Global Energy Group Capability Presentation
Upcoming SlideShare
Loading in...5
×
 

Global Energy Group Capability Presentation

on

  • 2,519 views

 

Statistics

Views

Total Views
2,519
Views on SlideShare
2,508
Embed Views
11

Actions

Likes
1
Downloads
0
Comments
0

3 Embeds 11

http://www.linkedin.com 8
http://www.slideshare.net 2
https://www.linkedin.com 1

Accessibility

Categories

Upload Details

Uploaded via as Microsoft PowerPoint

Usage Rights

© All Rights Reserved

Report content

Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
  • Full Name Full Name Comment goes here.
    Are you sure you want to
    Your message goes here
    Processing…
Post Comment
Edit your comment

Global Energy Group Capability Presentation Global Energy Group Capability Presentation Presentation Transcript

  • A presentation of the Global Energy Group April 2009
  • Mission Statement: “We strive to be our clients first choice in the provision of integrated  management services and solutions” Vision Statement: “To develop the Global Energy Group into a world class provider of  client solutions whilst providing a safe and rewarding working environment for our people.” Roy MacGregor - Chairman
  • The Group contracting and service-based company supporting the  International Energy Industry. flexible approach to supporting clients, offering turnkey project  solutions or stand-alone services in: project engineering  fabrication  specialist welding  inspection  supply-chain management  managed resources  construction  Whether we are supporting a segment of our clients project, or an  integrated delivery of service, our commitment to safety and quality is without exception.
  • Background Based in the UK (Scotland) – with worldwide operations  Employs in excess of 2200 staff and contract personnel  Dynamic Growth :  £28m by financial year end March 06  £65m by financial year end March 07  £96m by financial year end March 08  £130m by financial year end March 09 - forecast  Integrated Management System: 1SO 9001 Certified by DnV 
  • Global Core Values People Pioneers People Global’s People make our success possible We will provide a secure, safe and challenging environment, promote a  positive attitude and encourage personal development We will create a culture centred on care, respect and reward  Integrity Global’s integrity is not negotiable We will maintain the highest moral and ethical standards  We will honour our commitments and reflect respect and trust in all  relationships Quality Global’s quality is assured by performance excellence We aim to deliver above and beyond our client‟s expectations  We will research and develop innovative solutions to remain best in class 
  • Marketplace CIVIL OFFSHORE CONSTRUCTION DRILLING UTILITIES & SUBSEA & INFRASTRUCTURE MARINE PETROCHEM / RENEWABLE ENERGY LNG
  • Organisational Chart Corporate Company Secretary Board of Directors HSEQ Department Finance Director Organisational Technical Services Development Group Business Communications Development Group Training Global Global Global Global Global Energy Global Resources Construction Inspection Fabrication Services Pipelines Global Global Global Energy Global Pipeline Reel Isleburn Resources Construction Services Solutions Les Taylor Global Project Maris Subsea Sea Ocean Construction Services Global Highland Global SCS Group Organisation Chart March 2009
  • Fabrication Fabrication Oil & Gas Fabrication and Engineering Oil & Gas Operators  Subsea Installation Contractors  Decommissioning Specialists  Mobile Drilling Rigs Operators  Renewable Energy Offshore Wind Farms  Wave and tidal energy development  Nuclear  M & E Utilities; Infrastructure Road & Rail Bridge construction and  installation Replacement and refurbishment of Lock  Gates Power Generation Site blasting and painting  Port facility enhancements  Single source for all disciplines  MOD Engineering solutions 
  • Client : Subsea 7 Project : Jura Manifold / Towhead Fabrication Typical Project 420 tonne Manifold /  Towhead Sales Value £3.0 M  Contract award to  completion 18 weeks Project Scope Procurement of structural materials, fabrication and painting.  Receipt of F.I Duplex piping materials and  valves, fabrication, installation, painting, flushing & pressure testing Fabrication, fitting, integration with control panels, flushing & pressure testing of  small bore control tubing Full FAT / SIT inside workshop  Transport from Nigg Workshop and load out to barge at Nigg Quayside 
  • Client : ConocoPhillips Project Britannia Satellites Topsides Skid Units Fabrication Typical Project 9 No Skid Units from 10 tonnes to  140 tonnes Sales Value £3.6 M  Contract award to completion  12 months Project Scope Procurement of structural materials, fabrication  and painting. Receipt of piping materials and  equipment, fabrication, installation, painting, insula tion, flushing & pressure testing Electrical & Instrumentation installation and testing  FullzFAT / SIT inside workshop  Transport from Nigg Workshop and load out to ships  at Nigg Quayside
  • Client : MOD / DML RAH – Reactor Handling Containment Module Project Fabrication Typical Project 600 tonne Module for refuelling of  nuclear submarines Sales Value £5.4 M  Contract award to completion 24  months Project Scope Procurement of structural materials, fabrication and painting.  Outfitting of equipment and testing  Erection on barge and float out into drydock  Installation over drydock onto skidding system  Full load test and functional test 
  • Client : Aquamarine Project Prototype Wave Generator (Oyster) Fabrication Typical Project Oyster Prototype Wave  Generator 240 tonnes Sales Value £2.4 M  Contract award to completion  12 months Project Scope Procurement of structural materials, fabrication and painting.  Outfitting of equipment and testing  Trial operation in workshop  Pressure testing of system  Transport to quayside and load out 
  • Inspection Inspection REEL Group - Principle Services: NDT – MPI and DPI Disciplines  NDT – Eddy Current and Ultrasonic Inspection  Lifting Equipment Inspection and Testing  Hoisting, Handling and Rotary Drilling Tool Inspection  Special Periodic Surveys (ABS, DNV, USCG)  Wall Thickness and Corrosion Monitoring Services  Drilling Derrick and Mast Inspection  DROPS Hazard Inspections  Rope Access Services  Electromagnetic Wire Rope Inspection  Wire Rope Services  Spooling Services  Diving Services 
  • Client: Technip Vessel: CSO Deep Pioneer Project: Wire Rope NDT Inspection & high pressure lubrication Inspection Typical Project In-service Maintenance project  2 NDT Wire Rope Examiners  Inspection carried out whilst operating  offshore Ghana, West Africa Project Scope NDT Inspection of main 120mm Dia VLS  Lift Wire Pressure Lubrication of main 120mm Dia  VLS Lift Wire Verify Rope is fit and safe for service in a  3:1 operating system Ensuring correct spooling and running of  rope
  • Client: Bird Air Location: Reliant Stadium Project: Roof Replacement Inspection Typical Project $ 2 Million Sales  38 Personnel  Nov 2008 to Mar 2009 (20 weeks) - Houston  Replace and repair roof after Hurricane Ike  Project Scope Supply specialist rope access teams  Undertake repairs of existing roof  structure Replace all roof material sections 
  • Energy Services - Drilling Energy Services Principle Services Full Turnkey Projects  Project Specific Solutions  Services Capability Project Management / Supervision  Survey, Workscope & Budget Development  Structural / Mechanical & Piping Engineering &  Draughting (Repair & Upgrade) Specialist Equipment Sourcing & Procurement  Marine Systems Upgrade, Overhaul & Repair  Special Periodic Survey associated with Class  Approval Construction & Commissioning of Structural /  Mechanical / Hydraulic / Pneumatic & Electrical Systems Accommodation Upgrade & New Build 
  • Client: Essar Oil Vessel: Essar Wildcat Project: Major Reactivation Program Energy Services Typical Project Turn-key Project (Reactivation)  £7 Million Sales  260 Personnel at peak (160 direct Global  Employee‟s) Dec 2007 to Mar 2008 (10 weeks) - Invergordon  Project Scope Inspection of Marine, Drilling & Subsea Equipment  Prepare detailed SOW, Budget & Project Plan  Liaise with DnV – Class Approval Recertification  Prepare & Manage Rig move from open waters to  dock-side facility Undertake Repairs/Refurbishment /Overhaul of  Primary/Secondary Structure, Piping, Mechanical Equipment, Electrical SCR‟s, & Accommodation Undertake upgrade design, pre-  fabrication, installation & commissioning.
  • Client: Oceanrig A/S Vessel: Leiv Eriksson Project: Major North Sea Upgrade Energy Services Typical Project Turn-key Project (North Sea Upgrade)  £5.5 Million Sales  160 Personnel at peak (145 direct Global Employee‟s)  Sep 2007 to Jan 2008 (17 weeks) – Tow from Angola to Las  Palmas, Las Palmas Yard & Tow to UKCS Project Scope Prepare detailed SOW, Budget & Project Plan  Subsea Systems Support Assemblies Installation  Design, Fabrication, Installation & Commissioning of 96,000  ltr Slop Tank (Gross Weight “Steel”: 30Te). Design, Fabrication & Installation of New  Bulkheads, Enclosures & Associated Platforms Design, Fabrication & Installation of Cantilevered W/C  ROV LARS Fabrication, Installation (Re-route) Exhaust & Engine Air  Intake Vents
  • Energy Services – Marine Energy Services Principle Service Launch System Structural / Mechanical Design  Subsea Tooling Design  Topside Equipment Structural/Piping Integration  Mob/Demob Management & Execution  Service Specific Capability Feasibility Study  Conceptual Design & Budget Proposal  Detailed Design & Analysis  Installation / Commissioning Procedure Development  Project Management  Project Delivery 
  • Client: Subsea 7 Vessel: DSV Seven Sisters Project: ROV LARS Integration Energy Services Typical Project Shelter Deck Extension  Integrate 2 No W/C ROV LARS  £0.5 Million Sales  Oct 2007 to Mar 2008  Project Scope Survey of Vessel, ROV Equipment and propose conceptual design solutions  Prepare detailed SOW, Budget & Project Plan  Detailed Design c/w relevant Structural /Mechanical Analysis & Drawings  Liaise with DnV – Class Approval Management  Develop Installation / Commissioning Procedures and relevant Risk Assessments  Provide Site Management & Engineering Support 
  • Client: Integrated Subsea Services Vessel: DSV Normand Tonjer Project: ROV & Air Dive LARS Energy Integration Services Typical Project New Mezzanine Deck  Integrate 4 No W/C ROV LARS  Integrate 1 No Air Dive LARS  £0.6 Million Sales  Oct 2007 to Mar 2008  Project Scope Survey of Vessel, ROV & Air Dive Equipment and propose conceptual design solutions  Prepare detailed SOW, Budget & Project Plan  Detailed Design c/w relevant Structural /Mechanical Analysis & Drawings  Liaise with DnV – Class Approval Management  Develop Installation / Commissioning Procedures and relevant Risk Assessments  Provide Site Management & Engineering Support  Provide Site Installation Personnel for Installation 
  • Energy Services Downstream Global Energy Services Principle Services Specialist Welding Services  (semi / automatic / STT) Pipespool Fabrication for Petrochem / LPG /  Power Generation Mechanical / Electrical / Instrumentation /  Commissioning Mechanical Contractor Support  Managed Site Services 
  • Client: Whessoe / AMEC Site: Milford Haven Wales Project: Dragon LNG Plant Energy Services Typical Project Construction of New Build LNG Plant  Project value £36 million  Construction phase for Global June  07 till June 09 Project Services workforce 315 peak  personnel Project Scope Provision of Site Project Managed Team  Provision of Specialist Welding services Tanks  Provision of Mechanical / Piping / Fabrication / Rigging / Welding services  Qualification of all WPQ‟S for Client  Provision of Equipment / Plant Hire and Material Consumable Purchase to Client  Project included Construction activities covering Fabrication, M&E, Commissioning  & Testing of Tanks / Jetty Head / PAR & PAU Units / Process Pipework.
  • Client: Vetco Aibel Site: Haugesund Yard Project: Marathon Alviem FPSO Energy Services Typical Project Construction & Outfitting of Topside  Module Units for FPSO Project Value £18million  Duration of Project 24 months  Project Services workforce 140  personnel peak Project Scope Yard provision of Supervisory / Multi Trades  Construction Fabrication activities  Specialist Welding services  Project included the Construction activities covering Fabrication of Topside Process  Module Units during Yard stay, through to Integration of Modules to Vessel. Project included the Commissioning & Testing of associated M&E products during  Yard and Offshore execution activities.
  • Client: Aker Solutions/Fabricom Site: Ormen Lange LPG Global Project: Ormen Lange Project Energy Services Typical Project Construction of Gas Terminal for  Statoil Project Value - £22M  Duration – 28 months  Project Services Workforce – 360  peak Project Scope Welding, Pipefitting to support PAU‟s  Full contract management workscope  Full logistics workscope  M /E & Instrumentation  Commissioning of Plant 
  • Global Pipeline Solutions Pipelines & Specialist Welding Areas of Expertise include: In-House Welding Research and Development.  Weld Procedure Development and Qualification  Manual, Semi-Automatic and Automatic welding systems, welding  techniques and associated processes. Total site fabrication and construction solutions to include Welding, NDE, FJC  and Inspection Services (Utilising CRC-Evans FJC and NDE companies). Management of all aspects associated with Spoolbase Operations – Project  Management, Commercial, Engineering, Operations (All disciplines). Applications to include SCR‟s Flowlines, Bundles, Double Joints, Quad  Joints, Hex Joints, Spools, Risers, Pipe In Pipe, Cladded Flowlines and HDPE Linepipe. Material Welding and Metallurgy to include Carbon Steel, Stainless  Steel, Duplex, Super Duplex, Inconel Clad, 5% Chrome, 13% Chrome and Titanium. Services provided to both Onshore and Offshore pipeline construction  markets. Expertise of working within Europe, Africa, Middle East, Russia, U.S.A and  South America
  • Client: Subsea 7 Site: Seven Oceans Pipelines & Project: Shell BC 10 (Brazil) Specialist Welding Typical Project 10” Diameter X up to 40mm WT  Very restrictive criteria to meet  Mechanised GTAW / GMAW Process  GPS Personnel requested for WPQ  Successful qualification of WPQ (inc.  fatigue) Ongoing Welding onboard Subsea 7 Vessel  All welds to-date completed by GPS  4 Riser assemblies now installed  ( 3 welds per assembly) Work should continue till end May 2009 
  • Client: Murphy’s Pipelines UK Site: Brecon Beacon, Wales Pipelines & Project: BG / Transco Main Trunkline Specialist Welding Typical Project 10” Diameter X up to 40mm WT  Very restrictive criteria to meet  Mechanised GTAW / GMAW Process  GPS Personnel requested for WPQ  Successful qualification of WPQ (inc.  fatigue) Ongoing Welding onboard Subsea 7  Vessel All welds to-date completed by GPS  4 Riser assemblies now installed  ( 3 welds per assembly)
  • Kupe Project New Zealand Spool Base Pipelines & Specialist Welding Typical Project . 28km of 12” rigid flow line including 2km of fatigue sensitive flow line (SCR Standard) 300m of 12” dupex
  • Resource Management Resource Management Resource Management Contract Recruitment  Staff Recruitment  Campaign Recruitment  Oil and Gas / Energy Sectors Drilling  Subsea & Marine  Technical  Professional  Civil Construction Sector Construction Management  Civil Engineering  Mechanical & Electrical  Surveying & Architecture  Trades & Labour 
  • Supply Chain Solutions Supply Chain Solutions Principle Services: Out-sourced contracts support  Out-sourced procurement  Materials Management  Logistics Management  Supply chain consultancy services  Quality Management  Supplier compliance and capability  audit Technical material consultancy 
  • Global Construction Construction Principle Services Full Turnkey Projects  Project Specific Solutions  Services Capability Project Management / Supervision  Conceptual Design & Budget Proposals  Detailed Design & Build Contractor  Provision of Construction Trades Teams for Project  Execution Service Sector Commercial, Housing Associations, Energy  Companies, Utility Companies, Local & regional Authorities, Private Industry & Power Companies
  • Global Construction Projects Energy Services Typical Project Property Demolition/Conversion for Workshop to  Luxury Office Accommodation £600k Sales  35 Personnel (Various Trades)  Construction Phase: Aug 08 to Jan 09  Project Scope Survey and Proposal Development  Develop Conceptual / Detailed Design  Prepare Budget and Project Plan  Liaison with Statutory Authorities for Design Approval  Procurement  Provision of Project Management, Supervisory and  Trades Labour for demolition, construction and commissioning
  • Global Construction Projects Construction Client: The Highland Council Client: The Highland Council Duration: Sep 2005 – Oct 2006 Value: £290k Value: £2.5 Million Grantown Grammar School Sports Facility Braenock Bridge, Foyers Major new sports hall and changing Demolition of existing old bridge and rooms, complete with ground source heating replacement with new insitu concrete bridge system and all Mechanical & Electrical positioned over a river gorge whilst continuing Services. 50+ Personnel. the flow of traffic at all times.
  • Facilities
  • Global Energy Group International Locations Invergordon Evanton Haugesund Inverness Aberdeen UK Cairo Glasgow Houston Trinidad
  • Aberdeen Corporate Office
  • Inverness North Management HQ
  • Evanton HQ, Fabrication & Machine Shop Fabrication 2 x 6te & 2 x 3te Cranes  Area= 2365m²  Fully Equipped 
  • Deephaven, Evanton Fabrication & Piping Shop Fabrication 4 x 10te Cranes  Area= 1566m²  Fully Equipped 
  • Invergordon Fabrication Shop Fabrication 3 x 10te & 1 x 5te Cranes  Area= 3080m²  Fully Equipped 
  • Invergordon Service Base Energy Services Office Facilities Workshop Facilities Training School
  • Invergordon Base Office Pipelines & Specialist Welding
  • Invergordon Fabrication Shop Fabrication Tie-In Spools and IUTA‟s
  • Nigg Quayside Fabrication Location Frontage Dry  Dock Frontage 420m 300m  Reinforced 240m 900m  Water Depth 4.5m 9.0m  (LAT)  Craneage: up to 1000  tonnes Client Offices  Fully Serviced Client Offices &  Canteen for 30+
  • Nigg Quayside Fabrication Shops Fabrication Shop 4 & 5 (each) Length: 117m  6 Width: 50m  5 4 Height at Crane Hook: 25m  Door: Width 50m Height 25m  Surface: Hard Standing  Craneage:  2 no. 50 tonnes  2 no. 20 tonnes  Shop 6 Length: 63m  Width: 80m  Height at Crane Hook: 35m  Door: Width 50m Height 25m  Surface: Hard Standing  Craneage:  1 no. 120 tonnes 
  • Nigg Yard, Workshop & Client Offices Fabrication
  • Hartlepool Pipelines & Specialist Welding Berths 5 All Tidal Access Depth of Water 8.5m LAT On berths Depth of Water 5.0m LAT Approach Channel
  • Training
  • The Global Training Facility Nigg Trainees and Instructors at  the New Global Training Academy Recognition of Industry shortages  Retaining Industry experience and skills  Fast-track Modern Apprenticeship Programme  Welding, Fabrication & Pipefitting Training  Vocational „on the job‟ learning  Guaranteed job on successful completion of  training
  • Leadership & Management Development The people -
  • JV’s / MOU’s
  • Norwegian JV Bergen Yards Global Energy Services Forklifts 1,5-12 ton.  Terminal tractors and  hangers 20-100 ton. Mobile cranes from 55-220TM  Approx. 100 ton scaffolding  Access control system  Stair towers 
  • Malta Global Project Services 2090m x 50m x 6m graving dry-dock  Dockside cranes of 125T, 80T and 40T.  2 main quays with a total length of 500m  equipped with 2x 40T cranes, 1x 48T, 1x 40T Main workshop, with covered area of  30,000m2 comprising: unit assembly hall  block assembly  panel line bay  plasma and gas cutting machines  hydraulic presses up to 2000T  Other workshops including: Machine shop  Joinery complex  Plate/profile treatment line 
  • Corporate Support HSEQ  Advice & Guidance on Legislation  Operational Involvement & Support  Auditing & Monitoring  Emergency Response Management  Training and Development & Competency  Human Resources  Advice on Employment Legislation  Well Developed and robust IR Policies  Information technology  State of the Art Systems  Global Network Capacity  Group Training  Occupational Development  Leadership & Management Development Programme  Financial  Commercial Advice  Payroll & Accounting Functions 
  • Working with “Global” We listen to our customer‟s business needs  We work in partnership to find appropriate solutions  We seek to deliver ongoing benefits  We provide an integrated services relationship  We help deliver improved performance and cost savings  We work to common objectives with clear lines of  responsibility and accountability We allow our customers to focus on their core activities 
  • ...working together for success