Ibrahim makki  saudi cable company
Upcoming SlideShare
Loading in...5
×
 

Ibrahim makki saudi cable company

on

  • 1,758 views

 

Statistics

Views

Total Views
1,758
Views on SlideShare
1,758
Embed Views
0

Actions

Likes
0
Downloads
15
Comments
0

0 Embeds 0

No embeds

Accessibility

Categories

Upload Details

Uploaded via as Microsoft PowerPoint

Usage Rights

© All Rights Reserved

Report content

Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
  • Full Name Full Name Comment goes here.
    Are you sure you want to
    Your message goes here
    Processing…
Post Comment
Edit your comment

Ibrahim makki  saudi cable company Ibrahim makki saudi cable company Presentation Transcript

  • WELCOME TO SAUDI CABLE COMPANY© Saudi Cable Group Presentation
  • Capabilities in projects Pioneer in supplying cables all customers Extensive Track Record with utilities within the GCC and middle east market. Extensive supply to all mega projects including ministry of electricity and water in Kuwait, MEW in Bahrain, Military city, SEC (LV, MV, HV, EHV), ARAMCO, SABIC, Royal Commissions, Economic cities, Major civil contractors working in mega projects such as the two holy mosques expansions. STC & Telecordia (USA) certified Optical Fiber Facilities etc…………
  • Our ProductsPOWER CABLE Building Wires THHN Flexible Cable LV Cables (up to 1 KV) MV Cables (up to 36 KV) HV Cable Systems (up to 132 KV) EHV Cable Systems (up to 500 KV) Overhead Transmission Line Cable Systems (up to 500 KV)
  • Telecommunication & Specialty CablesCommunications Cables: Metallic Telecommunication Cables Optical Fiber Cables Specialty Cables: FTTH Control Cables Instrumentation Cable Fire Resistance cable Thermocouple cable Signaling Cable Foundation Field bus (FF84)
  • Trading items & Accessories related to our product Terminations & Joints Sealing Ends Cable glands Fitting Material Conduit Splicing material Cable trays Insulators
  • Mobile Site Testing Facility for HV
  • Global CapabilityEmergency response to restore 220 kV vital Power Link in Sri Lanka (within 8 days)
  • Group Capacity 200,000 150,000 100,000 50,000 0 2005 2006 2007 2008 2009 2010 SCC DK MIDAL
  • SCC’s Turnkey Major Experiences Kahramaa Qatar Transmission System Expansion Phase VII [66kV & 220kV]. FEWA Erection of 33kV Double Circuit Overhead Line & Cabling Works in Northern Emirates. DEWA Supply, Installation, Testing & Commissioning of 132kV Cable Laying Works for Qusais East 132/11kV Substation and Associated Works. Saudi Electricity Company Construction & Installation of 110kV Power & FO Cables. DEWA Supply, Installation, Testing & Commissioning of 132kV Cable Laying Works for Sports-1, Ryad & Sport-3 132/11kV Substation and Associated Works. Bahrain Water & Electricity Underground Cable Saudi Electricity Company Construction & Installation of 110kV Power & FO Cables to connect al- Nuzlah-2 S/S with Jeddah Network.26/02/2008 9
  • MASS Projects………..Cont. Quantity Contract Contract Value Project Description (Route Length- Name of Client Country Start/Award kms) DateSupply, Installation, Testing & Commissioningof 132/11kV Cable Laying Works for Qusais AED 21,604,557 29 Dubai Electricity & Dubai, UAE 1/3/2007East, 132/11kV Substations and AssociatedWorks Water Authority (DEWA)Construction of 110kV Cable to Connect Al- Jeddah,Newariyah Substation with Makkah Al- SR 34,064,598 43 21-Mar-07 Saudi ArabiaMukarramah Network SEC-WOAConstruction & Installation of 110kV Power & Jeddah,Fiber Optic Cable to Connect Al-Nuzlah-2 SR 41,527,139 33.6 30-Dec-07 Saudi ArabiaSubstation at with Jeddah Network SEC-WOA220kV Transmission Development (2005-2009)- Phase - II - 220kV Cable Supply, Jointing & SR 40,094,212.5 Bahrain 18-Aug-08Testing (Variation Order) Electricity & Water AuthorityConstruction & Installation of 110kV Power & Jeddah,Fiber Optic Cable to Connect New Al-Nakheel SR 84,891,106 14 28-Sep-08 Saudi ArabiaSubstation at Jeddah SEC-WOA
  • Saudi Cable CompanyOperation Desert Light - Kuwait Electricity Restored In Kuwait After Gulf War in 19 Days
  • Restoring Power to Kuwait Cityimmediately after 1990 invasion of Kuwait © Saudi Cable Group Presentation
  • Saudi Cable CompanyOperation Desert Light - Kuwait CONTRACT ROUTE NUMBER OF EXECUTION PERIOD RATED PHASE No. VALUE LENGTH WORKS STARTING ENDING TOTAL VOLTAGE (US$) (KM) (ITEMS) DATE DATE DAYS I 15,900,000 300 KV 84.262 2,643 31-Mar-91 01-Apr-91 19 II 7,900,000 300 KV 101.700 1,857 05-Apr-91 24-Apr-91 20 III 1,500,000 132 KV 73.520 1,355 02-May-91 08-May-91 7 IV 2,484,000 132 KV 86.857 1,346 13-May-91 05-Jun-91 21 300 KV 48.00 V 6,756,000 132 KV 128.150 2,295 29-May-91 15-Jul-91 45 300 KV 37.580 VI 2,384,874 132 KV 86.964 1,975 03-Sep-91 19-Dec-91 107 300 KV Mainte VII 1,615,000 132/33 KV nance - 03-Sep-91 30-Dec-91 - VIII 2,855,320 33 KV 170.000 - 03-Sep-91 19-Dec-91 107AdditionalEmergency 300 KV Repair 3,323,875 132/33 KV NIL - 03-Sep-91 30-Dec-91 - TOTAL 44,719,069 817.033 11,471Electricity restored in Kuwait after Gulf War in 19 days
  • Lebanon 225 kV Transmission Route Map© Saudi Cable Group Presentation
  • Overhead 225 kV “Backbone” Transmission Line – Lebanon © Saudi Cable Group Presentation
  • Targeted Market Oil & Gas Power & Utilities Petrochemicals Civil & Commercials
  • © Saudi Cable Group Presentation
  • A word of Appreciation
  • Thank you For further informationE-mail: sales&marketing@ saudicable .com www.saudicable.com