FY 2011 Industrial Wastewater Utilization and Treatment Facility Refurbishment and Upgrade
FY 2011 Industrial Wastewater Utilization and Treatment Facility Refurbishment and Upgrade
FY 2011 Industrial Wastewater Utilization and Treatment Facility Refurbishment and Upgrade
FY 2011 Industrial Wastewater Utilization and Treatment Facility Refurbishment and Upgrade
FY 2011 Industrial Wastewater Utilization and Treatment Facility Refurbishment and Upgrade
FY 2011 Industrial Wastewater Utilization and Treatment Facility Refurbishment and Upgrade
FY 2011 Industrial Wastewater Utilization and Treatment Facility Refurbishment and Upgrade
FY 2011 Industrial Wastewater Utilization and Treatment Facility Refurbishment and Upgrade
FY 2011 Industrial Wastewater Utilization and Treatment Facility Refurbishment and Upgrade
FY 2011 Industrial Wastewater Utilization and Treatment Facility Refurbishment and Upgrade
FY 2011 Industrial Wastewater Utilization and Treatment Facility Refurbishment and Upgrade
FY 2011 Industrial Wastewater Utilization and Treatment Facility Refurbishment and Upgrade
FY 2011 Industrial Wastewater Utilization and Treatment Facility Refurbishment and Upgrade
FY 2011 Industrial Wastewater Utilization and Treatment Facility Refurbishment and Upgrade
FY 2011 Industrial Wastewater Utilization and Treatment Facility Refurbishment and Upgrade
FY 2011 Industrial Wastewater Utilization and Treatment Facility Refurbishment and Upgrade
Upcoming SlideShare
Loading in...5
×

Thanks for flagging this SlideShare!

Oops! An error has occurred.

×
Saving this for later? Get the SlideShare app to save on your phone or tablet. Read anywhere, anytime – even offline.
Text the download link to your phone
Standard text messaging rates apply

FY 2011 Industrial Wastewater Utilization and Treatment Facility Refurbishment and Upgrade

740

Published on

Presentation to Moffett Restoration Advisory Board: …

Presentation to Moffett Restoration Advisory Board:

FY 2011 Industrial Wastewater Utilization and Treatment Facility Refurbishment and Upgrade (Groundwater Reuse Project)

Ken Kono, Project Manager, NASA Ames Research Center

Published in: Education, Technology, Business
0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total Views
740
On Slideshare
0
From Embeds
0
Number of Embeds
1
Actions
Shares
0
Downloads
22
Comments
0
Likes
0
Embeds 0
No embeds

Report content
Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
No notes for slide

Transcript

  • 1. FY 2011 Industrial Wastewater Utilization and Treatment Facility Refurbishment and Upgrade (Groundwater Reuse Project) Ken Kono, Project Manager NASA Ames Research Center March 11, 2010
  • 2. PROJECT GOAL UTILIZE AVAILABLE GROUNDWATER DISCHARGES TO MEET ALL INDUSTRIAL WATER NEEDS OF NASA AMES ARC JET COMPLEX AND UNITARY PLAN WIND TUNNELS
  • 3. ARC JET COMPLEX UTILIZES 110,000 GALLONS PER DAY* OF POTABLE WATER TO OPERATE THE STEAM VACUUM SYSTEM *OPERATING DAY, APPROX. 170 OPERATING DAYS/YEAR
  • 4. UNITARY PLAN WIND TUNNELS UTILIZES 60,000 GALLONS PER DAY* OF POTABLE WATER TO MEET FACILITY COOLING REQUIREMENTS *OPERATING DAY, APPROX. 170 OPERATING DAYS/YEAR
  • 5. ACTIVE PUMP AND TREAT FACILITIES AT AMES NASA RGRP Sept. 2001 WATS Nov. 1998 MEW N.101 Oct. 1998
  • 6. PRELIMINARY ENGINEERING PHASE • ASSESS WATER QUALITY AND QUANTITY • ASSESS EXISTING SOURCE INFRASTRUCTURE • DEFINE NPDES REQUIREMENTS
  • 7. IN SITU SDI (SILT DENSITY INDEX) TESTING AT TREATMENT FACILITIES
  • 8. CURRENT DISCHARGE RATE FACILITY AVERAGE FLOW DESTINATION REMARKS (gallons per day) N 101 (MEW) 179,000 STEVENS CREEK VIA 6” DIA. PIPE, PARTIAL RE-USE AT N271 NASA RGRP 22,000 STEVENS CREEK JOINS N 101 PIPE WATS 95,000 STORM WATER VIA STORM WATER RETENTION BASIN CONVEYANCE SYSTEM TOTAL FLOW = 296,000 GALLONS PER DAY OR OVER 108 MILLION GALLONS PER YEAR IS AVAILABLE FOR RE-USE CURRENTLY, LESS THAN 10% IS RE-USED
  • 9. DAILY PEAK DEMAND WATER FLOW DIAGRAM 53,000 GAL 296,000 GAL UNUSED GROUNDWATER 126,000 GAL CONSOLIDATED COMBINED DISCHARGE TO GROUNDWATER STEVENS CREEK 243,000 GAL R.O. FACILITY 73,000 GAL 170,000 GAL CONCENTRATE PERMEATE 0.85 MG PERMEATE STORAGE 110,000 GAL 60,000 GAL ARC JET UNITARY PLAN COMPLEX WIND TUNNELS
  • 10. ANNUAL WATER FLOW DIAGRAM (MG = MILLION GALLONS) 66 MG 108 MG UNUSED GROUNDWATER 79 MG CONSOLIDATED COMBINED DISCHARGE TO GROUNDWATER STEVENS CREEK 42 MG R.O. FACILITY 13 MG 29 MG CONCENTRATE PERMEATE 0.85 MG PERMEATE STORAGE 10 MG 19 MG ARC JET UNITARY PLAN COMPLEX WIND TUNNELS
  • 11. EXISTING DISCHARGE AND DISTRIBUTION FLOW DIRECTION
  • 12. ASSESS EXISTING TREATMENT FACILITY 2002 - 2006 EXISTING REVERSE OSMOSIS VESSELS CONSERVED APPROXIMATELY 7 MGAL/YEAR OF POTABLE WATER
  • 13. MODEL EXISTING AND PROPOSED PIPING SYSTEM
  • 14. WORK WITH THE STATE WATERBOARD • NOTIFY THE BOARD OF NASA’S INTENT • SUBMIT APPLICATION FOR NPDES PERMIT
  • 15. PROJECT SCHEDULE •PRELIMINARY ENGINEERING SEPT 2009 – MAR 2010 •FINAL DESIGN APRIL 2010 – OCT 2010 •CONSTRUCTION FEB 2011 – OCT 2011
  • 16. QUESTIONS?

×