Production planning and control

822
views

Published on


0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total Views
822
On Slideshare
0
From Embeds
0
Number of Embeds
0
Actions
Shares
0
Downloads
26
Comments
0
Likes
0
Embeds 0
No embeds

Report content
Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
No notes for slide

Transcript

  • 1. Er.Sartaj Singh Bajwa
  • 2.
    • Preparation of production budget
    • Devising manufacturing methods and sequence of processes
    • Prescribing the type of machines and equipments
    • To set plant layout
    • To design tools
    • To prepare operation sheets & instruction cards
    Er.Sartaj Singh Bajwa
  • 3.
    • To undertake time and motion study for operations
    • To estimate material requirements
    • To estimate manpower requirements
    • To prepare master schedule of production
    Er.Sartaj Singh Bajwa
  • 4.
    • Planning
    • Routing ( to decide the path & sequence of production)
    • Scheduling ( working out the time required to perform each operation and also the time required to complete the entire process)
      • Production schedule (schedule the amount of work)
      • Master schedule (schedule for weekly/monthly production)
      • Manufacturing schedule (schedule for type of process to be used for production)
    • Loading is assignment of work to the operators at their machines or work places
    Er.Sartaj Singh Bajwa
  • 5.
    • Dispatching includes :
      • Movement of material/tools to workstations
      • Beginning of work on each station
      • Recording of time and cost involved in each operation
      • Supervision of work
    • Following Up ( removing bottle necks in the flow of work )
    • Inspection
    • Corrective ( rescheduling , repair & maintenance )
    Er.Sartaj Singh Bajwa