4.2.6 production schedule
Upcoming SlideShare
Loading in...5
×
 

Like this? Share it with your network

Share

4.2.6 production schedule

on

  • 154 views

 

Statistics

Views

Total Views
154
Views on SlideShare
152
Embed Views
2

Actions

Likes
0
Downloads
1
Comments
0

2 Embeds 2

http://www.slideshare.net 1
http://cmshapla-record.blogspot.com 1

Accessibility

Categories

Upload Details

Uploaded via as Microsoft Word

Usage Rights

© All Rights Reserved

Report content

Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
  • Full Name Full Name Comment goes here.
    Are you sure you want to
    Your message goes here
    Processing…
Post Comment
Edit your comment

4.2.6 production schedule Document Transcript

  • 1. 4143375-381000<br />Production Schedule <br />WhatWhoWhereWhenProps/ Material/ Equipment neededTICK once completedMeeting (7 meetings in total)(meeting discussions in production meeting schedule)BRiiNK ProductionCFGS Library Harley Grove05/11/1008/11/1005/12/1005/01/1120/01/1110/02/1127/04/11Computer, notepadBook Venues(12 Johnson House)BRiiNK Production and owner of the venue12 Johnson House10/04/11Location ContractPermission slip Deadline for volunteersBRiiNK Production, actors, volunteers and helpersSchool Atrium02/03/11Permission Contract & Job DescriptionHealth and SafetyBRiiNK Production12 Johnson House, Shopping mall10/04/11Health and Safety List First Shooting BRiiNK Production and actors including volunteers and helpers12 Johnson House 15/04/11Cameras, Tripod, Costumes, & Storyboard Second ShootingBRiiNK Production and actors including volunteers and helpersShopping mall20/04/11Cameras, Tripod, Costumes, & StoryboardThird ShootingBRiiNK Production and volunteers and helpersOutside own house23/04/11Cameras, Tripod, Costumes, & Storyboard<br />