• Like

Loading…

Flash Player 9 (or above) is needed to view presentations.
We have detected that you do not have it on your computer. To install it, go here.

  • Full Name Full Name Comment goes here.
    Are you sure you want to
    Your message goes here
    Be the first to comment
    Be the first to like this
No Downloads

Views

Total Views
169
On Slideshare
0
From Embeds
0
Number of Embeds
0

Actions

Shares
Downloads
0
Comments
0
Likes
0

Embeds 0

No embeds

Report content

Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
    No notes for slide

Transcript

  • 1. Readiness of Room Area of room Readiness ofProgramme Course Department Level Room Type Wall & Id/Name in Sqm flooring Painting MASTERS MASTERS IN IN COMPUTER COMPUTER APPLICATIO APPLICATIO POSTMCA NS NS GRADUATE Seminar Hall AB302 135.1 Ready Ready
  • 2. Readiness of Readiness of AirElectrification furniture/fixtu Conditioning& Lighting resReady Ready Planned
  • 3. Administrative Area Readiness of Readiness of Readiness ofRoom Area of room Readiness of Air Room Type Wall & Electrification furniture/fixtuId/Name in Sqm flooring Conditioning Painting & Lighting res FacultyAB007 Room 11.22 Ready Ready Ready Ready Planned Cabin forAB007A Head of Dept 11.22 Ready Ready Ready Ready Planned Cabin forAB007B Head of Dept 11.22 Ready Ready Ready Ready Planned FacultyAB008 Room 40.08 Ready Ready Ready Ready Planned FacultyAB106 Room 40.08 Ready Ready Ready Ready Planned FacultyAB205 Room 40.08 Ready Ready Ready Ready Planned FacultyAB306 Room 40.08 Ready Ready Ready Ready Planned FacultyAB407 Room 40.08 Ready Ready Ready Ready Planned FacultyAB410 Room 67.04 Ready Ready Ready Ready Planned FacultyDB114 Room 44.4 Ready Ready Ready Ready Planned Principal DirectorsMB001 Office 33.21 Ready Ready Ready Ready Planned Main / AdministrativMB002 e Office 303.11 Ready Ready Ready Ready Planned ReceptionMB003 Area 10.68 Ready Ready Ready Ready Not Available Cabin forMB004 Head of Dept 10.7 Ready Ready Ready Ready PlannedMB004A Board Room 22.08 Ready Ready Ready Ready Planned Exam ControlMB005 Office 33.21 Ready Ready Ready Ready Planned FacultyMB010 Room 20.04 Ready Ready Ready Ready PlannedMB016 Security 10.26 Ready Ready Ready Ready Not AvailableMB016A Maintenance 10.26 Ready Ready Ready Ready Not Available HousekeepinMB017 g 10.26 Ready Ready Ready Ready Not Available Pantry forMB017A Staff 10.26 Ready Ready Ready Ready Not Available PlacementMB018 Office 34.34 Ready Ready Ready Ready Planned FacultyMB108 Room 40.08 Ready Ready Ready Ready Planned DepartmentMB111 Office 22.24 Ready Ready Ready Ready Planned
  • 4. DepartmentMB111A Office 20.24 Ready Ready Ready Ready Planned Cabin forMB111B Head of Dept 10.05 Ready Ready Ready Ready Planned FacultyMB115 Room 32.76 Ready Ready Ready Ready Planned FacultyMB210 Room 20.04 Ready Ready Ready Ready Planned DepartmentMB211 Office 20.79 Ready Ready Ready Ready Planned DepartmentMB214 Office 20.24 Ready Ready Ready Ready Planned DepartmentMB214A Office 20.24 Ready Ready Ready Ready Planned Cabin forMB214B Head of Dept 10.05 Ready Ready Ready Ready Planned FacultyMB218 Room 32.76 Ready Ready Ready Ready PlannedMB302 Other Office 33.21 Ready Ready Ready Ready Planned DepartmentMB307 Office 20.24 Ready Ready Ready Ready Planned DepartmentMB307A Office 20.24 Ready Ready Ready Ready Planned Cabin forMB307B Head of Dept 10.05 Ready Ready Ready Ready PlannedMB310 Central Store 42.29 Ready Ready Ready Ready Planned FacultyMB311 Room 32.76 Ready Ready Ready Ready Planned
  • 5. Amenities Area Readiness of Readiness of Readiness ofRoom Area of room Readiness of Air Room Type Wall & Electrification furniture/fixtuId/Name in sqm flooring Conditioning Painting & Lighting resAB004 Toilet 33.21 Ready Ready Ready Ready PlannedAB006 Toilet 33.21 Ready Ready Ready Ready PlannedAB105 Toilet 34.34 Ready Ready Ready Ready PlannedAB204 Toilet 34.34 Ready Ready Ready Ready PlannedAB305 Toilet 34.34 Ready Ready Ready Ready PlannedAB406 Toilet 34.34 Ready Ready Ready Ready PlannedBH Boys Hostel 398.69 Ready Ready Ready Ready PlannedDB001 Toilet 33.12 Ready Ready Ready Ready PlannedDB101 Toilet 33.12 Ready Ready Ready Ready PlannedDB109 Toilet 33.12 Ready Ready Ready Ready Planned Girls CommonDB118 Room 100.65 Ready Ready Ready Ready PlannedDB201 Toilet 33.12 Ready Ready Ready Ready PlannedDB210 Toilet 33.12 Ready Ready Ready Ready Planned Boys CommonDB219 Room 100.65 Ready Ready Ready Ready PlannedG HOST Girls Hostel 635.68 Ready Ready Ready Ready PlannedGH Guest House 97.02 Ready Ready Ready Ready PlannedMB008 Toilet 33.21 Ready Ready Ready Ready PlannedMB009 Toilet 34.34 Ready Ready Ready Ready Planned First aid cumMB011 Sick Room 33.21 Ready Ready Ready Ready Planned StationeryMB012 Store 33.21 Ready Ready Ready Ready PlannedMB107 Toilet 34.34 Ready Ready Ready Ready PlannedMB209 Toilet 33.21 Ready Ready Ready Ready PlannedMB305 Toilet 33.21 Ready Ready Ready Ready Planned PrincipalsPQ Quarter 110.4 Ready Ready Ready Ready AvailableSH004 Cafeteria 161.7 Ready Ready Ready Ready Planned
  • 6. Instructional Area - Common Facilities Readiness of Readiness of Readiness of Room Area of room Readiness of AirRoom Type Wall & Electrification furniture/fixtu Id/Name in Sqm flooring Conditioning Painting & Lighting resComputerCenter AB201 220.02 Ready Ready Ready Ready PlannedLibrary&Reading Room LIB 690.36 Ready Ready Ready Ready Planned
  • 7. DEPT CR AREA TR AREA LABS AREA SH AREA CSE 10 670.4 2 66.42 8 536.32 1 135.12 IT 8 534.48 2 80.44 10 668.1 1 134.35 ECE 10 670.4 2 75.5 11 737.43 2 269.3 EEE 7 468.36 1 33.12 10 668.1 1 134.35MECH 3 200.43 1 33.12 5 332.09 0 0MBA 3 200.89 1 33.12 0 0 1 135.12MCA 3 201.12 2 66.42 2 132.64 1 135.12