Former NAS Moffett FieldHangar 1 Removal Action Update        Bryce Bartelma, PG       Navy BRAC PMO West          May 10,...
Project Objective• Control release of PCBs from Hangar 1 in accordance  with EE/CA (July 2008) and Action Memorandum  (Dec...
Continued Monitoring and                Protection Measures• Increased biological activity• Increased storm water and grou...
Increased Biological Activity & Mitigation• No Burrowing Owls• Discourage Incipient  Nest Building by  Ravens and House  F...
Increased Storm Water ManagementProtection of Grassy Areas with       Runoff Pumped to Holding Tanks   Heavy Plastic Sheet...
RAB Tour – March 14, 2012           6
Permanent Roof Access• Roof Ridge Access for FAA Beacon and Holiday Star• Mock-up Display for Navy and NASA Engineers     ...
Progress – January 23         8
Progress – April 26        9
Mansard Panel Removal Completed               10
Zone 6 – Siding Removal          11
Palo Alto Perspective         12
Schedule• Fieldwork in zones 1 – 3  Nearly Complete• Fieldwork in zones 4 – 6  Ongoing• Complete mezzanine and  touch-ups,...
Questions?             Point of Contact:               Scott Anderson            BRAC Environmental                  Coord...
Upcoming SlideShare
Loading in …5
×

Hangar One Update to Moffett RAB May 10, 2012

640 views
591 views

Published on

Published in: Education, Technology
0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total views
640
On SlideShare
0
From Embeds
0
Number of Embeds
142
Actions
Shares
0
Downloads
2
Comments
0
Likes
0
Embeds 0
No embeds

No notes for slide

Hangar One Update to Moffett RAB May 10, 2012

  1. 1. Former NAS Moffett FieldHangar 1 Removal Action Update Bryce Bartelma, PG Navy BRAC PMO West May 10, 2012 RAB Meeting 1
  2. 2. Project Objective• Control release of PCBs from Hangar 1 in accordance with EE/CA (July 2008) and Action Memorandum (December 2008)  Demolition of interior structures  Removal of contaminated siding  Application of weather-resistant coating to steel frame 2
  3. 3. Continued Monitoring and Protection Measures• Increased biological activity• Increased storm water and ground surface protection during rainy season• Navy and NASA air monitoring data demonstrates control of air emissions 3
  4. 4. Increased Biological Activity & Mitigation• No Burrowing Owls• Discourage Incipient Nest Building by Ravens and House Finches• Brandt’s Cormorant Rescue 4
  5. 5. Increased Storm Water ManagementProtection of Grassy Areas with Runoff Pumped to Holding Tanks Heavy Plastic Sheeting and Treatment System 5
  6. 6. RAB Tour – March 14, 2012 6
  7. 7. Permanent Roof Access• Roof Ridge Access for FAA Beacon and Holiday Star• Mock-up Display for Navy and NASA Engineers 7
  8. 8. Progress – January 23 8
  9. 9. Progress – April 26 9
  10. 10. Mansard Panel Removal Completed 10
  11. 11. Zone 6 – Siding Removal 11
  12. 12. Palo Alto Perspective 12
  13. 13. Schedule• Fieldwork in zones 1 – 3 Nearly Complete• Fieldwork in zones 4 – 6 Ongoing• Complete mezzanine and touch-ups, confirmation sampling and demobilize September 2012• Submit After Action Completion Report Winter 2012 13
  14. 14. Questions? Point of Contact: Scott Anderson BRAC Environmental Coordinator (619) 532-0938 scott.d.anderson@navy.mil 14

×