1)    Zombies? 2)   Vampires?3)    Other????
Why has Los Altos continued to losebusinesses and tax revenues for the last 17years? Competition? Poor  Location? Poor ...
   Learn and understand the general tools and process    that city planners, city council and communities use    to:    •...
 Existing general plan (1992) No master plan Existing zoning ordinances updated in  2004 through 2009 Existing parking...
All of theseexistingresources are thetools we use toimplement ourmaster plan.
 Normally a master plan is updated prior to updating the supporting documents. In our particular case, Los Altos proceede...
Downtown Los Altoshas no formal master        plan.
 Traditionallywe have only included the  downtown triangle. Should we include the Civic Center Master  Plan in the downt...
May affect our Master Planning Process: Downtown Parking and Traffic study. This document  will provide us with current b...
  It represents our overall goals and visions  for our future downtown. It gives specific direction to all the other  do...
 Engage   the general community and public to  determine the long term vision for the  downtown triangle and civic center...
   How do you increase vitality and feet on the street?   Do we have businesses, offices, retail and/or residential    u...
 General  Plan (city wide) Master Plan (sometimes there is a Specific  Plan if very detailed) Zoning including permitte...
 Is the project (or Master Plan)  economically viable for the developer and  the City? Does the project (or Master Plan)...
 Itgives them clear rules of engagement for  creating successful projects.
    Statistically for every primary job that is    created 3 additional support jobs are    create to either service the ...
 20,000 sq. ft of new office space provides approximately 100 new employees downtown (5 per 1000; First and Main)  • The ...
 Residential  Units provide approximately 3  persons per household to the downtown area. They normally provide 2.5 break...
 Vibrancy   within a downtown area is created  by the synergy of a good mix of office, retail  and residential. Good loc...
Downtown Office Space – very telling Total comparison between the cities:                             Inventory (sq. ft.)...
 Downtown   Day-Time Population:                     1-mile radius   2-mile radius   Los Altos          5,560            ...
 Historically,it has been very difficult to attract  good restaurants and retailers to Los Altos,  due to the lack of off...
    If we encourage the developer to build a    stepped back 3 story building rather than the two    story currently prop...
   Should the City Council abruptly change from the well    studied (2004 thru 2010), recently approved form based    3 s...
 Threeseparate City committees spent six years getting public input and updating the current zoning ordinances.
   Existing Zoning Code, developed from six years of    Downtown Development Committee work, was created    with a goal t...
 There are many unintended consequences  when a City does not implement a Master  Plan. Those consequences are compounded...
 Impact  on Existing Merchants Impact on the City’s credibility Impact on existing and new developers Impact on the co...
  Participate in the current First and Main gateway  project public review process. Let the City  Council know how you fe...
Laf june 13 presentation final at 4.41pm ymd
Laf june 13 presentation final at 4.41pm ymd
Laf june 13 presentation final at 4.41pm ymd
Laf june 13 presentation final at 4.41pm ymd
Laf june 13 presentation final at 4.41pm ymd
Laf june 13 presentation final at 4.41pm ymd
Laf june 13 presentation final at 4.41pm ymd
Laf june 13 presentation final at 4.41pm ymd
Laf june 13 presentation final at 4.41pm ymd
Laf june 13 presentation final at 4.41pm ymd
Laf june 13 presentation final at 4.41pm ymd
Laf june 13 presentation final at 4.41pm ymd
Laf june 13 presentation final at 4.41pm ymd
Upcoming SlideShare
Loading in...5
×

Laf june 13 presentation final at 4.41pm ymd

191

Published on

Published in: Technology, Business
0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total Views
191
On Slideshare
0
From Embeds
0
Number of Embeds
1
Actions
Shares
0
Downloads
1
Comments
0
Likes
0
Embeds 0
No embeds

No notes for slide

Laf june 13 presentation final at 4.41pm ymd

  1. 1. 1) Zombies? 2) Vampires?3) Other????
  2. 2. Why has Los Altos continued to losebusinesses and tax revenues for the last 17years? Competition? Poor Location? Poor planning? Lack of understanding of what is needed to attract and retain businesses in the downtown?
  3. 3.  Learn and understand the general tools and process that city planners, city council and communities use to: • Attract great restaurants and shops downtown • Breathe new life into the community • Encourage day and evening use • Create the synergy to get “feet on the street” • Understand the economic engines that make downtowns work • Increase tax revenue to the City Encourage you to get more involved in important upcoming planning commission and city council meetings that directly effect the future of our downtown.
  4. 4.  Existing general plan (1992) No master plan Existing zoning ordinances updated in 2004 through 2009 Existing parking plans (1992) and Downtown Parking Opportunities Study 2009 Existing downtown design review guidelines (2009 & 2010)
  5. 5. All of theseexistingresources are thetools we use toimplement ourmaster plan.
  6. 6.  Normally a master plan is updated prior to updating the supporting documents. In our particular case, Los Altos proceeded with updating design review guidelines and parking opportunity studies, and downtown zoning without first creating the downtown master plan. (2004 – 2009) This approach can complicate the process, keep us from reaching our goals and have other unintended consequences.
  7. 7. Downtown Los Altoshas no formal master plan.
  8. 8.  Traditionallywe have only included the downtown triangle. Should we include the Civic Center Master Plan in the downtown master plan. Should these two plans be related to one another. How are these two plans connected, and how do they impact one another.
  9. 9. May affect our Master Planning Process: Downtown Parking and Traffic study. This document will provide us with current base line information so we can project and estimate future parking needs based upon proposed changes to the downtown master plan and zoning. (This is a good thing!  ) Proposed rezoning of portions of downtown that will limit and reduce the current 3 story form based height limitation to two stories. (This may not be a good thing, and could have damaging results – we will discuss later on in this presentation.)
  10. 10.  It represents our overall goals and visions for our future downtown. It gives specific direction to all the other documents used to promote growth, preserve and enhance architectural elements, and implement the overall goals of the Master Plan.
  11. 11.  Engage the general community and public to determine the long term vision for the downtown triangle and civic center. Ask lots of questions Formalize the community and master plan concept. Match Master Plan concepts with any existing City Plan documents to note the differences. Update all related documents as required.
  12. 12.  How do you increase vitality and feet on the street? Do we have businesses, offices, retail and/or residential uses that we want downtown? Do you have the services and businesses you want downtown? Do you want to increase density so that more businesses, offices and residences can move downtown? Do you want to create more open space, meeting space and outdoor social spaces? Do you have enough parking? Will we need more parking in the future? Is the downtown accessible for pedestrians and bicyclists How do I get my favorite store to move here?
  13. 13.  General Plan (city wide) Master Plan (sometimes there is a Specific Plan if very detailed) Zoning including permitted uses, FAR, building heights, set back in parking req., etc. Parking plans / shared parking / plaza etc. Architectural design review guidelines
  14. 14.  Is the project (or Master Plan) economically viable for the developer and the City? Does the project (or Master Plan) meet socio-economic and community needs? Is the project economically sustainable, both socially and environmentally?
  15. 15.  Itgives them clear rules of engagement for creating successful projects.
  16. 16.  Statistically for every primary job that is created 3 additional support jobs are create to either service the new employees or the company directly. These include the restaurant and coffee shop jobs, support retail and support service directly to the primary job created.
  17. 17.  20,000 sq. ft of new office space provides approximately 100 new employees downtown (5 per 1000; First and Main) • The average office employee eats lunch out 2.5 times per week. • Purchases breakfast / coffee 2.5 times per week. • Stays after work 1x per week for cocktails and /or dinner. Thisresults in approximately 600 more meals per week consumed at downtown restaurants and coffee shops.
  18. 18.  Residential Units provide approximately 3 persons per household to the downtown area. They normally provide 2.5 breakfast / coffee shops per week and 2.5 dinners per week and one lunch per week / per person. Each new residential unit would provide approximately 18 new restaurant visits per week complimenting existing office employees during the day. There is a strong benefit to mixed use projects that include retail and office / residential components.
  19. 19.  Vibrancy within a downtown area is created by the synergy of a good mix of office, retail and residential. Good local and regional restaurants will choose to locate in a downtown that has enough daytime population. Site criteria for strong regional and national retailers--as well as unique independents-- require both good daytime population and residential demographics.
  20. 20. Downtown Office Space – very telling Total comparison between the cities: Inventory (sq. ft.) Los Altos 420,450 Mountain View 1,244,860 Palo Alto 1,928,860 Menlo Park 657,400
  21. 21.  Downtown Day-Time Population: 1-mile radius 2-mile radius Los Altos 5,560 24,105 Mountain View 13,015 55,280 Palo Alto 33,630 72,150 Menlo Park 22,170 62,765
  22. 22.  Historically,it has been very difficult to attract good restaurants and retailers to Los Altos, due to the lack of office workers. Unique independents and vibrant regional and national chains look for strong co- tenancy, and thus this amplifies the negative of not enough daytime pop. Los Altos viewed by soft goods retailers and restaurants as “bedroom community.”
  23. 23.  If we encourage the developer to build a stepped back 3 story building rather than the two story currently proposed that provides: * Ground floor retail * More community open space * Wider side walks * More outdoor usable restaurants / retail space * More office space without providing more on- site parking * One floor of underground parking Would this achieve our master planning goals and provide desired community benefits?
  24. 24.  Should the City Council abruptly change from the well studied (2004 thru 2010), recently approved form based 3 story zoning, to a new zoning ordinance limiting buildings to two stories? Should we first understand the unintended consequences of such a dramatic change? What kind of economic effects will this have on the downtown?
  25. 25.  Threeseparate City committees spent six years getting public input and updating the current zoning ordinances.
  26. 26.  Existing Zoning Code, developed from six years of Downtown Development Committee work, was created with a goal to “increase feet on the street.” Their stated goal was to add 895,000 sq. ft. of office space. Limiting downtown buildings to two stories does just the opposite. Most important factor for developers in deciding which cities to enter is consistency of the rules and their application. Constant switching of the zoning rules will inhibit future development and re-development.
  27. 27.  There are many unintended consequences when a City does not implement a Master Plan. Those consequences are compounded when either existing rules are not consistently applied or when they are changed without understanding the long term impact. Why are certain City Council members pursuing this zoning change without going through a master planning process? Why are they in such a hurry?
  28. 28.  Impact on Existing Merchants Impact on the City’s credibility Impact on existing and new developers Impact on the competition Impact on others in the community Impact on the City’s financial health Impact on the City’s image and long term vision for the downtown
  29. 29.  Participate in the current First and Main gateway project public review process. Let the City Council know how you feel. Participate in the public review process regarding council’s current request to restrict downtown zoning to two stories. Next Planning Commission meeting is June 21 st, 2012. Stay connected and informed through participation in Los Altos Forward and other events.