    Franklin (MA) DPW Snow Presentation 1/21/2009 - Presentation Transcript

    1. Winter Road Treatments & Snow Removal Costs Outline
    2. FY 2009 Update
      • FY 2009 Approved Budget: $694,500
      • $210,000.00 for salt
      • FY 2009 Costs so far: $692,490 (as of January 01/21/2009)
      • Difference of $2,010
      • One salt shed empty, $150K to fill
    3. Salting Issues
    4. Salt is not available!!! SHED IS CURRENTLY EMPTY
    5. Mixing Rate
      • Four Parts Salt
      • One Part Sand
    6. Mixing Rate Concerns:
      • CATCH BASIN CLEANING
      • STREET SWEEPINGS
    7. Cost of Salt ?
      • 2007 = $54.00 per ton.
      • 2008 + $70.20 per ton.
      • 2007 = $18.00 per ton.
      • 2008 + $20.00 per ton.
      Cost of Sand ? Suppliers Running Low Readily Available 10% Increase 30% Increase
    8. Environmental Concerns
      • Well #3, Grove Street
      • D.E.P recommends < 20 ppm
      • 2000 17.4 ppm
      • 2008 43.8 ppm
      Rising Salt Levels in Water Supply Stormwater Runoff to Surface Water
      • Treating the Whole Town:
      • 15 Sanders
      • Eighteen Employees $2,295.00
      • 400 Yards of Salt $ 28,080.00
      • Total: $30,375.00
      • “ Five Truck Route” Treats:
      • 6 Sanders
      • Seven Employees $7,24.80
      • 150 Yards of Salt $ 7,371.00
      • Total: $8,216.60
      Five Truck Route vs. Treating the Whole Town
    9. Plowing Issues
    10. 30 PIECES OF EQUIPMENT “On Road” at one time
      • D.P.W. Employees = $900.00 per hour.
    11. 53 PIECES OF EQUIPMENT CONTRACTOR COST = $7450.00 per hour.
    12. Why not eliminate contractors for plowing?
    13. Cost Estimate of 6 Inch Storm Procedure Cost Pre-Treat Town: $30,000 Plow for 8 Hours: $66,000 Sand Town after Plowing: $30,000 Total Cost: $96,000
    14. Snow Plowing Priorities 1. All Public Roadways 2. School Facilities and Municipal Buildings 3. Sidewalks that have been identified as primary routes
    15. Salt is not Available at DPW Yard
      • Safety of Employees and Residents
      • DEP Regulations
      • Liability Issues
    16. Please don’t put snow back in the road. (Bylaw Chapter 155-20)
    17. Mailbox Policy
    18. Clear Fire Hydrants
      • Public Expectations ???
      • Safety
      • Costs
      • Public Perception of D.P.W.
    19. Think Summer!
    SlideShare Zeitgeist 2009

    + Steve SherlockSteve Sherlock Nominate

    custom

    445 views, 0 favs, 1 embeds more stats

    The Franklin, MA Dept of Public Works (DPW) present more

    More info about this document

    © All Rights Reserved

    Go to text version

    • Total Views 445
      • 438 on SlideShare
      • 7 from embeds
    • Comments 0
    • Favorites 0
    • Downloads 1
    Most viewed embeds
    • 7 views on http://franklinmatters.blogspot.com

    more

    All embeds
    • 7 views on http://franklinmatters.blogspot.com

    less

    Flagged as inappropriate Flag as inappropriate
    Flag as inappropriate

    Select your reason for flagging this presentation as inappropriate. If needed, use the feedback form to let us know more details.

    Cancel
    File a copyright complaint
    Having problems? Go to our helpdesk?

    Categories