
EMC Cloud Computing Casee Studies for Zimbabwe breakfast briefing by Grant Mu...TechZim
 
Emc - Cloud Vision and Strategy
Emc - Cloud Vision and StrategyEmc - Cloud Vision and Strategy
Emc - Cloud Vision and StrategyCenk Ersoy
 

What's hot (20)

Aras How To Think About Aras Integrations
Aras How To Think About Aras IntegrationsAras How To Think About Aras Integrations
Aras How To Think About Aras Integrations
 
102 1600-1630
102 1600-1630102 1600-1630
102 1600-1630
 
120919 digitalkonferansen tore bjerke
120919 digitalkonferansen tore bjerke120919 digitalkonferansen tore bjerke
120919 digitalkonferansen tore bjerke
 
Otm con8923 pdf_8923_0002
Otm con8923 pdf_8923_0002Otm con8923 pdf_8923_0002
Otm con8923 pdf_8923_0002
 
Next-Gen Data Center: Improving TCO & ROI in Data Centers Through Virtualizat...
Next-Gen Data Center: Improving TCO & ROI in Data Centers Through Virtualizat...Next-Gen Data Center: Improving TCO & ROI in Data Centers Through Virtualizat...
Next-Gen Data Center: Improving TCO & ROI in Data Centers Through Virtualizat...
 
Nevmug Emc January 2009
Nevmug   Emc January 2009Nevmug   Emc January 2009
Nevmug Emc January 2009
 
Blade Servers & Virtualization State of the Industry
Blade Servers & Virtualization State of the IndustryBlade Servers & Virtualization State of the Industry
Blade Servers & Virtualization State of the Industry
 
Blade Servers & Virtualization: State of the Industry
Blade Servers & Virtualization: State of the IndustryBlade Servers & Virtualization: State of the Industry
Blade Servers & Virtualization: State of the Industry
 
Aras PLM Software Integration Basics
Aras PLM Software Integration BasicsAras PLM Software Integration Basics
Aras PLM Software Integration Basics
 
Stephen Bryant Visual CV Resume 2013
Stephen Bryant Visual CV Resume 2013Stephen Bryant Visual CV Resume 2013
Stephen Bryant Visual CV Resume 2013
 
CMC Research Presentation
CMC Research PresentationCMC Research Presentation
CMC Research Presentation
 
Omnikron Services 2009
Omnikron Services 2009Omnikron Services 2009
Omnikron Services 2009
 
IT Portfolio Management - lower the entry barriers with LeanIX
IT Portfolio Management - lower the entry barriers with LeanIXIT Portfolio Management - lower the entry barriers with LeanIX
IT Portfolio Management - lower the entry barriers with LeanIX
 
OEL Group Overview
OEL Group OverviewOEL Group Overview
OEL Group Overview
 
Transnet’S Competitive Supplier Development Program (Csdp)
Transnet’S Competitive Supplier Development Program (Csdp)Transnet’S Competitive Supplier Development Program (Csdp)
Transnet’S Competitive Supplier Development Program (Csdp)
 
Cloud services zimbabwe
Cloud services   zimbabweCloud services   zimbabwe
Cloud services zimbabwe
 
Siemens Rail Services. Customized service solutions for rail systems
Siemens Rail Services. Customized service solutions for rail systemsSiemens Rail Services. Customized service solutions for rail systems
Siemens Rail Services. Customized service solutions for rail systems
 
ABB Consulting and Full Service-The road to efficiency and reliability-april2013
ABB Consulting and Full Service-The road to efficiency and reliability-april2013ABB Consulting and Full Service-The road to efficiency and reliability-april2013
ABB Consulting and Full Service-The road to efficiency and reliability-april2013
 
EMC Cloud Computing Casee Studies for Zimbabwe breakfast briefing by Grant Mu...
EMC Cloud Computing Casee Studies for Zimbabwe breakfast briefing by Grant Mu...EMC Cloud Computing Casee Studies for Zimbabwe breakfast briefing by Grant Mu...
EMC Cloud Computing Casee Studies for Zimbabwe breakfast briefing by Grant Mu...
 
Emc - Cloud Vision and Strategy
Emc - Cloud Vision and StrategyEmc - Cloud Vision and Strategy
Emc - Cloud Vision and Strategy
 

Similar to 2012 09-27 opening-owi-lab-zf

Axcend Corporate Presentation
Axcend Corporate PresentationAxcend Corporate Presentation
Axcend Corporate Presentationvinodpandeyaxcend
 
Technosoft modeling and simulation 2006 03-27 from craig
Technosoft modeling and simulation  2006 03-27 from craigTechnosoft modeling and simulation  2006 03-27 from craig
Technosoft modeling and simulation 2006 03-27 from craigkeyven
 
qualcomm annual reports 2003
qualcomm annual reports 2003qualcomm annual reports 2003
qualcomm annual reports 2003finance43
 
Corporate Brochure 2013
Corporate Brochure 2013Corporate Brochure 2013
Corporate Brochure 2013Uwe Kurfurst
 
Galil galil's new accelera controller; sizzling speed, fully loaded 2007 p...
Galil   galil's new accelera controller;  sizzling speed, fully loaded 2007 p...Galil   galil's new accelera controller;  sizzling speed, fully loaded 2007 p...
Galil galil's new accelera controller; sizzling speed, fully loaded 2007 p...Electromate
 
Hisham Dalle - Zero client computing - taking the desktop into the cloud
Hisham Dalle - Zero client computing - taking the desktop into the cloudHisham Dalle - Zero client computing - taking the desktop into the cloud
Hisham Dalle - Zero client computing - taking the desktop into the cloudnooralmousa
 
Designing and testing software define cars
Designing and testing software define carsDesigning and testing software define cars
Designing and testing software define carsThorsten MAYER
 
Private cloud at BMW Group – An open approach
Private cloud at BMW Group – An open approach Private cloud at BMW Group – An open approach
Private cloud at BMW Group – An open approach Open Data Center Alliance
 
Reliability Driven Solutions, Llc 2011
Reliability Driven Solutions, Llc 2011Reliability Driven Solutions, Llc 2011
Reliability Driven Solutions, Llc 2011Ron McGary
 
Friedenthal.sandford
Friedenthal.sandfordFriedenthal.sandford
Friedenthal.sandfordNASAPMC
 
Utilities Datapower.2
Utilities Datapower.2Utilities Datapower.2
Utilities Datapower.2David White
 

Similar to 2012 09-27 opening-owi-lab-zf (20)

Best practices in dcs migration webcast
Best practices in dcs migration webcastBest practices in dcs migration webcast
Best practices in dcs migration webcast
 
Bombardier
BombardierBombardier
Bombardier
 
Automotive Services from Calsoftlabs
Automotive Services from CalsoftlabsAutomotive Services from Calsoftlabs
Automotive Services from Calsoftlabs
 
Axcend Corporate Presentation
Axcend Corporate PresentationAxcend Corporate Presentation
Axcend Corporate Presentation
 
Infor EAM ASE
Infor EAM ASEInfor EAM ASE
Infor EAM ASE
 
SmartConnect-Cloud
SmartConnect-CloudSmartConnect-Cloud
SmartConnect-Cloud
 
Technosoft modeling and simulation 2006 03-27 from craig
Technosoft modeling and simulation  2006 03-27 from craigTechnosoft modeling and simulation  2006 03-27 from craig
Technosoft modeling and simulation 2006 03-27 from craig
 
qualcomm annual reports 2003
qualcomm annual reports 2003qualcomm annual reports 2003
qualcomm annual reports 2003
 
Solution Manager Roadmaps
Solution Manager RoadmapsSolution Manager Roadmaps
Solution Manager Roadmaps
 
Corporate Brochure 2013
Corporate Brochure 2013Corporate Brochure 2013
Corporate Brochure 2013
 
Corporate Brochure 2013
Corporate Brochure 2013Corporate Brochure 2013
Corporate Brochure 2013
 
Galil galil's new accelera controller; sizzling speed, fully loaded 2007 p...
Galil   galil's new accelera controller;  sizzling speed, fully loaded 2007 p...Galil   galil's new accelera controller;  sizzling speed, fully loaded 2007 p...
Galil galil's new accelera controller; sizzling speed, fully loaded 2007 p...
 
Hisham Dalle - Zero client computing - taking the desktop into the cloud
Hisham Dalle - Zero client computing - taking the desktop into the cloudHisham Dalle - Zero client computing - taking the desktop into the cloud
Hisham Dalle - Zero client computing - taking the desktop into the cloud
 
ATSPL capabilities
ATSPL capabilitiesATSPL capabilities
ATSPL capabilities
 
Designing and testing software define cars
Designing and testing software define carsDesigning and testing software define cars
Designing and testing software define cars
 
Who Is Telvent DTN?
Who Is Telvent DTN?Who Is Telvent DTN?
Who Is Telvent DTN?
 
Private cloud at BMW Group – An open approach
Private cloud at BMW Group – An open approach Private cloud at BMW Group – An open approach
Private cloud at BMW Group – An open approach
 
Reliability Driven Solutions, Llc 2011
Reliability Driven Solutions, Llc 2011Reliability Driven Solutions, Llc 2011
Reliability Driven Solutions, Llc 2011
 
Friedenthal.sandford
Friedenthal.sandfordFriedenthal.sandford
Friedenthal.sandford
 
Utilities Datapower.2
Utilities Datapower.2Utilities Datapower.2
Utilities Datapower.2
 

More from Sirris

Presentation - webinar embedded machine learning
Presentation - webinar embedded machine learningPresentation - webinar embedded machine learning
Presentation - webinar embedded machine learningSirris
 
2 - Pattyn - Smart Products Webinar 03-02-2023.
2 - Pattyn - Smart Products Webinar 03-02-2023.2 - Pattyn - Smart Products Webinar 03-02-2023.
2 - Pattyn - Smart Products Webinar 03-02-2023.Sirris
 
2021 01-27 - webinar - Corrosie van 3D geprinte onderdelen
2021 01-27 - webinar - Corrosie van 3D geprinte onderdelen2021 01-27 - webinar - Corrosie van 3D geprinte onderdelen
2021 01-27 - webinar - Corrosie van 3D geprinte onderdelenSirris
 
2021/0/15 - Solarwinds supply chain attack: why we should take it sereously
2021/0/15 - Solarwinds supply chain attack: why we should take it sereously2021/0/15 - Solarwinds supply chain attack: why we should take it sereously
2021/0/15 - Solarwinds supply chain attack: why we should take it sereouslySirris
 
20200923 inside metal am webinar_laborelec
20200923 inside metal am webinar_laborelec20200923 inside metal am webinar_laborelec
20200923 inside metal am webinar_laborelecSirris
 
20200923 inside metal am webinar sirris-crm
20200923 inside metal am webinar sirris-crm20200923 inside metal am webinar sirris-crm
20200923 inside metal am webinar sirris-crmSirris
 
Challenges and solutions for improved durability of materials - Opin summary ...
Challenges and solutions for improved durability of materials - Opin summary ...Challenges and solutions for improved durability of materials - Opin summary ...
Challenges and solutions for improved durability of materials - Opin summary ...Sirris
 
Challenges and solutions for improved durability of materials - Hybrid joints...
Challenges and solutions for improved durability of materials - Hybrid joints...Challenges and solutions for improved durability of materials - Hybrid joints...
Challenges and solutions for improved durability of materials - Hybrid joints...Sirris
 
Challenges and solutions for improved durability of materials - Corrosion mon...
Challenges and solutions for improved durability of materials - Corrosion mon...Challenges and solutions for improved durability of materials - Corrosion mon...
Challenges and solutions for improved durability of materials - Corrosion mon...Sirris
 
Challenges and solutions for improved durability of materials - Concrete in m...
Challenges and solutions for improved durability of materials - Concrete in m...Challenges and solutions for improved durability of materials - Concrete in m...
Challenges and solutions for improved durability of materials - Concrete in m...Sirris
 
Challenges and solutions for improved durability of materials - Coatings done...
Challenges and solutions for improved durability of materials - Coatings done...Challenges and solutions for improved durability of materials - Coatings done...
Challenges and solutions for improved durability of materials - Coatings done...Sirris
 
Futureproof by sirris- product of the future
Futureproof by sirris- product of the futureFutureproof by sirris- product of the future
Futureproof by sirris- product of the futureSirris
 
2018 11-07-verbinden-ongelijksoortige-materialen-hupico multimaterial welding
2018 11-07-verbinden-ongelijksoortige-materialen-hupico multimaterial welding2018 11-07-verbinden-ongelijksoortige-materialen-hupico multimaterial welding
2018 11-07-verbinden-ongelijksoortige-materialen-hupico multimaterial weldingSirris
 
2018 11-07-verbinden-ongelijksoortige-materialen-bil ongelijksoortige materia...
2018 11-07-verbinden-ongelijksoortige-materialen-bil ongelijksoortige materia...2018 11-07-verbinden-ongelijksoortige-materialen-bil ongelijksoortige materia...
2018 11-07-verbinden-ongelijksoortige-materialen-bil ongelijksoortige materia...Sirris
 
2018 11-07-verbinden-ongelijksoortige-materialen-sirris bil-flanders_make_mmj
2018 11-07-verbinden-ongelijksoortige-materialen-sirris bil-flanders_make_mmj2018 11-07-verbinden-ongelijksoortige-materialen-sirris bil-flanders_make_mmj
2018 11-07-verbinden-ongelijksoortige-materialen-sirris bil-flanders_make_mmjSirris
 
2018 11-07-verbinden-ongelijksoortige-materialen-ku leuven-lijmen
2018 11-07-verbinden-ongelijksoortige-materialen-ku leuven-lijmen2018 11-07-verbinden-ongelijksoortige-materialen-ku leuven-lijmen
2018 11-07-verbinden-ongelijksoortige-materialen-ku leuven-lijmenSirris
 
Slotevent ‘Verbinden van ongelijksoortige materialen’ - Lcv lasercladding for...
Slotevent ‘Verbinden van ongelijksoortige materialen’ - Lcv lasercladding for...Slotevent ‘Verbinden van ongelijksoortige materialen’ - Lcv lasercladding for...
Slotevent ‘Verbinden van ongelijksoortige materialen’ - Lcv lasercladding for...Sirris
 
Slotevent ‘Verbinden van ongelijksoortige materialen’ - Juno industries mecha...
Slotevent ‘Verbinden van ongelijksoortige materialen’ - Juno industries mecha...Slotevent ‘Verbinden van ongelijksoortige materialen’ - Juno industries mecha...
Slotevent ‘Verbinden van ongelijksoortige materialen’ - Juno industries mecha...Sirris
 
Slotevent ‘Verbinden van ongelijksoortige materialen’ - Castolin verbinden v...
Slotevent ‘Verbinden van ongelijksoortige materialen’ - Castolin  verbinden v...Slotevent ‘Verbinden van ongelijksoortige materialen’ - Castolin  verbinden v...
Slotevent ‘Verbinden van ongelijksoortige materialen’ - Castolin verbinden v...Sirris
 
Masterclass Mechatronics 4.0 - Indoor and outdoor localisation and positionin...
Masterclass Mechatronics 4.0 - Indoor and outdoor localisation and positionin...Masterclass Mechatronics 4.0 - Indoor and outdoor localisation and positionin...
Masterclass Mechatronics 4.0 - Indoor and outdoor localisation and positionin...Sirris
 

More from Sirris (20)

Presentation - webinar embedded machine learning
Presentation - webinar embedded machine learningPresentation - webinar embedded machine learning
Presentation - webinar embedded machine learning
 
2 - Pattyn - Smart Products Webinar 03-02-2023.
2 - Pattyn - Smart Products Webinar 03-02-2023.2 - Pattyn - Smart Products Webinar 03-02-2023.
2 - Pattyn - Smart Products Webinar 03-02-2023.
 
2021 01-27 - webinar - Corrosie van 3D geprinte onderdelen
2021 01-27 - webinar - Corrosie van 3D geprinte onderdelen2021 01-27 - webinar - Corrosie van 3D geprinte onderdelen
2021 01-27 - webinar - Corrosie van 3D geprinte onderdelen
 
2021/0/15 - Solarwinds supply chain attack: why we should take it sereously
2021/0/15 - Solarwinds supply chain attack: why we should take it sereously2021/0/15 - Solarwinds supply chain attack: why we should take it sereously
2021/0/15 - Solarwinds supply chain attack: why we should take it sereously
 
20200923 inside metal am webinar_laborelec
20200923 inside metal am webinar_laborelec20200923 inside metal am webinar_laborelec
20200923 inside metal am webinar_laborelec
 
20200923 inside metal am webinar sirris-crm
20200923 inside metal am webinar sirris-crm20200923 inside metal am webinar sirris-crm
20200923 inside metal am webinar sirris-crm
 
Challenges and solutions for improved durability of materials - Opin summary ...
Challenges and solutions for improved durability of materials - Opin summary ...Challenges and solutions for improved durability of materials - Opin summary ...
Challenges and solutions for improved durability of materials - Opin summary ...
 
Challenges and solutions for improved durability of materials - Hybrid joints...
Challenges and solutions for improved durability of materials - Hybrid joints...Challenges and solutions for improved durability of materials - Hybrid joints...
Challenges and solutions for improved durability of materials - Hybrid joints...
 
Challenges and solutions for improved durability of materials - Corrosion mon...
Challenges and solutions for improved durability of materials - Corrosion mon...Challenges and solutions for improved durability of materials - Corrosion mon...
Challenges and solutions for improved durability of materials - Corrosion mon...
 
Challenges and solutions for improved durability of materials - Concrete in m...
Challenges and solutions for improved durability of materials - Concrete in m...Challenges and solutions for improved durability of materials - Concrete in m...
Challenges and solutions for improved durability of materials - Concrete in m...
 
Challenges and solutions for improved durability of materials - Coatings done...
Challenges and solutions for improved durability of materials - Coatings done...Challenges and solutions for improved durability of materials - Coatings done...
Challenges and solutions for improved durability of materials - Coatings done...
 
Futureproof by sirris- product of the future
Futureproof by sirris- product of the futureFutureproof by sirris- product of the future
Futureproof by sirris- product of the future
 
2018 11-07-verbinden-ongelijksoortige-materialen-hupico multimaterial welding
2018 11-07-verbinden-ongelijksoortige-materialen-hupico multimaterial welding2018 11-07-verbinden-ongelijksoortige-materialen-hupico multimaterial welding
2018 11-07-verbinden-ongelijksoortige-materialen-hupico multimaterial welding
 
2018 11-07-verbinden-ongelijksoortige-materialen-bil ongelijksoortige materia...
2018 11-07-verbinden-ongelijksoortige-materialen-bil ongelijksoortige materia...2018 11-07-verbinden-ongelijksoortige-materialen-bil ongelijksoortige materia...
2018 11-07-verbinden-ongelijksoortige-materialen-bil ongelijksoortige materia...
 
2018 11-07-verbinden-ongelijksoortige-materialen-sirris bil-flanders_make_mmj
2018 11-07-verbinden-ongelijksoortige-materialen-sirris bil-flanders_make_mmj2018 11-07-verbinden-ongelijksoortige-materialen-sirris bil-flanders_make_mmj
2018 11-07-verbinden-ongelijksoortige-materialen-sirris bil-flanders_make_mmj
 
2018 11-07-verbinden-ongelijksoortige-materialen-ku leuven-lijmen
2018 11-07-verbinden-ongelijksoortige-materialen-ku leuven-lijmen2018 11-07-verbinden-ongelijksoortige-materialen-ku leuven-lijmen
2018 11-07-verbinden-ongelijksoortige-materialen-ku leuven-lijmen
 
Slotevent ‘Verbinden van ongelijksoortige materialen’ - Lcv lasercladding for...
Slotevent ‘Verbinden van ongelijksoortige materialen’ - Lcv lasercladding for...Slotevent ‘Verbinden van ongelijksoortige materialen’ - Lcv lasercladding for...
Slotevent ‘Verbinden van ongelijksoortige materialen’ - Lcv lasercladding for...
 
Slotevent ‘Verbinden van ongelijksoortige materialen’ - Juno industries mecha...
Slotevent ‘Verbinden van ongelijksoortige materialen’ - Juno industries mecha...Slotevent ‘Verbinden van ongelijksoortige materialen’ - Juno industries mecha...
Slotevent ‘Verbinden van ongelijksoortige materialen’ - Juno industries mecha...
 
Slotevent ‘Verbinden van ongelijksoortige materialen’ - Castolin verbinden v...
Slotevent ‘Verbinden van ongelijksoortige materialen’ - Castolin  verbinden v...Slotevent ‘Verbinden van ongelijksoortige materialen’ - Castolin  verbinden v...
Slotevent ‘Verbinden van ongelijksoortige materialen’ - Castolin verbinden v...
 
Masterclass Mechatronics 4.0 - Indoor and outdoor localisation and positionin...
Masterclass Mechatronics 4.0 - Indoor and outdoor localisation and positionin...Masterclass Mechatronics 4.0 - Indoor and outdoor localisation and positionin...
Masterclass Mechatronics 4.0 - Indoor and outdoor localisation and positionin...
 

Recently uploaded

Digital magic. A small project for controlling smart light bulbs.
Digital magic. A small project for controlling smart light bulbs.Digital magic. A small project for controlling smart light bulbs.
Digital magic. A small project for controlling smart light bulbs.francesco barbera
 
Machine Learning Model Validation (Aijun Zhang 2024).pdf
Machine Learning Model Validation (Aijun Zhang 2024).pdfMachine Learning Model Validation (Aijun Zhang 2024).pdf
Machine Learning Model Validation (Aijun Zhang 2024).pdfAijun Zhang
 
Using IESVE for Loads, Sizing and Heat Pump Modeling to Achieve Decarbonization
Using IESVE for Loads, Sizing and Heat Pump Modeling to Achieve DecarbonizationUsing IESVE for Loads, Sizing and Heat Pump Modeling to Achieve Decarbonization
Using IESVE for Loads, Sizing and Heat Pump Modeling to Achieve DecarbonizationIES VE
 
GenAI and AI GCC State of AI_Object Automation Inc
GenAI and AI GCC State of AI_Object Automation IncGenAI and AI GCC State of AI_Object Automation Inc
GenAI and AI GCC State of AI_Object Automation IncObject Automation
 
Cybersecurity Workshop #1.pptx
Cybersecurity Workshop #1.pptxCybersecurity Workshop #1.pptx
Cybersecurity Workshop #1.pptxGDSC PJATK
 
Designing A Time bound resource download URL
Designing A Time bound resource download URLDesigning A Time bound resource download URL
Designing A Time bound resource download URLRuncy Oommen
 
Meet the new FSP 3000 M-Flex800™
Meet the new FSP 3000 M-Flex800™Meet the new FSP 3000 M-Flex800™
Meet the new FSP 3000 M-Flex800™Adtran
 
IESVE Software for Florida Code Compliance Using ASHRAE 90.1-2019
IESVE Software for Florida Code Compliance Using ASHRAE 90.1-2019IESVE Software for Florida Code Compliance Using ASHRAE 90.1-2019
IESVE Software for Florida Code Compliance Using ASHRAE 90.1-2019IES VE
 
Things you didn't know you can use in your Salesforce
Things you didn't know you can use in your SalesforceThings you didn't know you can use in your Salesforce
Things you didn't know you can use in your SalesforceMartin Humpolec
 
20200723_insight_release_plan_v6.pdf20200723_insight_release_plan_v6.pdf
20200723_insight_release_plan_v6.pdf20200723_insight_release_plan_v6.pdf20200723_insight_release_plan_v6.pdf20200723_insight_release_plan_v6.pdf
20200723_insight_release_plan_v6.pdf20200723_insight_release_plan_v6.pdfJamie (Taka) Wang
 
Comparing Sidecar-less Service Mesh from Cilium and Istio
Comparing Sidecar-less Service Mesh from Cilium and IstioComparing Sidecar-less Service Mesh from Cilium and Istio
Comparing Sidecar-less Service Mesh from Cilium and IstioChristian Posta
 
UiPath Studio Web workshop series - Day 7
UiPath Studio Web workshop series - Day 7UiPath Studio Web workshop series - Day 7
UiPath Studio Web workshop series - Day 7DianaGray10
 
Bird eye's view on Camunda open source ecosystem
Bird eye's view on Camunda open source ecosystemBird eye's view on Camunda open source ecosystem
Bird eye's view on Camunda open source ecosystemAsko Soukka
 
Anypoint Code Builder , Google Pub sub connector and MuleSoft RPA
Anypoint Code Builder , Google Pub sub connector and MuleSoft RPAAnypoint Code Builder , Google Pub sub connector and MuleSoft RPA
Anypoint Code Builder , Google Pub sub connector and MuleSoft RPAshyamraj55
 
COMPUTER 10: Lesson 7 - File Storage and Online Collaboration
COMPUTER 10: Lesson 7 - File Storage and Online CollaborationCOMPUTER 10: Lesson 7 - File Storage and Online Collaboration
COMPUTER 10: Lesson 7 - File Storage and Online Collaborationbruanjhuli
 
Computer 10: Lesson 10 - Online Crimes and Hazards
Computer 10: Lesson 10 - Online Crimes and HazardsComputer 10: Lesson 10 - Online Crimes and Hazards
Computer 10: Lesson 10 - Online Crimes and HazardsSeth Reyes
 
Salesforce Miami User Group Event - 1st Quarter 2024
Salesforce Miami User Group Event - 1st Quarter 2024Salesforce Miami User Group Event - 1st Quarter 2024
Salesforce Miami User Group Event - 1st Quarter 2024SkyPlanner
 
Nanopower In Semiconductor Industry.pdf
Nanopower  In Semiconductor Industry.pdfNanopower  In Semiconductor Industry.pdf
Nanopower In Semiconductor Industry.pdfPedro Manuel
 
Do we need a new standard for visualizing the invisible?
Do we need a new standard for visualizing the invisible?Do we need a new standard for visualizing the invisible?
Do we need a new standard for visualizing the invisible?SANGHEE SHIN
 
COMPUTER 10 Lesson 8 - Building a Website
COMPUTER 10 Lesson 8 - Building a WebsiteCOMPUTER 10 Lesson 8 - Building a Website
COMPUTER 10 Lesson 8 - Building a Websitedgelyza
 

Recently uploaded (20)

Digital magic. A small project for controlling smart light bulbs.
Digital magic. A small project for controlling smart light bulbs.Digital magic. A small project for controlling smart light bulbs.
Digital magic. A small project for controlling smart light bulbs.
 
Machine Learning Model Validation (Aijun Zhang 2024).pdf
Machine Learning Model Validation (Aijun Zhang 2024).pdfMachine Learning Model Validation (Aijun Zhang 2024).pdf
Machine Learning Model Validation (Aijun Zhang 2024).pdf
 
Using IESVE for Loads, Sizing and Heat Pump Modeling to Achieve Decarbonization
Using IESVE for Loads, Sizing and Heat Pump Modeling to Achieve DecarbonizationUsing IESVE for Loads, Sizing and Heat Pump Modeling to Achieve Decarbonization
Using IESVE for Loads, Sizing and Heat Pump Modeling to Achieve Decarbonization
 
GenAI and AI GCC State of AI_Object Automation Inc
GenAI and AI GCC State of AI_Object Automation IncGenAI and AI GCC State of AI_Object Automation Inc
GenAI and AI GCC State of AI_Object Automation Inc
 
Cybersecurity Workshop #1.pptx
Cybersecurity Workshop #1.pptxCybersecurity Workshop #1.pptx
Cybersecurity Workshop #1.pptx
 
Designing A Time bound resource download URL
Designing A Time bound resource download URLDesigning A Time bound resource download URL
Designing A Time bound resource download URL
 
Meet the new FSP 3000 M-Flex800™
Meet the new FSP 3000 M-Flex800™Meet the new FSP 3000 M-Flex800™
Meet the new FSP 3000 M-Flex800™
 
IESVE Software for Florida Code Compliance Using ASHRAE 90.1-2019
IESVE Software for Florida Code Compliance Using ASHRAE 90.1-2019IESVE Software for Florida Code Compliance Using ASHRAE 90.1-2019
IESVE Software for Florida Code Compliance Using ASHRAE 90.1-2019
 
Things you didn't know you can use in your Salesforce
Things you didn't know you can use in your SalesforceThings you didn't know you can use in your Salesforce
Things you didn't know you can use in your Salesforce
 
20200723_insight_release_plan_v6.pdf20200723_insight_release_plan_v6.pdf
20200723_insight_release_plan_v6.pdf20200723_insight_release_plan_v6.pdf20200723_insight_release_plan_v6.pdf20200723_insight_release_plan_v6.pdf
20200723_insight_release_plan_v6.pdf20200723_insight_release_plan_v6.pdf
 
Comparing Sidecar-less Service Mesh from Cilium and Istio
Comparing Sidecar-less Service Mesh from Cilium and IstioComparing Sidecar-less Service Mesh from Cilium and Istio
Comparing Sidecar-less Service Mesh from Cilium and Istio
 
UiPath Studio Web workshop series - Day 7
UiPath Studio Web workshop series - Day 7UiPath Studio Web workshop series - Day 7
UiPath Studio Web workshop series - Day 7
 
Bird eye's view on Camunda open source ecosystem
Bird eye's view on Camunda open source ecosystemBird eye's view on Camunda open source ecosystem
Bird eye's view on Camunda open source ecosystem
 
Anypoint Code Builder , Google Pub sub connector and MuleSoft RPA
Anypoint Code Builder , Google Pub sub connector and MuleSoft RPAAnypoint Code Builder , Google Pub sub connector and MuleSoft RPA
Anypoint Code Builder , Google Pub sub connector and MuleSoft RPA
 
COMPUTER 10: Lesson 7 - File Storage and Online Collaboration
COMPUTER 10: Lesson 7 - File Storage and Online CollaborationCOMPUTER 10: Lesson 7 - File Storage and Online Collaboration
COMPUTER 10: Lesson 7 - File Storage and Online Collaboration
 
Computer 10: Lesson 10 - Online Crimes and Hazards
Computer 10: Lesson 10 - Online Crimes and HazardsComputer 10: Lesson 10 - Online Crimes and Hazards
Computer 10: Lesson 10 - Online Crimes and Hazards
 
Salesforce Miami User Group Event - 1st Quarter 2024
Salesforce Miami User Group Event - 1st Quarter 2024Salesforce Miami User Group Event - 1st Quarter 2024
Salesforce Miami User Group Event - 1st Quarter 2024
 
Nanopower In Semiconductor Industry.pdf
Nanopower  In Semiconductor Industry.pdfNanopower  In Semiconductor Industry.pdf
Nanopower In Semiconductor Industry.pdf
 
Do we need a new standard for visualizing the invisible?
Do we need a new standard for visualizing the invisible?Do we need a new standard for visualizing the invisible?
Do we need a new standard for visualizing the invisible?
 
COMPUTER 10 Lesson 8 - Building a Website
COMPUTER 10 Lesson 8 - Building a WebsiteCOMPUTER 10 Lesson 8 - Building a Website
COMPUTER 10 Lesson 8 - Building a Website
 

2012 09-27 opening-owi-lab-zf

  • 1. Competitive wind turbine drive trains through representative testing Dr. Stefan Lammens, Vice President – Chief Sales & Marketing Officer Wind Power Technology A brand of ZF © ZF Friedrichshafen AG, 2012 1 Presentation Title, Date OWI-Lab, 27/09/2012 A brand of ZF
  • 2. Combination of ZF and Hansen + Customers Products 2 MW 1,5 MW to 6,15 MW Regions Gainesville, USA Gainesville, USA Lommel, Belgium Production Lommel, Belgium Locations © ZF Friedrichshafen AG, 2012 Coimbatore, India Tianjin, China Coimbatore, India Tianjin, China Source: ZF; Hansen Transmission Annual Report 2011, 31.03.11 and Annual Report 2010, 31.03.10 2 OWI-Lab, 27/09/2012 A brand of ZF
  • 3. The Business Unit Wind Power Technology is part of the Industrial Technology Division of ZF ZF Friedrichshafen AG Shareholders: 93.8 % Zeppelin Foundation and 6.2 % Dr. Jürgen and Irmgard Ulderup Foundation Division Division Division Division Joint Venture Steering Systems 4) Powertrain Chassis Commercial Vehicle Industrial Technology Technology Technology Technology 50 % CEO, Market Transmissions Chassis Systems Truck & Van Construction Passenger Car Driveline Technology Machinery Systems Steering Systems Finance, Axle Drives Chassis Components Bus Driveline Agricultural Commercial Vehicle Controlling, Powertrain Modules Technology Machinery Systems Steering Systems IT, Process Management Rubber & Plastics CV Axle Systems Material Handling Passenger Car Human Resources Steering Columns Suspension Systems Technology CV Chassis Modules Test Systems Global Aftermarket CV Damper Materials Management Technology Special Driveline Technology CV Powertrain Modules Electronic Systems Operations and Technology Marine Propulsion Systems Compliance 1) Aviation Technology Die Casting Technology2) Wind Power Technology © ZF Friedrichshafen AG, 2012 ZF Services 3) Board of Management Organizational unit 1) linked to CEO 4) ZF Lenksysteme GmbH is a joint venture between 2) linked to Materials Management domain ZF Friedrichshafen AG and Robert Bosch GmbH. Integration of Hansen Partial activities 3) linked to Market domain Transmissions in wind power 3 OWI-Lab, 27/09/2012 A brand of ZF
  • 4. Key Figures 2011 Group The ZF Group – An Overview 2011 2011/2010 Sales € 15,509 million 20 % Employees (end of year) 71,488 11 % Capital expenditure € 1,058 million 82 % R&D expenditure € 754 million 17 % 121 production companies in 27 countries 8 main development locations in 4 countries © ZF Friedrichshafen AG, 2012 34 service companies and more than 650 service partners 4 OWI-Lab, 27/09/2012 A brand of ZF
  • 5. Wind Market Segments Global Annual Market Installations (in GW) 60 GW Onshore Offshore 6.3 5.6 50 GW 4.9 2.0 3.9 0.8 2.9 40 GW 1.5 0.6 30 GW 0.2 49.7 52.8 45.8 43.4 46.0 20 GW 0.2 37.9 40.5 41.1 37.6 28.2 10 GW 19.8 0 GW 2007 2008 2009 2010 2011 2012e 2013e 2014e 2015e 2016e 2017e  Offshore wind power technology is still in the emerging stage and larger, more efficient turbines along with optimization of the nascent supply chain have large potential for reducing Cost of Energy (CoE)  Reducing CoE of offshore wind will help wind to become a base-load production for the grid in mid- © ZF Friedrichshafen AG, 2012 long term  Flemish stakeholders take a pioneering role in offshore innovations and developments Source: ZF WPT Market Intelligence 5 OWI-Lab, 27/09/2012 A brand of ZF
  • 6. CoE Reductions Critical to Competitiveness Wind competitive with fossil fuels Cost of Energy (EUR/MWh)  Cost of Energy (CoE) is defined as:  Onshore  A reduction of 10% in onshore wind CoE will make it directly competitive with natural gas at today’s lower energy prices  Offshore  As wind farms are installed at sites further from shore and in deeper water, the industry will have to work hard to decrease current levels of CAPEX per megawatt installed © ZF Friedrichshafen AG, 2012 Note: NG prices = USD 4.00-6.75/MMBTU, Coal = USD 1.60- 1.70.MMBTU, onshore wind capacity factor = 30%, no CO2 costs for fossil technology, EUR = 1.45 USD. Source, MAKE, Lazard, others Source: MAKE Consulting, ZF WPT Market Intelligence 6 OWI-Lab, 27/09/2012 A brand of ZF
  • 7. Impact of gearboxes on CoE Offshore Wind Cost Drivers Offshore CAPEX structure Others Preparational Management Insurance 1% Work 2% 2% 1% Contingencies 3% Electrical Grid 6%  CAPEX impact of a gearbox is limited within a Substation Foundations typical offshore project, however, turbine 6% 26% suppliers are continually looking for ways to reduce component weight and material usage Installations Vessels 18%  Not the offshore environment is changing wind Other Turbine turbine gearbox specifications, but the Components challenges in O&M are emphasizing the 31% importance of reliability, with a direct impact on OPEX and AEP © ZF Friedrichshafen AG, 2012 Gearbox 4% Source: MAKE Consulting, ZF WPT Market Intelligence 7 OWI-Lab, 27/09/2012 A brand of ZF
  • 8. Our mission We reduce the kWh cost of renewable energy  We develop competitive products with proven reliability  to lower costs of unplanned OPEX  to guarantee AEP by increased availability © ZF Friedrichshafen AG, 2012 8 OWI-Lab, 27/09/2012 A brand of ZF
  • 9. Trends in drive train technology Diversity in solutions on the market  Search for the lowest CoE yields various  Mechanical power transfer: industrial solutions for the drive train,  gearbox being a trade-off between all design drivers:  hydraulic converter  reliability  Electrical generator  weight and cost  gear driven or direct drive ?  efficiency  high speed, medium speed, low speed ?  serviceability  traditional or permanent magnet generator ?  grid compatibility  Power conversion / transfer  low, medium, high voltage ?  AC or DC ? © ZF Friedrichshafen AG, 2012 All published solutions claim to be winners, but few are proven by test and experience 9 OWI-Lab, 27/09/2012 A brand of ZF
  • 10. Representative testing Representative testing is key to proof reliability of our competitive designs Logistic complexity and uncontrolled What ? environment of a wind turbine makes it a tough ‘test lab’ Short time-to-market requirements in new developments put time pressure on field validation campaign Start the turbine ! Representative (lab) testing capabilities are a long-term key © ZF Friedrichshafen AG, 2012 differentiator of ZF WP 10 OWI-Lab, 27/09/2012 A brand of ZF
  • 11. Representative testing It is possible to transform wind turbine behaviour into test rig conditions… © ZF Friedrichshafen AG, 2012 11 OWI-Lab, 27/09/2012 A brand of ZF
  • 12. Hansen Transmissions International Evolution of wind turbines and testing procedures ZF WP Capability ZF WP DORoTe Dynamic Testing @ ZF WP 13.2 MW Test Bench Industry Standard Overload Prototype Testing 100% Serial testing, first at partial, later at full load 1970 1980 1990 2000 2010 2020 © ZF Friedrichshafen AG, 2012 ZF WP is continuously improving its testing procedures by implementing ZF WP specific dynamic testing methods * Indicative Numbers & years 12 OWI-Lab, 27/09/2012 A brand of ZF
  • 13. Design verification proving reliability Technology/ Materials Verification Reliable Designs Component and State-of-the-art Sub-assembly Design Tools Verification Gearbox Verification Field © ZF Friedrichshafen AG, 2012 Verification 13 OWI-Lab, 27/09/2012 A brand of ZF
  • 14. Component and Sub-assembly Verification  ZF WP’s dynamic bearing system test rig  testing real size bearings  in their actual arrangement as built in the gearbox  under representative wind turbine loading and operational conditions © ZF Friedrichshafen AG, 2012 This pro-active testing method contributes largely to the design of robust bearing arrangements for new reliable gearboxes 14 OWI-Lab, 27/09/2012 A brand of ZF
  • 15. Gearbox Verification Motor GB1 GB2 Generator ZF WP’s 13.2 MW / 16.8 MW Dynamic Test Rig - 13.2 MW rated power - 1500 RPM nom speed - 1000 tons of steel - 16.8 MW peak power - 2600 RPM max speed - 1000 tons of concrete © ZF Friedrichshafen AG, 2012 - Investment - 80 kNm at motors - 35m x 10m > 10 M EUR - 100% Availability (24/7) 15 OWI-Lab, 27/09/2012 A brand of ZF
  • 16. Next steps in representative testing From gearbox verification to complete drive train / wind turbine testing Need for more large scale test infrastructure and prototype field testing Research topics • make tests even more representative by correlation between field and test rig conditions • increase acceleration factor for life testing on test rigs New conditions require dedicated testing • cold / hot climate OWI climate chamber • offshore e.g. corrosion testing © ZF Friedrichshafen AG, 2012 • grid codes e.g. grid compatibility testing 16 OWI-Lab, 27/09/2012 A brand of ZF
  • 17. Additional leverage to reduce CoE Minimise OPEX and optimise availability in our service offering © ZF Friedrichshafen AG, 2012 17 OWI-Lab, 27/09/2012 A brand of ZF
  • 18. Additional leverage to reduce CoE Minimise OPEX and optimise availability in our service offering O&M business is evolving rapidly ZF has a global footprint for offering service solutions for wind turbine gearboxes  Our unique gearbox know-how and large installed gearbox base will enable intelligent preventive maintenance  Research challenge: innovation in performance and condition monitoring  create wind turbine data sets (SCADA, CMS, …)  develop intelligent processing algorithms © ZF Friedrichshafen AG, 2012  merge measurements and algorithms into added value for O&M 18 OWI-Lab, 27/09/2012 A brand of ZF
  • 19. Conclusions ZF contributes to further proof competitive wind energy technology  Wind energy has grown significantly during last decades  Further CoE reduction will support wind to gain share in future energy mix, where offshore wind is still emerging  Proven reliability contributes to lower OPEX and higher AEP • Representative testing is key • ZF WP emphasizes this with large test capabilities • Next steps to focus on further improvement and expansion of test infrastructure  Additional leverage to reduce CoE by using intelligent preventive maintenance as part of our service solution  More and larger scale testing is better affordable in public test infrastructure (e.g. OWI), where governmental support increases regional competitiveness and contributes globally to stimulate renewable energy © ZF Friedrichshafen AG, 2012 19 OWI-Lab, 27/09/2012 A brand of ZF
  • 20. Thank you very much for your attention! © ZF Friedrichshafen AG, 2012 20 Presentation Title, Date OWI-Lab, 27/09/2012 A brand of ZF