Optimal Control Of High-Volume Assemble To Order Systems Ping Xu

Loading...

Flash Player 9 (or above) is needed to view presentations.
We have detected that you do not have it on your computer. To install it, go here.

0 comments

Post a comment

    Post a comment
    Embed Video
    Edit your comment Cancel

    Favorites, Groups & Events

    Optimal Control Of High-Volume Assemble To Order Systems Ping Xu - Presentation Transcript

    1. Optimal Control of High-Volume Assemble-to-Order Systems written by Eric L. Plambeck Amy R. Ward December 15, 2003 presentation for 15.764 The Theory of Operations Management March 4, 2004 Presentation by Ping Xu 15.764 The Theory of Operations Management This summary presentation is based on: Plambeck, Erica, and Amy Ward. \"Optimal Control of High-Volume Assemble-to-Order Systems.\" Stanford University, 2003.
    2. Motivation • Assembly-to-Order – hold component inventories – rapid assembly of many products – Dell - grown by 40% per year in recent years. PC industry - grown by less than 20% per year. – GE, American Standard, BMW, Timbuk2, National Bicycle. • Challenges of ATO – product prices? – production capacity for component (supply contract)? – dynamically ration scarce components to customer orders? 15.764 The Theory of Operations Management 1
    3. Overview • Literature review • Model formulation – Dynamic control problem – Static formulation • Asymptotic analysis • Delay bound and expediting component option 15.764 The Theory of Operations Management 2
    4. Literature • ATO survey by Song and Zipkin (2001) • not FIFO assembly – Agrawal and Cohen (2001), Zhang (1997) • one component and multi-product assembly sequencing — multi-class, single- server queue – Wein (1991) , Duenya (1995) – Maglaras and Van Mieghem (2002), Plambeck, Kumar, and Harrison (2001) • fill rate constraints – Lu, Song, and Yao (2003), Cheng, Ettl, Lin, and Yao (2002) – Glasserman and Wang (1998) 15.764 The Theory of Operations Management 3
    5. Model Formulation Sequence of events: 1. set product prices, component production rates – remain fixed throughout time horizon 2. dynamically sequence assembly of outstanding product orders Objective: minimize infinite horizon discounted expected profit Trade-off: inventory vs. customer service (assembly delay, cash flow) Operational Assumptions: – assembly is instantaneous given necessary components – customer order for each product are filled FIFO 15.764 The Theory of Operations Management 4
    6. Model Formulation - notations J components K finished products akj no. of type j components needed by product k pk product price δj component production rate Ok product demand arrival renewal process, rate θk (p) Cj component arrival renewal process, rate δj cj component unit production cost Ak (t) cumulative no. of type k orders assembled up to t u = (pu, δu, Au) admissible policy (prices, production rates, assembly sequence rule) Qu,k (t) order queue-length, = Ou,k (t) − Au,k (t) √ 0 �K Iu,j (t) inventory levels, = Cu,j (t) − k=1 akj Au,k (t) √ 0 15.764 The Theory of Operations Management 5
    7. Model Formulation - technical assumptions θ(p) is continuous, differentiable, and the Jacobian matrix is invertible. guarantees p(θ) is unique, continuous, and differentiable. Customer demand for product k is strictly decreasing in pk , but may be increasing in pm, m = k. δθk (p) < 0 while δθkm √ 0, m = k. (p) ≤ ≤ δp δp k Increase in the price of one product � cannot lead to an increase in the total rate of demand for all products. −δθk > m∗=k δθm . δp δp k k Revenue rates for each product class, rk (θ) = θk pk (θ) are concave. Renewal processes Ok and Cj started in steady state at time zero. 15.764 The Theory of Operations Management 6
    8. Model Formulation - profit expression infinite horizon discounted profit: K J � � �� �� −�t cj e−�tdCj (t) �= pk e dAk (t) − 0 o j=1 k=1 � K J � � � � �� � � �� −�t −�t cj e−�tdCj (t), �= pk e dOk (t) − Qk (t)�e dt − 0 0 0 j=1 k=1 where Qk (t) is the order queue-length � � � � � � −�t −�t �e−�tQk (t)dt e dOk (t) − e dAk (t) = 0 0 0 15.764 The Theory of Operations Management 7
    9. Model Formulation - static planning problem if we assume that demand and production flow at the long run average rates continuously and deterministically, K J � � � ¯ = max pk θk (p) − δj cj p�0,α�0 j=1 k=1 K � s.t. akj θk (p) ∼ δj , j = 1, ..., J k=1 – optimal solution (p�, δ �) assumed to be unique, positive. the first order condition imply that all constraints are tight (p�, δ �). – � is an upper bound on the expected profit rate. ¯ want to show that under high volume conditions, the optimal prices and production rates are close to (p�, δ �). 15.764 The Theory of Operations Management 8
    10. Asymptotic analysis - high demand volume conditions any strictly increasing sequence {n} in [0, →), n tends to infinity. order arrival rate function θn, where θn(p) = nθk (p), k = 1, ..., K. k n¯ upper bounds the expected profit rate in the nth system, � � � �n ∼ n¯ −�tdt = � −1n¯ ��e � 0 plug (p�, nδ �) into the nth system, n−1�(p�,nα �,An) ∀ � −1� as n ∀ →, given ¯ that n−1Qn ∀ 0 a.s., as n ∀ →. 15.764 The Theory of Operations Management 9
    11. Asymptotic analysis - proposed assembly policy component shortage process: K K � � Sj (t) = akj Ok (t) − Cj (t) = akj Qk (t) − Ij (t), j = 1, ..., J k=1 k=1 min. instantaneous cost arrangement of queue-lengths and inventory levels (Q�(S), I �(S)), K � p� Q k min k Q,I�0 k=1 K � s.t. Ij = akj Qk − Sj √ 0, j = 1, ..., J k=1 15.764 The Theory of Operations Management 10
    12. Asymptotic analysis - proposed assembly policy for the nth system, the review period ln = n−�, where � = (4(3 + 2σ1))−1(6 + 5σ1) > 1/2 15.764 The Theory of Operations Management 11
    13. Asymptotic analysis - system behavior (See Theorem 1 on page 12 of the Plambeck and Ward paper) 15.764 The Theory of Operations Management 12
    14. Review on Brownian Motion A standard Brownian Motion (Wiener process) is a stochastic process W having 1. continuous sample paths 2. stationary independent increments 3. W (t) � N (0, t) A stochastic process X is a Brownian motion with drift µ and variance π 2 if X(t) = X(0) + µt + πW (t), �t then E[X(t) − X(0)] = µt, V ar[X(t) − X(0)] = π 2t. variance of a Brownian motion increases linearly with the time interval. 15.764 The Theory of Operations Management 13
    15. Optimality of Nearly Balanced Systems (See Theorem 2 on page 15 of the Plambeck and Ward paper) 15.764 The Theory of Operations Management 14
    16. System with delay constraints propose a near-optimal discrete review control policies, which both sequences customer orders for assembly and expedites component production in an ATO system with delay constraints. 15.764 The Theory of Operations Management 15

    + Siddharth NathSiddharth Nath, 10 months ago

    custom

    387 views, 0 favs, 0 embeds more stats

    Optimal Control Of High-Volume Assemble To Order Sy more

    More info about this document

    © All Rights Reserved

    Go to text version

    • Total Views 387
      • 387 on SlideShare
      • 0 from embeds
    • Comments 0
    • Favorites 0
    • Downloads 3
    Most viewed embeds

    more

    All embeds

    less

    Flagged as inappropriate Flag as inappropriate
    Flag as inappropriate

    Select your reason for flagging this presentation as inappropriate. If needed, use the feedback form to let us know more details.

    Cancel
    File a copyright complaint
    Having problems? Go to our helpdesk?

    Categories