1. Log submittal with office clerk. Office clerk inputs job into
“TES Shop Drawing Log” prog...
X
Shop Drawing Review Process
TES Shop Drawing Program
08/06/13 3
X
Shop Drawing Review Process
1. Reviewer checks a hard copy against relevant construction
documents.
2. TES is not respon...
X
Shop Drawing Review Process
Check
Conformance with design concept and the information shown
in the construction document...
X
Shop Drawing Review Process
Shop Drawing Review Form
Location: T:Project Management
08/06/13 6
X
Shop Drawing Review Process
Shop Drawing Review Form
Location: T:Project Management
08/06/13 7
X
Shop Drawing Review Process
1. After PM review, complete Shop Drawing Review Form to be
sent back with shop drawings.
2....
X
Shop Drawing Review Process
• Shop Drawings – drawings, diagrams, schedules, and other
data specially prepared for work ...
X
Shop Drawing Review Process
Routing of Submittals
08/06/13 10
X
Shop Drawing Review Process
• Submittals are prepared by contractor, architect prepares
contract documents.
• Purpose of...
X
Shop Drawing Review Process
• Architect reviews and approves or takes appropriate action
upon contractor’s submittals.
•...
X
Shop Drawing Review Process
• Inadequate submittal time in contract
• No submittal Schedule
• Late submittals
• Forced s...
CRITICAL PATH METHOD (CPM)
CONCLUSION . . .
THANK YOU.
Upcoming SlideShare
Loading in...5
×

120328 shop drawing review

519

Published on

Published in: Business, Technology
0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total Views
519
On Slideshare
0
From Embeds
0
Number of Embeds
1
Actions
Shares
0
Downloads
27
Comments
0
Likes
0
Embeds 0
No embeds

No notes for slide

Transcript of "120328 shop drawing review"

  1. 1. Sharing our Guidance Shop Drawing Review Process Presenter: Eric Baluch
  2. 2. X Shop Drawing Review Process 1. Log submittal with office clerk. Office clerk inputs job into “TES Shop Drawing Log” program. 2. Office Clerk scans drawings and places scan under shop drawing directory with received date, then returns drawings to reviewer. 3. Shop drawings must be processed within 5 business days TES Engineering Review Process 08/06/13 2
  3. 3. X Shop Drawing Review Process TES Shop Drawing Program 08/06/13 3
  4. 4. X Shop Drawing Review Process 1. Reviewer checks a hard copy against relevant construction documents. 2. TES is not responsible for means and methods. 3. Shop drawings received that were not specified to be submitted for review should be marked “not reviewed” on commentary submittal sheet. 4. Highlight conformance, mark red differences in red. 5. Discuss differences with PM and whether they are acceptable Review Process 08/06/13 4
  5. 5. X Shop Drawing Review Process Check Conformance with design concept and the information shown in the construction documents. Do Not Check Accuracy or completeness of details, such as quantities, dimensions, weights or gauges, fabrication processes, construction means or methods, coordination of the work with other trades or construction safety precautions, all of which are the sole responsibility of the contractor. What to check and what not to check 08/06/13 5
  6. 6. X Shop Drawing Review Process Shop Drawing Review Form Location: T:Project Management 08/06/13 6
  7. 7. X Shop Drawing Review Process Shop Drawing Review Form Location: T:Project Management 08/06/13 7
  8. 8. X Shop Drawing Review Process 1. After PM review, complete Shop Drawing Review Form to be sent back with shop drawings. 2. PM performs final review of shop drawing review form, corrections made, PM signs. 3. Review form copy sent with each copy of shop drawing being sent back (pdf if sent electronically). 4. Transmittal filled out and attached. 5. Inform OC of completion. Shop Drawing Review Form 08/06/13 8
  9. 9. X Shop Drawing Review Process • Shop Drawings – drawings, diagrams, schedules, and other data specially prepared for work by the contractor • Product data – illustrations, schedules, performance charts, instructions, brochures, diagrams, other information furnished by contractor • Samples – physical examples which illustrate materials, equipment, workmanship Types of Submittals 08/06/13 9
  10. 10. X Shop Drawing Review Process Routing of Submittals 08/06/13 10
  11. 11. X Shop Drawing Review Process • Submittals are prepared by contractor, architect prepares contract documents. • Purpose of submittals is to demonstrate the way by which the contractor proposes to conform to the design concept. • Contractor has reviewed and approved submittals. • Submittals are required to do the work. Contactor’s Role in Submittals 08/06/13 11
  12. 12. X Shop Drawing Review Process • Architect reviews and approves or takes appropriate action upon contractor’s submittals. • Limited role of architect.  Additional Recommendations • Log and track each submittal. • Do not review submittals not required by the contract documents. Architect’s Role in Submittals 08/06/13 12
  13. 13. X Shop Drawing Review Process • Inadequate submittal time in contract • No submittal Schedule • Late submittals • Forced substitutions Problems that Arise with Submittals 08/06/13 13
  14. 14. CRITICAL PATH METHOD (CPM) CONCLUSION . . . THANK YOU.