PP- T Codes

8,513 views

Published on

Published in: Technology, Business
1 Comment
6 Likes
Statistics
Notes
  • More than 5000 registered SAP consultants.Search for SAP online training Providers at http://www.todaycourses.com
       Reply 
    Are you sure you want to  Yes  No
    Your message goes here
No Downloads
Views
Total views
8,513
On SlideShare
0
From Embeds
0
Number of Embeds
12
Actions
Shares
0
Downloads
499
Comments
1
Likes
6
Embeds 0
No embeds

No notes for slide

PP- T Codes

  1. 1. PP Transaction Codes MATERIAL CREATE-GENERAL MM01 MM11 CHANGE MM02 MM12 MM13 FLAG FOR DELETION MM06 MM16 DISPLAY MM03 MM19 DISPLAY CHANGES MM04 MM14 MM17 MMAM OTHER MMBE MMPV MMRV MM50 MMSC MM60 ARCHIVING(MATERIAL) MM71 MM72 BILL OF MATERIAL (MATERIAL BOM) CS01 CS02 CS03 EXTRAS CS28 CS20 EVALUATION/BOM CS11 EXPLOSION/MATERIAL CS12 BOM CS13 WORK CENTRES CR01 CR02 CR03 CA85
  2. 2. CAPACITY CR11 CR12 CR13 HIERARCHY CR21 CR22 CR23 LINE HIERARCHY LDB1 LDB2 LDB3 REPORTING CR60 CR05 CR06 CR07 CR08 WHERE USED CA80 CR15 CR10 EXTRAS CR09 CR41 ROUTING STAD. ROUTING CA01 CA02 CA03 REF. OPERATION SETS CA11 CA12 CA13 RATE ROUTING CA21 CA22 CA23 REF. RATE ROUTING CA31 CA32 CA33 EXTRAS CA85 MASS CHANGES CA95 CA75 DELETE TASK LIST CA99 CA98 REPORTING CA80 WHERE USED LIST CA90 CA70 COST CENTRE
  3. 3. OKKP KS01 KZS2 KA01 KA06 KL01 KP26 SALES AND OPERATIONS PLANNING PRODUCT GROUP MC84 MC86 MC85 GRAPHIC MC91 MC92 PLANNING MC81 FOR PRODUCT GROUP MC82 MC83 MC75 FOR MATERIAL MC87 MC88 MC89 MC74 MC9K VERSION MANAGEMENT MC78 MC80 FLEXIBLE PLANNING MC93 PLANNING MC94 MC95 MC9K TOOLS/PLANNING TYPE MC8A MACRO MC8B MC8C EVENT MC64 MC65 MC66 ROUGH CUT PLANNING MC35 PROFILE MC36 MC37 ENVIRONMENT MC90 ACTIVITY REQT. KSPP KSBL
  4. 4. KSOP CPBL MC9C SETTINGS MC96 DISSAGGRIGATION MC76 MC77 MC75 MC74 FORECASTING INDIVIDUAL FORECAST MP30 MP31 MP32 TOTAL FORECAST MP38 MP33 MP39 MPBT MPDR DEMAND MANAGEMENT PIR MD61 MD62 MD63 MD65 MD66 MD70 EVALUATION MD73 MD79 MD4C MD72 CUSTOMER REQT. MD81 MD82 MD83 REPETITIVE MANUFACTURING MASTER DATA C223 PRODUCT COST PLANNING CKMATSE COSTING RUN L CKMATC SELECTION LIST ON CK40N Master Data MD25
  5. 5. MD26 MD27 MDSA MDSP MEQ1 OPPP MDUS MDUP MDL1 MDL2 MDL3 Planning MD20 MD21 MDAB MDRE MD01 MDBT MD03 MD02 MD43 MD50 MD51 MF52 MF50 MF57 MF51 Evaluations MD04 MD07 MD05 MD06 MDLD MD45 MD46 MD44 MD47 MD48 MD4C MD09 CO46 Planned Order MD11 MD12
  6. 6. MD13 MD16 MD14 MD15 MDUM CO40 CO41 CO48 COR7 COR7_PC COR8 MDVP MDAC LONG TERM PLANNING PALNNING SCENARIO MS31 MS32 MS33 PLANNING RUN MS01 MSBT MS02 MS03 MS50 MS51 MFSO EVALUTIONS MS05 MS06 MSLD MS04 MS07 MS44 MS47 MPS-MASTER SCHEDULE ITEMS TOTAL PLANNING MD40 MDBS MD41 MD42 MD43 MD50 MD51 *** EVALUTION IS SIMILAR TO MRP
  7. 7. PRODUCTION CONTROL ORDER - CREATE CO01 CO07 CO40 CO41 CO08 CO10 CO02 CO03 CONTROL MD04 COHV COMAC CO05N CO04N CO09 GOODS MOVEMENT MF65 MATERIAL STAGING MF68 MB1A MB31 COWBPA CK CONFIRMATION CO1V FOR OPERATION CO14 CO13 CO1L CO1P TOOLS-ARCHIVING CO78 KOAA CAPACITY PLANNING EVALUTION CM01 WORK CENTER VIEW CM02 CM03 CM04 CM05 CM07 EXTENDED EVALUTION CM50 CM51 CM52 LEVELLING CM21 WORK CENTER VIEW CM22
  8. 8. INDIVIDUAL CAPACITY VCM27 CM28 ORDER VIEW CM31 CM32 AVAILABLE CAPACITY CR12 CAPACITY CR13 OP4A OP43
  9. 9. ction Codes IMMEDIETELY SCHEDULE IMMEDIETELY SCHEDULE ACTIVATE IMMEDIETELY SCHEDULE DISPLAY CURRENT DISPLAY AT KEY DATE ACTIVE CHANGES SCHEDULE CHANGES MASS MAINTENANCE CHANGE MATERIAL TYPE STOCK OVERVIEW CLOSE PERIOD ALLOW POSTING TO PREVIOUS PERIOD INSTANT MATERIAL VIEW ENTER STORAGE LOCATIONS MATERIAL LIST ARCHIVE/DELETE DISPLAY ARCHIVE CREATE CHANGE DISPLAY ARCHIVING MASS CHANGES BOM MULTILEVEL STRUCTURE MULTILEVEL SUMMURISED BOM CREATE CHANGE DISPLAY REPLACE
  10. 10. CREATE CHANGE DISPLAY CREATE CHANGE DISPLAY CREATE CHANGE DISPLAY W/C INFORMATION SYSTEM W/C LIST COST CENTRE ASSIGNMENT W/C CAPACITIES W/C HIERARCHY WORK CENTRE CAPACITY CHANGE DOCUMENTS STD. TEXTS TASK LIST ARCHIVING CREATE CHANGE DISPLAY CREATE CHANGE DISPLAY CREATE CHANGE DISPLAY CREATE CHANGE DISPLAY REPLACE W/C REPLACE REF. OP. SET REPLACE PRT WITH ARCHIVING W/O ARCHIVING WORK CENTRE REF. OP. SETS PRODUCTION RESORCE TOOLS
  11. 11. MAINTAIN CONTROLLING AREA CREATE COST CENTRE CREATE COSTING SHEET CREATE PRI. COST ELEMENT CREATE SEC. COST ELEMENT CREATE ACTIVITY TYPE ACTIVITY TYPE/PRICE PLANNING CREATE CHANGE DISPLAY PRODUCT GROUP OVERVIEW CREATE CHANGE DISPLAY TRANSFER PG TO PLANNING CREATE CHANGE DISPLAY TRANSFER MATERIALS TO MATERIAL AVAILABILITY COPY DELETE CREATE CHANGE DISPLAY MATERIAL AVAILABILITY CREATE CHANGE DISPLAY CREATE CHANGE DISPLAY CREATE CHANGE DISPLAY TRANSFER MATERIALS TO DM TRANSFER TO COST CENTRE COST CENTRE PLANNING REPORT
  12. 12. TRANSFER TO ACTIVITY BASED COSTING PLANNING REPORT PROCESSES REPORTING FORECAST PROFILE BREAKDOWN PG PLAN DISPLAY PG PLAN TRANSFER PG TO PLANNING TRANSFER MATERIALS TO DM EXECUTE CHANGE DISPLAY EXECUTE REPROCESS PRINT EXECUTE BACKGROUND PRINT BACKGROUND CREATE CHANGE DISPLAY REQTS. FOR SCINARIO COPY SIMULATED DEPENDENT REQT. COPY TOTAL FORE CAST DISPLAY TOTAL REQT. EXCELL INTERFACE ORDER REPORT CHARECTERISTICS PLANNING CREATE CHANGE DISPLAY PRODUCTION VERTION CREATE Edit EDIT COSTING RUN Create planning calendar
  13. 13. Change planning calendar Display planning calendar Display BOM explosion number Edit BOM explosion number Maintain quota file Explode BOM by date Display project assignment Process project assignment Create production lot Change production lot Display production lot Create planning file entry Display planning file entry Set up planning file entry in background Check planning file entry Total planning online Total planning in background Single-item, single-level planning Single-item, multi-level planning Interactive single-item planning Multi-level, make-to-order planning Multi-level project planning Display planning table Change planning table Planning table by MRP lists Planning table by production list Stock/requirements list Collective access of stock/requirements lis MRP list Collective access of MRP lists Print MRP list Planning result Collective access of planning result Planning situation for a material Planning situation for a product group Cross-plant planning situation Order report Pegged requirements Order progress Create planned order Change planned order
  14. 14. Individual access of planned order Collective access of planned orders Individual conversion of planned order into Collective conversion of planned orders int Convert planned order into purchase requisi Convert individual planned order into produ Collective conversion of planned orders int Partial conversion of planned order into pr Individual conversion of planned order into Collective conversion of planned orders int Partial conversion of planned order into pr Collective availability check Execute action for planned order CREATE CHANGE DISPLAY ON LINE SA BACKGROUND JOB SINGLE ITEM - MULTI LEVEL SINGLE ITEM - SINGLE LEVEL SINGLE ITEM - SALES ORDER SINGLE ITEM PLANNING, PROJECT PLANNING TABLE MRP LIST MATERIAL MRP LIST COLLECTIVE DISPLAY PRINT MRP LIST STOCK/REQUIREMENTS LIST STOCK/REQUIREMENT LIST COLLECTIVE DISPLAY PLANNING SITUATION MATERIAL SITUATION PRODUCT GROUP ON LINE SA BACKGROUND JOB SINGLE ITEM - MULTI LEVEL SINGLE ITEM - SINGLE LEVEL SINGLE ITEM - INTERACTIVE SINGLE ITEM - SALES ORDER SINGLE ITEM PLANNING, PROJECT
  15. 15. WITH MATERIAL WITHOUT MATERIAL FROM PLANNED ORDER COLLECTIVE CONVERTION OF PLANNED ORDER FOR SALES ORDER FOR PROJECT CHANGE DISPLAY STOCK/REQUIREMENTS LIST MASS PROCESSING COLLECTIVE AVAILABILITY CHECK COLLECTIVE RELEASE PRINT AVAILABILITY OVER VIEW STOCK TRANSFER FOR RESERVATION LOG GOODS ISSUE GOODS RECEIPT PACK MATERIAL TIME TICKET DISPLAY CANCEL REQUESTED CONFIRMATIONS PREDEFINED PROCESSES ORDER SETTELMENT DOCUMENTS LOAD ORDERS POOL BACKLOG OVERLOAD VARIABLE WORK CENTER VIEW INDIVIDUAL CAPACITY VIEW ORDER VIEW PLANNING TABLE (GRAPHICAL) PLANNING TABLE (TABULAR)
  16. 16. PLANNING TABLE (GRAPHICAL) PLANNING TABLE (TABULAR) PLANNING TABLE (GRAPHICAL) PLANNING TABLE (TABULAR) CHANGE DISPLAY SHIFT SEQUENCE FACTORY CALENDER
  17. 17. MM Transaction Codes IH09 - Display Material MM01 - Create Material MM02 - Change Material MM03 - Display Material MM50 - List Extendable Materials MMBE - Stock Overview MMI1 - Create Operating Supplies MMN1 - Create Non-Stock Material MMS1 - Create Service MMU1 - Create Non-Valuated Material ME51N - Create Purchase Requisition ME52N - Change Purchase Requisition ME53N - Display Purchase Requisition ME5A - Purchase Requisitions: List Display ME5F - Release Reminder: Purch. Requisition ME5J - Purchase Requisitions for Project ME5K - Requisitions by Account Assignment MELB - Purch. Transactions by Tracking No. ME54 - Release Purchase Requisition ME55 - Collective Release of Purchase Reqs. ME56 - Assign Source to Purch. Requisition ME57 - Assign and Process Requisitions ME58 - Ordering: Assigned Requisitions ME59 - Automatic Generation of POs MB21 - Create Reservation MB22 - Change Reservation MB23 - Display Reservation MB24 - Reservations by Material MB25 - Reservations by Account Assignment MB90 - Output Processing for Mat. Documents MB1B - Transfer Posting MB1C - Other Goods Receipts MBRL - Return Delivery per Mat. Document MI01 - Create Physical Inventory Document MI02 - Change Physical Inventory Document MI03 - Display Physical Inventory Document MI04 - Enter Inventory Count with Document MI05 - Change Inventory Count MI06 - Display Inventory Count MI07 - Process List of Differences
  18. 18. MI08 - Create List of Differences with Doc. MI09 - Enter Inventory Count w/o Document MI10 - Create List of Differences w/o Doc. MI11 - Physical Inventory Document Recount MI20 - Print List of Differences MI21 - Print physical inventory document MI31 - Batch Input: Create Phys. Inv. Doc. MI32 - Batch Input: Block Material MI33 - Batch Input: Freeze Book Inv.Balance MI34 - Batch Input: Enter Count MI35 - Batch Input: Post Zero Stock Balance MI37 - Batch Input: Post Differences MI38 - Batch Input: Count and Differences MI39 - Batch Input: Document and Count MI40 - Batch Input: Doc., Count and Diff. MIBC - ABC Analysis for Cycle Counting MICN - Btch Inpt:Ph.Inv.Docs.for Cycle Ctng MIK1 - Batch Input: Ph.Inv.Doc.Vendor Cons. MIQ1 - Batch Input: PhInvDoc. Project Stock CT01 - Create Characteristic CT02 - Change Characteristic CT03 - Display Characteristic CL01 - Create Class CL02 - Classes CL03 - Display Class CL04 - Delete Class CL2B - Class Types

×