Your SlideShare is downloading. ×
0
Hangar 1 rab update nov 29 2012
Hangar 1 rab update nov 29 2012
Hangar 1 rab update nov 29 2012
Hangar 1 rab update nov 29 2012
Hangar 1 rab update nov 29 2012
Hangar 1 rab update nov 29 2012
Hangar 1 rab update nov 29 2012
Hangar 1 rab update nov 29 2012
Hangar 1 rab update nov 29 2012
Upcoming SlideShare
Loading in...5
×

Thanks for flagging this SlideShare!

Oops! An error has occurred.

×
Saving this for later? Get the SlideShare app to save on your phone or tablet. Read anywhere, anytime – even offline.
Text the download link to your phone
Standard text messaging rates apply

Hangar 1 rab update nov 29 2012

396

Published on

0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total Views
396
On Slideshare
0
From Embeds
0
Number of Embeds
1
Actions
Shares
0
Downloads
1
Comments
0
Likes
0
Embeds 0
No embeds

Report content
Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
No notes for slide

Transcript

  • 1. Former NAS Moffett FieldHangar 1 Removal Action Update Bryce Bartelma, PG Salient Federal Solutions supporting Navy BRAC PMO West November 29, 2012 RAB Meeting 1
  • 2. Project Objective• Control release of PCBs from Hangar 1 in accordance with EE/CA (July 2008) and Action Memorandum (December 2008)  Demolition of interior structures  Removal of contaminated siding  Application of weather-resistant coating to steel frame 2
  • 3. Final Material Removed July 19, 2012 3
  • 4. Final Scaffolding Removed October 18, 2012 4
  • 5. Remaining Removal Action Tasks • Mezzanine prep and coat • Final coating touch ups • Soil excavations and confirmation sampling • Concrete slab washing and confirmation sampling • Perimeter Storm Drain clean-out • Demobilize 5
  • 6. Hangar 1 Interactive CDhttp://historicproperties.arc.nasa.gov 6
  • 7. Hangar 1 CERCLA ProcessEE/CA Focused and Removal Proposed Record of Land Use FeasibilityAction Action Plan Decision Controls StudyMemo 7
  • 8. Schedule• NTCRA Demobilization December 2012• Draft After Action Completion Report January 2013• Focused Feasibility Study April 2013• Proposed Plan June 2013• Public Meeting (tentative) July 2013 8
  • 9. Questions? Point of Contact: Scott Anderson BRAC Environmental Coordinator (619) 532-0938 scott.d.anderson@navy.mil 9

×