Merville, Parañaque City
The developer does not authorize any person to render any representation or warranty regarding the project/s mentioned her...
Location Map
Advantages of living in Merville, Parañaque  <ul><li>10 minutes away from Ayala Center, Makati </li></ul><ul><li>10 -15 mi...
Proximate Establishments  <ul><li>San Juan de Dios </li></ul><ul><li>Makati Medical Center </li></ul><ul><li>Ospital ng Ma...
Site Development Plan
The Village Mall @ Woodsville  <ul><li>Robinsons Supermarket </li></ul><ul><li>Spa/Salon </li></ul><ul><li>Restaurants/Al ...
 
Building Facilities <ul><li>Gated residential community with 18 meter main road </li></ul><ul><li>Security service with tw...
<ul><li>Provisions for: </li></ul><ul><li>- Individual electric and water meters </li></ul><ul><li>- Cable TV line </li></...
Themed Gardens Nature’s Orchestra The Oasis Nirvana Cove Poet’s Nook Picnic Grove Fun Park Fitness Cove **Building 6 is no...
Nature’s Orchestra
The Oasis
Nirvana Cove
Poet’s Nook
Picnic Grove
Fun Park
Fitness Cove
Floor Description – Bldg 4 Floors Laundry Cages 2nd  – 14th Residential Units Ground Floor Parking
2 nd  to 9 th Residential Units Floor Description – Bldg 5 Ground Floor
2 nd  to 9 th Residential Units Floor Description – Bldg 6 Ground Floor
Project Update*   * As of July 8, 2008 BUILDING %  SOLD %  COMPLETION TURNOVER   DATE 1 99% 30% 31-Dec-08 2 94% 80% 30-Jun...
Project Update*   * As of July 8, 2008 BUILDING %  SOLD %  COMPLETION TURNOVER   DATE 5 78% 0% 30-Apr-10 6 8% 0% 30-Nov-10...
Progress Photos* Bldg. 1 * As of September 16, 2008 View of Bldg.1 HALLWAY TILE INSTALLATION AT 5 TH  FLR . PLASTERING WOR...
Progress Photos* Bldg. 2 and 3 * As of September 16, 2008 View of Bldg.2 Perspective of building 3  HALLWAY Building 2
Progress Photos* Building 4 PREPARATION OF SLAB ON FILL AT AREA 2 CONCRETED SUSPENDED SLAB - 2 ND  FLR.  * As of September...
Progress Photos* Clubhouse * As of September 16, 2008 AERIAL VIEW A CLUBHOUSE CONCRETING OF SWIMMING POOL DECK
Progress Photos* * As of September 16, 2008 View at Main Entrance
Progress Photos* Village Mall Parking Area VIEW AT MAIN ENTRANCE FRONT VIEW * As of September 16, 2008
Typical Floor Plan – Building 1 A B D E F I H C G 2 elevators Seven 2-BR units Two 3-BR units 2 stairwells 1.3 m. wide hal...
Typical Floor Plan  - Building 2 A L B C E F G H J K D I Two Studio units Eight 2-BR units Two 3-BR units
Typical Floor Plan  - Building 3 A D E F I C G B H Five 2-BR units Four 3-BR units
Typical Floor Plan - Building 4  B H A I D E F C G Five 2-BR units Four 3-BR units Building 4 Typical Floor Plan 2 nd  – 1...
Typical Floor Plan – BUILDING 5 Four (4)  - 1BR unit Three (3) - 2BR unit Two (2)  - 3BR unit A I D F B H E C G
Typical Floor Plan – BUILDING 6 Two (2)  - 1BR unit Four (4)  - 2BR unit Two (2)  - 3BR unit
Studio Unit Floor Plan (Bldg. 2) DESCRIPTION AREA (sq.m.) Living / Dining Room 13.18 Kitchen 5.52 Toilet & Bath 3.80 Total...
Unit Mix (Bldg.5)
2 BR Unit Floor Plan (Bldg. 1-3) DESCRIPTION AREA (sq.m.) Living / Dining Room 14.44 Kitchen 4.86 Toilet & Bath 4.77 Maid’...
3 BR Unit Floor Plan (Bldg. 1-3) DESCRIPTION AREA (sq.m.) Living / Dining Room 19.40 Kitchen 4.50 Toilet & Bath 1 3.24 Mai...
2-BR with Balcony (Bldg. 4)  Unit Area =  45.00 sq.m  Balcony =  6.00 sq.m
3-Bedroom with Balcony (Bldg. 4)  Unit Area =  60.00 sq.m  Balcony =  6.00 sq.m
1 Bedroom (Bldg. 5) units A & I  32.00 sqm.  units D & F
2 Bedroom (Bldg. 5) 45.00-sqm. unit + 3.60-sqm. balcony  Units B & H Unit E
3 Bedroom (Bldg. 5) 64.00-sqm. unit + 3.60-sqm. balcony  Units C & G
Unitized Floor Plan- 1 Bedroom units A & H - 37.05 sqm.
Unitized Floor Plan- 2 Bedroom (A) units D & E- 50.38 sqm.
Unitized Floor Plan- 2 Bedroom (B) units B & G- 50.87 sqm.
Unitized Floor Plan- 3 Bedroom units C & F- 68.38 sqm.
Unit Deliverables   Living/ Dining Kitchen BR Toilet Utility Flooring Ceramic Tiles Ceramic Tiles Laminated Wood Ceramic T...
Principal Architect :   Albert S. Yu and Associates Structural Engineers : Aromin & Sy + Associates, Inc. Mechanical Engin...
Development Timetable 2008 2007 2006 Construction of Bldg. 2 Pre-selling of Bldgs. 1,  2, 3 Turnover Bldg. 2 (06/30/2008) ...
Development Timetable 2009 2008 2007 Construction of Bldgs. 1, 2, 3 & 4 Turnover Bldgs. 1, 2, 3 & 4 Turnover Bldg. 5 (04/3...
Price Range Parking Slots   :  P400,000.00 Laundry Cages:  P125,000.00 UNIT PRICES* *Building 5 - as of March 05, 2008
Payment Terms CASH TERM * RF for Europe Sales – P25,000.00 for all unit types *
DEFERRED CASH – 20/80 Payment Terms
Sample Computation Cash Payment
THANK YOU!
Sample Computation Deferred Cash – Building 5
Upcoming SlideShare
Loading in...5
×

Woodsville

447

Published on

0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total Views
447
On Slideshare
0
From Embeds
0
Number of Embeds
0
Actions
Shares
0
Downloads
21
Comments
0
Likes
0
Embeds 0
No embeds

No notes for slide

Woodsville

  1. 1. Merville, Parañaque City
  2. 2. The developer does not authorize any person to render any representation or warranty regarding the project/s mentioned herein. The developer is subject to Philippine laws relative to the development and marketing of the project/s contained herein and the distribution of this material.  This material should neither be distributed nor viewed in countries, states and/or jurisdictions where relevant restrictions are being enforced. Persons receiving this material are thus advised to inform themselves about and observe any such restrictions, and consult a lawyer, if necessary. Disclaimer
  3. 3. Location Map
  4. 4. Advantages of living in Merville, Parañaque <ul><li>10 minutes away from Ayala Center, Makati </li></ul><ul><li>10 -15 minutes away from Fort Bonifacio, and the domestic and international airports </li></ul><ul><li>Near commercial establishments </li></ul><ul><ul><li>SM Bicutan/ SM Sucat </li></ul></ul><ul><ul><li>Market Market </li></ul></ul><ul><ul><li>Alabang Town Center </li></ul></ul><ul><ul><li>Festival Mall </li></ul></ul><ul><li>Accessible via SLEX (South Luzon Expressway) and C5 Road </li></ul><ul><li>Efficient transportation and road networks </li></ul><ul><li>Part of the growing upscale communities in South of Makati </li></ul>
  5. 5. Proximate Establishments <ul><li>San Juan de Dios </li></ul><ul><li>Makati Medical Center </li></ul><ul><li>Ospital ng Maynila </li></ul><ul><li>Asian Hospital </li></ul><ul><li>Muntinlupa Hospital </li></ul><ul><li>Alabang Medical Center </li></ul><ul><li>Paranaque Medical Center </li></ul><ul><li>Olivares Medical Center </li></ul><ul><li>PAREF School </li></ul><ul><li>La Salle </li></ul><ul><li>San Beda Alabang </li></ul><ul><li>Singapore International School </li></ul><ul><li>Asia Pacific College </li></ul><ul><li>AMA Computer College </li></ul><ul><li>Assumption – Makati </li></ul><ul><li>Colegio de Santa Rosa – Makati </li></ul><ul><li>Makati Science High School </li></ul>Medical Facilities Educational Institutions
  6. 6. Site Development Plan
  7. 7. The Village Mall @ Woodsville <ul><li>Robinsons Supermarket </li></ul><ul><li>Spa/Salon </li></ul><ul><li>Restaurants/Al Fresco </li></ul><ul><li>Laundry Shops </li></ul><ul><li>Drug stores </li></ul>
  8. 9. Building Facilities <ul><li>Gated residential community with 18 meter main road </li></ul><ul><li>Security service with two controlled entry points </li></ul><ul><li>Two (2) passenger elevators per tower </li></ul><ul><li>Overhead water tank and underground cistern </li></ul><ul><li>for ample water supply </li></ul><ul><li>Laundry cages at roof deck (sold separately) </li></ul><ul><li>Stand-by power generator for common areas and </li></ul><ul><li>selected outlet in each unit </li></ul><ul><li>Intercom and Security Lock per building at drop-off </li></ul><ul><li>Mailboxes </li></ul><ul><li>Garbage bins for centralized garbage disposal system </li></ul><ul><li>Automatic smoke detectors and fire sprinkler system for all units </li></ul>
  9. 10. <ul><li>Provisions for: </li></ul><ul><li>- Individual electric and water meters </li></ul><ul><li>- Cable TV line </li></ul><ul><li>- Telephone line per unit </li></ul><ul><li>- Opening for owner-supplied window-type air conditioner </li></ul><ul><li> at living room and bedrooms </li></ul><ul><li>Mechanical ventilation for kitchen and toilets </li></ul>Typical Residential Features
  10. 11. Themed Gardens Nature’s Orchestra The Oasis Nirvana Cove Poet’s Nook Picnic Grove Fun Park Fitness Cove **Building 6 is now renamed as Building 8
  11. 12. Nature’s Orchestra
  12. 13. The Oasis
  13. 14. Nirvana Cove
  14. 15. Poet’s Nook
  15. 16. Picnic Grove
  16. 17. Fun Park
  17. 18. Fitness Cove
  18. 19. Floor Description – Bldg 4 Floors Laundry Cages 2nd – 14th Residential Units Ground Floor Parking
  19. 20. 2 nd to 9 th Residential Units Floor Description – Bldg 5 Ground Floor
  20. 21. 2 nd to 9 th Residential Units Floor Description – Bldg 6 Ground Floor
  21. 22. Project Update* * As of July 8, 2008 BUILDING % SOLD % COMPLETION TURNOVER DATE 1 99% 30% 31-Dec-08 2 94% 80% 30-Jun-08 3 88% 17% 31-Mar-09 4 65% 0% 30-Sep-09
  22. 23. Project Update* * As of July 8, 2008 BUILDING % SOLD % COMPLETION TURNOVER DATE 5 78% 0% 30-Apr-10 6 8% 0% 30-Nov-10 7 0% 0% VM 97%
  23. 24. Progress Photos* Bldg. 1 * As of September 16, 2008 View of Bldg.1 HALLWAY TILE INSTALLATION AT 5 TH FLR . PLASTERING WORKS AT LEDGES FACING MAIN ENTRANCE
  24. 25. Progress Photos* Bldg. 2 and 3 * As of September 16, 2008 View of Bldg.2 Perspective of building 3 HALLWAY Building 2
  25. 26. Progress Photos* Building 4 PREPARATION OF SLAB ON FILL AT AREA 2 CONCRETED SUSPENDED SLAB - 2 ND FLR. * As of September 16, 2008
  26. 27. Progress Photos* Clubhouse * As of September 16, 2008 AERIAL VIEW A CLUBHOUSE CONCRETING OF SWIMMING POOL DECK
  27. 28. Progress Photos* * As of September 16, 2008 View at Main Entrance
  28. 29. Progress Photos* Village Mall Parking Area VIEW AT MAIN ENTRANCE FRONT VIEW * As of September 16, 2008
  29. 30. Typical Floor Plan – Building 1 A B D E F I H C G 2 elevators Seven 2-BR units Two 3-BR units 2 stairwells 1.3 m. wide hallway
  30. 31. Typical Floor Plan - Building 2 A L B C E F G H J K D I Two Studio units Eight 2-BR units Two 3-BR units
  31. 32. Typical Floor Plan - Building 3 A D E F I C G B H Five 2-BR units Four 3-BR units
  32. 33. Typical Floor Plan - Building 4 B H A I D E F C G Five 2-BR units Four 3-BR units Building 4 Typical Floor Plan 2 nd – 14 th Floor
  33. 34. Typical Floor Plan – BUILDING 5 Four (4) - 1BR unit Three (3) - 2BR unit Two (2) - 3BR unit A I D F B H E C G
  34. 35. Typical Floor Plan – BUILDING 6 Two (2) - 1BR unit Four (4) - 2BR unit Two (2) - 3BR unit
  35. 36. Studio Unit Floor Plan (Bldg. 2) DESCRIPTION AREA (sq.m.) Living / Dining Room 13.18 Kitchen 5.52 Toilet & Bath 3.80 Total Area 22.50
  36. 37. Unit Mix (Bldg.5)
  37. 38. 2 BR Unit Floor Plan (Bldg. 1-3) DESCRIPTION AREA (sq.m.) Living / Dining Room 14.44 Kitchen 4.86 Toilet & Bath 4.77 Maid’s Room 4.16 Bedroom 1 6.40 Master’s Bedroom 10.37 Total Area 45.00
  38. 39. 3 BR Unit Floor Plan (Bldg. 1-3) DESCRIPTION AREA (sq.m.) Living / Dining Room 19.40 Kitchen 4.50 Toilet & Bath 1 3.24 Maid’s Room 4.50 Bedroom 1 7.40 Bedroom 2 7.10 Master’s T&B 4.00 Master’s Bedroom 9.86 Total Area 60.00
  39. 40. 2-BR with Balcony (Bldg. 4) Unit Area = 45.00 sq.m Balcony = 6.00 sq.m
  40. 41. 3-Bedroom with Balcony (Bldg. 4) Unit Area = 60.00 sq.m Balcony = 6.00 sq.m
  41. 42. 1 Bedroom (Bldg. 5) units A & I 32.00 sqm. units D & F
  42. 43. 2 Bedroom (Bldg. 5) 45.00-sqm. unit + 3.60-sqm. balcony Units B & H Unit E
  43. 44. 3 Bedroom (Bldg. 5) 64.00-sqm. unit + 3.60-sqm. balcony Units C & G
  44. 45. Unitized Floor Plan- 1 Bedroom units A & H - 37.05 sqm.
  45. 46. Unitized Floor Plan- 2 Bedroom (A) units D & E- 50.38 sqm.
  46. 47. Unitized Floor Plan- 2 Bedroom (B) units B & G- 50.87 sqm.
  47. 48. Unitized Floor Plan- 3 Bedroom units C & F- 68.38 sqm.
  48. 49. Unit Deliverables   Living/ Dining Kitchen BR Toilet Utility Flooring Ceramic Tiles Ceramic Tiles Laminated Wood Ceramic Tiles Ceramic Tiles Wall Plastered painted/ painted drywall Plastered painted/ painted drywall Plastered painted/ painted drywall Ceramic tiles and plastered painted Plastered painted/ painted drywall Ceiling Painted slab soffit/ Gypsum Bulkhead Painted slab soffit/ Gypsum Bulkhead Painted slab soffit/ Gypsum Bulkhead Painted gypsum board Painted slab soffit Others Incandescent lighting fixtures Base cabinet, stainless steel sink Incandescent lighting fixtures Water closet, lavatory Incandescent lighting fixtures
  49. 50. Principal Architect : Albert S. Yu and Associates Structural Engineers : Aromin & Sy + Associates, Inc. Mechanical Engineers : L. R. Punzalan & Associates Electrical Engineers : Mar Alix and Associates Sanitary Engineers : NBF Consulting Engineers General Contractor : SPES Construction, Inc. Project Team
  50. 51. Development Timetable 2008 2007 2006 Construction of Bldg. 2 Pre-selling of Bldgs. 1, 2, 3 Turnover Bldg. 2 (06/30/2008) 2009 Turnover Bldg. 3 (5/31/2009) Construction of Bldg. 4 Pre-selling of Bldg. 4 Construction of Bldg. 3 Turnover Bldg. 4 (12/30/2009) Turnover Bldg. 1 (12/31/2008) Construction of Bldg. 1
  51. 52. Development Timetable 2009 2008 2007 Construction of Bldgs. 1, 2, 3 & 4 Turnover Bldgs. 1, 2, 3 & 4 Turnover Bldg. 5 (04/30/2010) 2010 Construction of Bldg. 5 Turnover Bldg. 8 (11/30/2010 ) Turnover Bldg. 6 (8/31/2011 )
  52. 53. Price Range Parking Slots : P400,000.00 Laundry Cages: P125,000.00 UNIT PRICES* *Building 5 - as of March 05, 2008
  53. 54. Payment Terms CASH TERM * RF for Europe Sales – P25,000.00 for all unit types *
  54. 55. DEFERRED CASH – 20/80 Payment Terms
  55. 56. Sample Computation Cash Payment
  56. 57. THANK YOU!
  57. 58. Sample Computation Deferred Cash – Building 5
  1. A particular slide catching your eye?

    Clipping is a handy way to collect important slides you want to go back to later.

×