Your SlideShare is downloading. ×
0
Transformation
Transformation
Transformation
Transformation
Transformation
Transformation
Transformation
Transformation
Transformation
Transformation
Transformation
Transformation
Transformation
Transformation
Upcoming SlideShare
Loading in...5
×

Thanks for flagging this SlideShare!

Oops! An error has occurred.

×
Saving this for later? Get the SlideShare app to save on your phone or tablet. Read anywhere, anytime – even offline.
Text the download link to your phone
Standard text messaging rates apply

Transformation

293

Published on

Design transformers in minutes.Generate 3D and 2D in less than 120 minutes

Design transformers in minutes.Generate 3D and 2D in less than 120 minutes

0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total Views
293
On Slideshare
0
From Embeds
0
Number of Embeds
2
Actions
Shares
0
Downloads
0
Comments
0
Likes
0
Embeds 0
No embeds

Report content
Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
No notes for slide

Transcript

  1. Design Automation Solutions by
  2. Transformation®the new way to design Transformers
  3. Product Specification•Design Automation of two types of transformero Pole Mount Transformer o Ground Mount Transformer (200 to 10000 KVA) (Up to 500 KVA ) -With Panel Cooling -With Fin Cooling (ONAN / ONAF)
  4. Product Specification
  5. The Need for Transformation®• To support the growing demand and standardizing the product design in the design process of Distribution Transformers• Optimise Cooling calculations and radiator positions• Standard parts Arrangement maintaining minimum electrical clearances• Design to be Manufactured across the globe• Eliminate approximation in Quotes to the client and to manufacturing• Link between Quotations and Contracts• Knowledge Capture and Reuse
  6. Design Process Tender 1. Customer Specification Document Tender 1. Customer Specification Document 2. Check List of Specifications 2. Check List of Specifications 3. Reference Drawings of similar type if any 3. Reference Drawings of similar type if any Inputs from 4. Communications Inputs from 4. Communications Sales 5. Contract Number Sales 5. Contract Number 6. Top Assembly Number 6. Top Assembly Number1. Schedule 7. Delivery Date 1. Schedule 7. Delivery Date2. Job Number 2. Job Number3. Basic BOM (Classify high lead time items) Inputs from Planning 3. Basic BOM (Classify high lead time items) Inputs from Planning4. Top Mechanical and Electrical Asm. (Product Structure) 4. Top Mechanical and Electrical Asm. (Product Structure)Numbers Numbers5. Special Requirements 5. Special Requirements 1. Electrical Design 1. Electrical Design Electrical Inputs as a Electrical Inputs as a Data Data Excel document Excel document 2. Electrical Test Data 2. Electrical Test Data OUTPUT OUTPUT Feeding the electrical Feeding the electrical 1. BOM’s with required 1. BOM’s with required Inputs into Inputs into Part Dimensions Part Dimensions Spreadsheet Spreadsheet Basic Parameters to Basic Parameters to Find Match from Finding the similar Find Match from Finding the similar Database Rating Models in Database Rating Models in NO Database NO 1. Rating Database 1. Rating 2. Customer 2. Customer 3. Connections 3. Connections YES YES Application Process Modify the Existing Models Designing of Modify the Existing Models Designing of Models as per as per new requirements if Models as per as per new requirements if the BOM any the BOM any Validation Validation 3D and 2D for 3D and 2D for Manufacturing Manufacturing Manual Manual Entry Vantage Entry Vantage Bill of Material Bill of Material Current Design Process Process using Transformation®
  7. Development PlatformSoftware• Solidworks / Inventor / Pro-Engineer• VB.Net 2003• MS SQL 2000Production Hardware• Intel Xeon Core2 Duo 3.00 Ghz• RAM : 8 GB• NVIDIA Quadro FX3500 with 256 MB RAM
  8. The Design Challenges• Maintaining Optimum Tank Space Utilisation• Optimisation of Tank dimensions• Electrical and mechanical clearances• Combination of Panel radiators for effective cooling• Default and Custom Bushing positions• Placement of Accessories• 60% of Custom Components & 40% of Standard parts• Accommodating continuous change in the customer requirement
  9. Salient Features of Transformation®• Does the complete Design and Optimization of – Fin Dimensions (Height, Depth and Pitch) – Tank Dimensions – Cold Oil Level – Panel Radiator Height – Number of Radiator Panels – Selection of Radiator Banks position based on Bushing Arrangement – Core Frame Selection• Interference checking within the User Interface Level and Provision to the User to modify the Location / Position of a Accessory
  10. Salient Features of Transformation®• Standard Components (Brought out) will be accessed by the application from the Client Server (External Location)• Different Output options from the Application – Complete Transformer (Default) – Core and Coil Assembly – Complete Transformer without Core and Coil Assembly• Admin Module to Add / Modify the specific Data Base Values• ERP (Material Database) connection• Default and Custom bushing positions• Generation of Electrical Wiring Diagram and Bill of Materials
  11. ®Transformation Demo
  12. The Total Transformation® Normal Way Transformation® wayDetail Design (OGA & Part Drawings)Efforts 48-96 Man Hours 2-4 Man HoursDuration 6-12 Days -Quotation Drawing (OGA Only)Efforts 32 Man Hours 2 Man HoursDuration 4 Days -
  13. ABOUT IDOLA FORI Idola Fori (Eye Dola For eye) was started in the year 2000 as a limited company with the idea of a complete “design to manufacture to Market” concept. Today we are… • Privately held Limited Company • 10 Years in the Engineering Services Industry • Having development center in Hyderabad • 30 people –Mix of Mechanical and Software Engineers • Extensive experience in Glass Containers, Glass Equipments, Electrical Equipments, Material Handling Equipments and Packaging Tools • Working with industry leaders around the globe on various other segments like HVAC Equipments, Drill Rigs, Rubber Seals, Printing Machines, etc…
  14. THANK YOU

×