Your SlideShare is downloading. ×
EMC Durham Cloud Data Center: Virtual, Green, Agile, Resilient
Upcoming SlideShare
Loading in...5
×

Thanks for flagging this SlideShare!

Oops! An error has occurred.

×

Introducing the official SlideShare app

Stunning, full-screen experience for iPhone and Android

Text the download link to your phone

Standard text messaging rates apply

EMC Durham Cloud Data Center: Virtual, Green, Agile, Resilient

409
views

Published on

EMC Durham Cloud Data Center: Virtual, Green, Agile, Resilient

EMC Durham Cloud Data Center: Virtual, Green, Agile, Resilient

Published in: Technology, Business

0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total Views
409
On Slideshare
0
From Embeds
0
Number of Embeds
0
Actions
Shares
0
Downloads
2
Comments
0
Likes
0
Embeds 0
No embeds

Report content
Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
No notes for slide

Transcript

  • 1. EMC DURHAM CLOUD DATA CENTER Virtual, Green, Agile, Resilient Sometimes, the journey to the cloud hits a little turbulence. So it was for EMC when its Westborough, Massachusetts data center began running out of room. by Mark Schafron EMCEMC CORPORATION
  • 2. “We were blazing a new trail—we weren’t replicating what we already had. We were designing as the data center was being built.” JON PEIRCE VP GLOBAL IT PRIVATE CLOUD INFRASTRUCTURE AND SERVICES “Like our customers,” says Sanjay Mirchandani, EMC CIO and COO, EMC Global Centers of Excellence, “we were grappling with unrelenting information growth, increasingly complex application environments, and congested, energy-exhausting data centers.” So EMC took a bold step. Instead of cramming in more capacity to make-do in West- borough, work began on transforming a 450,000-square-foot warehouse in Durham, North Carolina into a super-efficient virtualized showcase. For Jon Peirce, EMC Vice President of Global IT Private Cloud Infrastructure and Services, the massive effort was Extreme Makeover, Cloud Edition. “Designing a multimillion cloud data center from scratch was a huge challenge,” Peirce says. “We were blazing a new trail—we weren’t replicating what we already had. We were designing as the data center was being built.” Today, the data center project that Peirce describes as a “once-in-a-career oppor- tunity,” is the new home of EMC’s first U.S.-based Center of Excellence, joining six other COEs in Ireland, Russia, Egypt, Israel, India, and China. The Durham COE will consolidate regional EMC research, development, and proof-of-concept labs, and will also offer consulting, development, technical services, and showcase EMC and partner solutions. “It will extend our global cloud computing capabilities,” Mirchandani explains, “to support EMC and help our customers accelerate their own cloud computing and IT transformations.” A R E A L WOR LD V IRTUA L M OV E A data center move conjures images of big trucks, snarled schedules, and headaches. Not here. No hardware will be relocated from the old data center to Durham. Instead, applications and data are being migrated to the new virtual infrastructure across a redundant 10-gigabit fibre optic Ethernet link, using a combination of data replication and virtual site recovery technologies. About 350 applications and six petabytes of data will be migrated in a series of database grid-centered move events that started in the Spring of 2011 and will continue through the Fall of 2012. Decommissioning and vacating the leased Westborough data center is set for the end of 2012.EMC CORPORATION
  • 3. RES I LI E N T D I SA STER R ECOV ER Y Migration to Durham accelerates EMC’s transition to a completely virtual data center. COOL GREEN CLOUD All applications will run on a single version of the VMware VSphere operating system Virtualization and cloud computing are smart energy saving moves. But in Durham, on an x86 enterprise hosting architecture and will provide a live cloud computing EMC went beyond the obvious and incorpo- showcase for EMC’s customers. rated green design and construction into Besides running mission-critical applications that support EMC’s business and its every facet of the project. 50,000 employees across 80 countries, the North Carolina location extends by more Air-intake plenums at the perimeter of the than 600 miles the distance between EMC’s primary U.S. data center and its sec- building and air-side economizers provide ondary DR site in Hopkinton, Massachusetts, increasing resiliency in the event of a free cooling during months of cool weath- er—approximately 5,000 hours per year— regional disaster. quite an achievement in a warm-weather state like North Carolina. The air plenums I T A S A SE R V I CE also eliminated the need for windows, The new EMC Durham Cloud Data Center is also a significant milestone in EMC’s minimizing light pollution. delivery of IT as a service, offering businesses the convenience of the entire IT stack Construction materials have a minimum through a standardized service catalog with on-demand self-service provisioning of 10 percent recycled content—including and metered usage for chargeback. To enable cloud—which in turn facilitates IT as a structural steel, door frames, metal studs, service—EMC is working toward delivering server, storage, and network infrastruc- concrete, acoustical ceiling tiles, carpet, ture enterprise applications, database, security services, virtual desktop services, plywood, and solid surface countertops. Meanwhile, a minimum of 50 percent of the and more as a service from a shared pool of virtual resources in EMC or partner data construction waste and demolition debris centers around the world. was diverted from landfills and incineration “While building out the Durham Data Center to support our global enterprise,” Mirchan- facilities and recycled back into the manu- facturing process. dani notes, “our employees became intimately familiar with architecting and running a highly-virtual cloud data center. These skills will continue to evolve as we continue Mindful of the local economy, EMC ensured down the road toward IT as a Service.” that a minimum of 20 percent of construc- tion materials were manufactured locally. D ES I GN A N D CON STR U C TIO N H IG H L IG H TS Rainwater is collected from the roof and di- The new Durham Data Center is 100% “white space” dedicated to IT infrastructure, verted to a storage tank, reducing the water usage by more than 40 percent—one inch with all power, mechanical units, and office space located elsewhere in the building. of rain on the 450,000 square foot roof This approach, along with dramatically reduced power and space requirements due equals 280,000 gallons of water. to rationalization, consolidation, and virtualization, provides the flexibility, capacity, The data center’s UPS modules use fly- and energy to meet EMC data center requirements for years. wheel technologies, which store energy ki- Energy analysis studies and life-cycle cost analyses helped shape the main utility netically eliminating big racks of batteries infrastructure systems, while energy modeling studies substantiated applications and the associated HazMat. for energy incentive and rebate programs through the local utility provider. It’s big, it’s powerful, it’s cool, and it’s green. It’s EMC’s new Center of Excellence. Two new fan deck structures enable custom air-handling units to be stacked above electrical rooms, saving valuable data center floor space on the first floor. Flexible power and data cabling infrastructure is provided from overhead track bus-way sys- tems and cable trays, freeing the raised access floor to be used for cooling air-flow.EMC CORPORATION
  • 4. Air cooling takes advantage of air-intake plenums at the perimeter of the building and air-side economizers to provide free cooling during months of cool weather—an estimated 5,000 hours, or more than half the year. Sophisticated HVAC and electrical monitoring control systems were incorporated into the design as an extension of EMC’s current data center control systems, enabling remote monitoring from EMC global Command Centers. Continuous power to the data center is provided by two 2N redundant uninterruptable power systems. Each system contains three 675 kW UPS modules—expandable to four—with flywheel technology that eliminates the need for battery storage. Multiple generators are on site in case of a power failure. “It will extend our global “The new Durham Data Center gives us a solid foundation for the future,” Peirce says, “and accelerates EMC’s own journey to the cloud. It gives us the flexibility to offer cloud computing IT as a Service to EMC business units in a cost effective way, and puts us in prime capabilities to support position to share what truly are best practices with our customers.” EMC and help our customers accelerate their own cloud computing and IT transformations.” SANJAY MIRCHANDANI EMC CIOEMC CORPORATION