Woodsville
Upcoming SlideShare
Loading in...5
×

Like this? Share it with your network

Share

Woodsville

  • 990 views
Uploaded on

stop renting / start owning a condo unit for as low as 9k a month no downpayment with 0% interest thru bank and in-house financing

stop renting / start owning a condo unit for as low as 9k a month no downpayment with 0% interest thru bank and in-house financing

More in: Real Estate
  • Full Name Full Name Comment goes here.
    Are you sure you want to
    Your message goes here
    Be the first to comment
    Be the first to like this
No Downloads

Views

Total Views
990
On Slideshare
989
From Embeds
1
Number of Embeds
1

Actions

Shares
Downloads
13
Comments
0
Likes
0

Embeds 1

http://www.slideshare.net 1

Report content

Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
    No notes for slide

Transcript

  • 1. Merville, Parañaque City
  • 2. The developer does not authorize any person to render any representation or warranty regarding the project/s mentioned herein. The developer is subject to Philippine laws relative to the development and marketing of the project/s contained herein and the distribution of this material.  This material should neither be distributed nor viewed in countries, states and/or jurisdictions where relevant restrictions are being enforced. Persons receiving this material are thus advised to inform themselves about and observe any such restrictions, and consult a lawyer, if necessary. Disclaimer
  • 3. Location Map
  • 4. Advantages of living in Merville, Parañaque
    • 10 minutes away from Ayala Center, Makati
    • 10 -15 minutes away from Fort Bonifacio, and the domestic and international airports
    • Near commercial establishments
      • SM Bicutan/ SM Sucat
      • Market Market
      • Alabang Town Center
      • Festival Mall
    • Accessible via SLEX (South Luzon Expressway) and C5 Road
    • Efficient transportation and road networks
    • Part of the growing upscale communities in South of Makati
  • 5. Proximate Establishments
    • San Juan de Dios
    • Makati Medical Center
    • Ospital ng Maynila
    • Asian Hospital
    • Muntinlupa Hospital
    • Alabang Medical Center
    • Paranaque Medical Center
    • Olivares Medical Center
    • PAREF School
    • La Salle
    • San Beda Alabang
    • Singapore International School
    • Asia Pacific College
    • AMA Computer College
    • Assumption – Makati
    • Colegio de Santa Rosa – Makati
    • Makati Science High School
    Medical Facilities Educational Institutions
  • 6. Site Development Plan
  • 7. The Village Mall @ Woodsville
    • Robinsons Supermarket
    • Spa/Salon
    • Restaurants/Al Fresco
    • Laundry Shops
    • Drug stores
  • 8.  
  • 9. Building Facilities
    • Gated residential community with 18 meter main road
    • Security service with two controlled entry points
    • Two (2) passenger elevators per tower
    • Overhead water tank and underground cistern
    • for ample water supply
    • Laundry cages at roof deck (sold separately)
    • Stand-by power generator for common areas and
    • selected outlet in each unit
    • Intercom and Security Lock per building at drop-off
    • Mailboxes
    • Garbage bins for centralized garbage disposal system
    • Automatic smoke detectors and fire sprinkler system for all units
  • 10.
    • Provisions for:
    • - Individual electric and water meters
    • - Cable TV line
    • - Telephone line per unit
    • - Opening for owner-supplied window-type air conditioner
    • at living room and bedrooms
    • Mechanical ventilation for kitchen and toilets
    Typical Residential Features
  • 11. Themed Gardens Nature’s Orchestra The Oasis Nirvana Cove Poet’s Nook Picnic Grove Fun Park Fitness Cove **Building 6 is now renamed as Building 8
  • 12. Nature’s Orchestra
  • 13. The Oasis
  • 14. Nirvana Cove
  • 15. Poet’s Nook
  • 16. Picnic Grove
  • 17. Fun Park
  • 18. Fitness Cove
  • 19. Floor Description – Bldg 4 Floors Laundry Cages 2nd – 14th Residential Units Ground Floor Parking
  • 20. 2 nd to 9 th Residential Units Floor Description – Bldg 5 Ground Floor
  • 21. 2 nd to 9 th Residential Units Floor Description – Bldg 6 Ground Floor
  • 22. Project Update* * As of July 8, 2008 BUILDING % SOLD % COMPLETION TURNOVER DATE 1 99% 30% 31-Dec-08 2 94% 80% 30-Jun-08 3 88% 17% 31-Mar-09 4 65% 0% 30-Sep-09
  • 23. Project Update* * As of July 8, 2008 BUILDING % SOLD % COMPLETION TURNOVER DATE 5 78% 0% 30-Apr-10 6 8% 0% 30-Nov-10 7 0% 0% VM 97%
  • 24. Progress Photos* Bldg. 1 * As of September 16, 2008 View of Bldg.1 HALLWAY TILE INSTALLATION AT 5 TH FLR . PLASTERING WORKS AT LEDGES FACING MAIN ENTRANCE
  • 25. Progress Photos* Bldg. 2 and 3 * As of September 16, 2008 View of Bldg.2 Perspective of building 3 HALLWAY Building 2
  • 26. Progress Photos* Building 4 PREPARATION OF SLAB ON FILL AT AREA 2 CONCRETED SUSPENDED SLAB - 2 ND FLR. * As of September 16, 2008
  • 27. Progress Photos* Clubhouse * As of September 16, 2008 AERIAL VIEW A CLUBHOUSE CONCRETING OF SWIMMING POOL DECK
  • 28. Progress Photos* * As of September 16, 2008 View at Main Entrance
  • 29. Progress Photos* Village Mall Parking Area VIEW AT MAIN ENTRANCE FRONT VIEW * As of September 16, 2008
  • 30. Typical Floor Plan – Building 1 A B D E F I H C G 2 elevators Seven 2-BR units Two 3-BR units 2 stairwells 1.3 m. wide hallway
  • 31. Typical Floor Plan - Building 2 A L B C E F G H J K D I Two Studio units Eight 2-BR units Two 3-BR units
  • 32. Typical Floor Plan - Building 3 A D E F I C G B H Five 2-BR units Four 3-BR units
  • 33. Typical Floor Plan - Building 4 B H A I D E F C G Five 2-BR units Four 3-BR units Building 4 Typical Floor Plan 2 nd – 14 th Floor
  • 34. Typical Floor Plan – BUILDING 5 Four (4) - 1BR unit Three (3) - 2BR unit Two (2) - 3BR unit A I D F B H E C G
  • 35. Typical Floor Plan – BUILDING 6 Two (2) - 1BR unit Four (4) - 2BR unit Two (2) - 3BR unit
  • 36. Studio Unit Floor Plan (Bldg. 2) DESCRIPTION AREA (sq.m.) Living / Dining Room 13.18 Kitchen 5.52 Toilet & Bath 3.80 Total Area 22.50
  • 37. Unit Mix (Bldg.5)
  • 38. 2 BR Unit Floor Plan (Bldg. 1-3) DESCRIPTION AREA (sq.m.) Living / Dining Room 14.44 Kitchen 4.86 Toilet & Bath 4.77 Maid’s Room 4.16 Bedroom 1 6.40 Master’s Bedroom 10.37 Total Area 45.00
  • 39. 3 BR Unit Floor Plan (Bldg. 1-3) DESCRIPTION AREA (sq.m.) Living / Dining Room 19.40 Kitchen 4.50 Toilet & Bath 1 3.24 Maid’s Room 4.50 Bedroom 1 7.40 Bedroom 2 7.10 Master’s T&B 4.00 Master’s Bedroom 9.86 Total Area 60.00
  • 40. 2-BR with Balcony (Bldg. 4) Unit Area = 45.00 sq.m Balcony = 6.00 sq.m
  • 41. 3-Bedroom with Balcony (Bldg. 4) Unit Area = 60.00 sq.m Balcony = 6.00 sq.m
  • 42. 1 Bedroom (Bldg. 5) units A & I 32.00 sqm. units D & F
  • 43. 2 Bedroom (Bldg. 5) 45.00-sqm. unit + 3.60-sqm. balcony Units B & H Unit E
  • 44. 3 Bedroom (Bldg. 5) 64.00-sqm. unit + 3.60-sqm. balcony Units C & G
  • 45. Unitized Floor Plan- 1 Bedroom units A & H - 37.05 sqm.
  • 46. Unitized Floor Plan- 2 Bedroom (A) units D & E- 50.38 sqm.
  • 47. Unitized Floor Plan- 2 Bedroom (B) units B & G- 50.87 sqm.
  • 48. Unitized Floor Plan- 3 Bedroom units C & F- 68.38 sqm.
  • 49. Unit Deliverables   Living/ Dining Kitchen BR Toilet Utility Flooring Ceramic Tiles Ceramic Tiles Laminated Wood Ceramic Tiles Ceramic Tiles Wall Plastered painted/ painted drywall Plastered painted/ painted drywall Plastered painted/ painted drywall Ceramic tiles and plastered painted Plastered painted/ painted drywall Ceiling Painted slab soffit/ Gypsum Bulkhead Painted slab soffit/ Gypsum Bulkhead Painted slab soffit/ Gypsum Bulkhead Painted gypsum board Painted slab soffit Others Incandescent lighting fixtures Base cabinet, stainless steel sink Incandescent lighting fixtures Water closet, lavatory Incandescent lighting fixtures
  • 50. Principal Architect : Albert S. Yu and Associates Structural Engineers : Aromin & Sy + Associates, Inc. Mechanical Engineers : L. R. Punzalan & Associates Electrical Engineers : Mar Alix and Associates Sanitary Engineers : NBF Consulting Engineers General Contractor : SPES Construction, Inc. Project Team
  • 51. Development Timetable 2008 2007 2006 Construction of Bldg. 2 Pre-selling of Bldgs. 1, 2, 3 Turnover Bldg. 2 (06/30/2008) 2009 Turnover Bldg. 3 (5/31/2009) Construction of Bldg. 4 Pre-selling of Bldg. 4 Construction of Bldg. 3 Turnover Bldg. 4 (12/30/2009) Turnover Bldg. 1 (12/31/2008) Construction of Bldg. 1
  • 52. Development Timetable 2009 2008 2007 Construction of Bldgs. 1, 2, 3 & 4 Turnover Bldgs. 1, 2, 3 & 4 Turnover Bldg. 5 (04/30/2010) 2010 Construction of Bldg. 5 Turnover Bldg. 8 (11/30/2010 ) Turnover Bldg. 6 (8/31/2011 )
  • 53. Price Range Parking Slots : P400,000.00 Laundry Cages: P125,000.00 UNIT PRICES* *Building 5 - as of March 05, 2008
  • 54. Payment Terms CASH TERM * RF for Europe Sales – P25,000.00 for all unit types *
  • 55. DEFERRED CASH – 20/80 Payment Terms
  • 56. Sample Computation Cash Payment
  • 57. THANK YOU!
  • 58. Sample Computation Deferred Cash – Building 5