• Share
  • Email
  • Embed
  • Like
  • Save
  • Private Content
Production planning and control
 

Production planning and control

on

  • 743 views

 

Statistics

Views

Total Views
743
Views on SlideShare
743
Embed Views
0

Actions

Likes
0
Downloads
22
Comments
0

0 Embeds 0

No embeds

Accessibility

Categories

Upload Details

Uploaded via as Microsoft PowerPoint

Usage Rights

© All Rights Reserved

Report content

Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
  • Full Name Full Name Comment goes here.
    Are you sure you want to
    Your message goes here
    Processing…
Post Comment
Edit your comment

    Production planning and control Production planning and control Presentation Transcript

    • Er.Sartaj Singh Bajwa
      • Preparation of production budget
      • Devising manufacturing methods and sequence of processes
      • Prescribing the type of machines and equipments
      • To set plant layout
      • To design tools
      • To prepare operation sheets & instruction cards
      Er.Sartaj Singh Bajwa
      • To undertake time and motion study for operations
      • To estimate material requirements
      • To estimate manpower requirements
      • To prepare master schedule of production
      Er.Sartaj Singh Bajwa
      • Planning
      • Routing ( to decide the path & sequence of production)
      • Scheduling ( working out the time required to perform each operation and also the time required to complete the entire process)
        • Production schedule (schedule the amount of work)
        • Master schedule (schedule for weekly/monthly production)
        • Manufacturing schedule (schedule for type of process to be used for production)
      • Loading is assignment of work to the operators at their machines or work places
      Er.Sartaj Singh Bajwa
      • Dispatching includes :
        • Movement of material/tools to workstations
        • Beginning of work on each station
        • Recording of time and cost involved in each operation
        • Supervision of work
      • Following Up ( removing bottle necks in the flow of work )
      • Inspection
      • Corrective ( rescheduling , repair & maintenance )
      Er.Sartaj Singh Bajwa