    1. Petroleum Program Update Former Naval Air Station Moffett Field November 13, 2008 RAB Meeting Wilson Doctor Navy Project Manager 1
    2. Overview • Background • Closures • Current Projects • Upcoming Projects • Summary 2
    3. Background • Navy removed tanks • Water Board lead agency • Environmental Screening Levels (ESLs) – Screening for Environmental Concerns at Sites with Contaminated Soil and Groundwater, California Regional Water Quality Control Board San Francisco Bay Region 3
    4. Closure or NFA • Closure for petroleum underground storage tanks (USTs) • “No Further Action” (NFA) for petroleum above-ground storage tanks (ASTs), pipelines, etc. • Conditional upon additional information 4
    5. Additional Fuel System Components at Building 29 5
    6. Additional Fuel System Components at Building 29 • No Further Action letter 5/27/08 • Final ‘Additional Fuel System Components at Building 29 Completion Report and Request for Closure’ 6/26/08 • Two inactive pipelines associated with Building 29 – Metal; inactive since 1960s – 8-inch diameter, 3,640 feet long – 3-inch diameter, 4,880 feet long • Soil sampling every 50 feet • Sampling results were below action levels • Fieldwork completed in NOV 2007 6
    7. USTs 121 & 122 • USTs 121 & 122 closure letter 9/2/08 • UST 121 – 250 gal., diesel, removed 1987 • UST 122 – 500 gal., gasoline, removed 1987 • Soil and groundwater sampling results presented low risk 7
    8. ASTs 100, 101, 129, 132 and 133 • NFA letter former ASTs 100, 101, 129, 132, and 133 dated 9/9/08 • “Phase III Basewide Tank Closure Report, No Further Action” • Soil and groundwater sampling results below ESLs • AST 100 – 200 gal., removed 1992, diesel • AST 101 – 200 gal., removed unknown, diesel • AST 129 – 18 gal., removed 1994, diesel • AST 132 & 133 – removed 1994, 125 gal. each, hydraulic fluid 8
    9. AST 52 • Former AST 52 NFA letter 10/28/08 • “Phase III Basewide Tank Closure Report, No Further Action” • Removed 1950s • 25,000 gal., lubricating oil • Soil sampling results below action levels • Petroleum in groundwater not detected 9
    10. ASTs 103 and 104 • ASTs 103 and 104 NFA 11/4/08 • “Phase III Basewide Tank Closure Report, No Further Action” • AST 103, removed 1994, 350 gal., diesel – No evidence of leak • AST 104, removed 1994, 190 gal., diesel – Leak not visible – Soil samples below ESLs – Petroleum constituents not detected in groundwater 10
    11. Current Projects • Former Aircraft Wash Rack • Site 5 Channel Deposit • Building 29 and Building 55 Pipelines • Building 55 Sump • Site 14 11
    12. Former Aircraft Wash Rack • Draft “Investigation Report for Former Aircraft Wash Rack” dated 10/10/08 • Former concrete pad with drain for washing aircraft • Soil and groundwater sampling • Recommend NFA; sampling results show low risk • Next step: Resolve comments 12
    13. Site 5 Channel Deposit • Draft “Site 5 Channel Deposit Investigation Report” dated 10/20/08 • Groundwater sampling of sand channel deposit • Site 5 tanks formerly used to store fuel • Recommend no further action for groundwater in channel deposit; low risk 13
    14. Building 29 and Building 55 Pipelines 14
    15. Building 29 and Building 55 Pipelines • Final “Investigation and Closure Report for Building 29 and Building 55 Pipelines” dated 11/5/08 • Soil sampling along inactive pipelines • Building 29 pipelines – Aviation gasoline – Inactive since 1950s – 900 ft, 2-inch and 3-inch diameter, metal • Building 55 pipeline – Boiler fuel – Inactive since at least 1994 – 1400 ft, 3-inch diameter, metal • Recommend closure 15
    16. Building 55 Sump • Building 55 sump • Sump installed during the Building 55 pipeline investigation in 2005 • Work Plan FEB 2008 – Removed sump, soil sampling, and groundwater monitoring • Preparing draft report 16
    17. Building 55 Sump 17
    18. Site 14 • Final Work Plan February 2008 – Site characterization – Installed 7 additional groundwater monitoring wells – Four quarters groundwater sampling • New wells and 9 existing wells • Complete monitoring and evaluate data 18
    19. Site 14 19
    20. Upcoming Projects • Petroleum site characterization/sampling: • Site 20 – soil and groundwater sampling • Former Navy Exchange gas station – soil sampling • ASTs 94, 95, 118 – Removed/left in place early 90’s – 500 to 1,000 gal., gasoline – Soil and groundwater sampling • AST 102 soil sampling – Removed 1994, 55 gal., diesel – Soil sampling 20
    21. Upcoming Projects • Site 5 ‘dry wells’ soil sampling • USTs 85 and 85A – Removed 1995 – 1,000 gal., aviation gasoline – Groundwater sampling • Tank 25A – Removed 1994, oil-water separator – Clarify site description • UST 58 – Removed 1994 – 300 gal., oily water – Soil and groundwater sampling 21
    22. Summary • Moffett Field Petroleum Program – Background – Closures – Current Projects – Upcoming Projects 22

    + Steve WilliamsSteve Williams, 2 years ago

    custom

    401 views, 0 favs, 1 embeds more stats

    Presentation by Wilson Doctor of the Navy.

    More info about this document

    © All Rights Reserved

    Go to text version

    • Total Views 401
      • 399 on SlideShare
      • 2 from embeds
    • Comments 0
    • Favorites 0
    • Downloads 2
    Most viewed embeds
    • 2 views on http://www.nuqu.org

    more

    All embeds
    • 2 views on http://www.nuqu.org

    less

    Flagged as inappropriate Flag as inappropriate
    Flag as inappropriate

    Select your reason for flagging this presentation as inappropriate. If needed, use the feedback form to let us know more details.

    Cancel
    File a copyright complaint
    Having problems? Go to our helpdesk?

    Categories