Your SlideShare is downloading. ×
Acc 340
Upcoming SlideShare
Loading in...5
×

Thanks for flagging this SlideShare!

Oops! An error has occurred.

×
Saving this for later? Get the SlideShare app to save on your phone or tablet. Read anywhere, anytime – even offline.
Text the download link to your phone
Standard text messaging rates apply

Acc 340

121

Published on

Published in: Technology
0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total Views
121
On Slideshare
0
From Embeds
0
Number of Embeds
0
Actions
Shares
0
Downloads
2
Comments
0
Likes
0
Embeds 0
No embeds

Report content
Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
No notes for slide

Transcript

  • 1. Click Here For Answers Acc 340 Final Exam Three logical database structures include Hierarchical Model, Network Model, Object-O Relational Model. A notation showing the relationship among entities is called Cardinalities. The process of examining and arranging file data in a way that helps avoid problems wh are used or modified later is called _______________. a) insertions anomaly b) data manipulation language c) normalization Data definition commands, data query commands and report generators are features o a) data modeling b) DBMS packages. c) Systems development life cycle. Organizational structure for the general ledger is provided by a) special journals b) subsidiary ledgers c) chart of accounts. AISs depend heavily on the use of codes to record, classify and retrieve financial data. a) True b) False The practice of examining business practices and redesigning them from scratch is call a) lean manufacturing
  • 2. b) business process reengineering c) resource management. d) just-in-time system. Software solutions that include financial functions interfaced with manufacturing, sales distribution, and human resources are called a) value-added reseller b) application service provider c) enterprise resource planning systems Label the four stages in the systems development life cycle. 1. Research and Planning 2. Design 3. Implementation and Testing 4. Maintenance When installing a new system, the 3 changeover possibilities are 1.)Direct Cutover 2.)Parallel Operation_and 3.)MODULAR Name two tools used to plan, schedule and monitor the activities during a systems impl project. 1. Project Evaluation and Review Technique (PERT) 2. GANNT The objective in designing any internal control system is to provide foolproof protection internal control risks. a.) True b.) False
  • 3. A good Audit Trail enables an accounting manager as well as auditors to follow the path recorded in transactions form the initial source. A control activity of an internal control system that focuses on structuring work assignm employees so that one employee's work activities serve as a check on those of another called separation of duties. What kind of analysis should be performed when considering if an internal control proce be implemented? a.) expected loss b.) risk assessment c.) cost-benefit Which of the following are examples of fault tolerant systems. a.) disk mirroring b.) rollback processing c.) data backup d.) all of the above Control totals are an example of a(n) a.) output control b.) input control c.) processing control A criticism of the traditional architecture is a lack of integration across functional areas o organization. a.) True b.) False
  • 4. means the computer-input device is connected to the CPU so that master files are upd transactions data are entered. a.) Report-time processing b.) Batch processing c.) Online processing The _________________________ has been one of the most exciting developments in telecommunications and networking. a.) file server b.) wireless network card c.) Internet

×