An Introduction
Box-N            BOBR        Bottom Open Bottom Release
Wagon TipplerWT Control Room                                                        Dust Suppression SystemSide Arm Charge...
For removing tramp iron piecesLocation - discharge of Conv. 42A/B, 31A/BEfficient cost-saving recovery of harmfultramp iro...
To detect non-magnetic metallic materials presentLocation - 32A/B head, 38 A/B
Removing left tramp iron piecesLocation - discharge of 32A/B in crusher – to remove any             tramp iron piece prese...
ROD GATES (2+2)   RACK AND PINION GATES (2+2)VIBRATING SCREEN FEEDERS, (2+2) 940               TPH   RING GRANUATOS (CRUSH...
0m        800 MT                                           2m   730 MT                             6.25 m                 ...
Electro-Mechanical System        Wear an tear of contacts because of heating                                 High cost of ...
PLC focuses more on controlDDCMIS focuses more on Human Machine Interface
RESETPCS/BSS/ ZSS               ACKNOWLEDGEMENTNOTIFICATION   TABLE          PCS/BSS/ZSS                    STATUS        ...
EQUIPMENTS                       FUNCTIONS  Conveyors                        Auto /manual operation of gates/  Dust suppre...
It consists of a series of overlapping Heavy Duty Pans (or Flights) thatcarry the material.Used for handling more abrasive...
An Apron Feeder can regulate the flow of material based onvolume. The pan speed and the gate cut off height can be regulat...
A short belt conveyor. The belt is flat and supported on closely spacedidlers or on a smooth slide plate.Belt feeders are ...
Used when only one outlet is used to feed two different belts2 in no. in stage 3Location - Crusher house
Used when only one outlet is used to feed two different belts2 in no. in stage 3Location - Crusher house
More flexibilityMore availability
Location – PH 1 headManual Stone Picking arrangement at conveyor gallery before the crusherhouse shall be provided complet...
DESCRIPTION             STAGE I    STAGE II    STAGE III     BELT CAPACITY        1250 MT     1500 MT     1500 MT       BE...
Santosh Kumar VermaCHP-OPN (Group D)
NTPC Rihand CHP Stage # 3
NTPC Rihand CHP Stage # 3
NTPC Rihand CHP Stage # 3
NTPC Rihand CHP Stage # 3
NTPC Rihand CHP Stage # 3
NTPC Rihand CHP Stage # 3
NTPC Rihand CHP Stage # 3
NTPC Rihand CHP Stage # 3
NTPC Rihand CHP Stage # 3
NTPC Rihand CHP Stage # 3
NTPC Rihand CHP Stage # 3
NTPC Rihand CHP Stage # 3
NTPC Rihand CHP Stage # 3
NTPC Rihand CHP Stage # 3
NTPC Rihand CHP Stage # 3
NTPC Rihand CHP Stage # 3
NTPC Rihand CHP Stage # 3
Upcoming SlideShare
Loading in...5
×

NTPC Rihand CHP Stage # 3

1,861

Published on

Published in: Technology, Business
3 Comments
2 Likes
Statistics
Notes
No Downloads
Views
Total Views
1,861
On Slideshare
0
From Embeds
0
Number of Embeds
0
Actions
Shares
0
Downloads
85
Comments
3
Likes
2
Embeds 0
No embeds

No notes for slide

Transcript of "NTPC Rihand CHP Stage # 3"

  1. 1. An Introduction
  2. 2. Box-N BOBR Bottom Open Bottom Release
  3. 3. Wagon TipplerWT Control Room Dust Suppression SystemSide Arm Charger Coal Discharge Direction Wagon Tippler
  4. 4. For removing tramp iron piecesLocation - discharge of Conv. 42A/B, 31A/BEfficient cost-saving recovery of harmfultramp iron in free-flowing materialsThey are simple to install and have nomaintenanceInstalled over conveyor . .
  5. 5. To detect non-magnetic metallic materials presentLocation - 32A/B head, 38 A/B
  6. 6. Removing left tramp iron piecesLocation - discharge of 32A/B in crusher – to remove any tramp iron piece present in coal before entering crusher - TP 21 – to avoid entry of the same in bunker - TP 27 – to eliminate the same from the coal coming from stockyardInstalled at discharge of conveyors near pulleyILMS includes belt, pulleys, magnet etc.
  7. 7. ROD GATES (2+2) RACK AND PINION GATES (2+2)VIBRATING SCREEN FEEDERS, (2+2) 940 TPH RING GRANUATOS (CRUSHERS ) (2+2)940 TPH BELT FEEDER (2+2) REVERSIBLE BELT FEEDERS (1+1)
  8. 8. 0m 800 MT 2m 730 MT 6.25 m 4m 650 MTCapacity – 800 MT 6m 565 MTHeight - 26.3 m 8m 480 MTNos. – 9 x 2 10 m 395 MT 8.13 m 26.3 m 12 m 310 MT 14 m 225 MT 15 m 170 MT 16 m 140 MT 18 m 85 MT 20 m 45 MT 11.91 m 22 m 18 MT 26.3 m
  9. 9. Electro-Mechanical System Wear an tear of contacts because of heating High cost of installation, maintenance andStage # 1 modification processPLC Easy to modify and implement( Programmable Logic Control )Stage # 2DDCMIS The control system for all the coal handling( Distributed Digital Control drives including conveyors, Dust SuppressionMonitoring and Information System, etc. shall be DDCMISSystem) Except for the Stacker Reclaimer and wagonStage # 3 tippler , which will be controlled by PLC
  10. 10. PLC focuses more on controlDDCMIS focuses more on Human Machine Interface
  11. 11. RESETPCS/BSS/ ZSS ACKNOWLEDGEMENTNOTIFICATION TABLE PCS/BSS/ZSS STATUS PUMP HOUSE ALARM TABLE VENTILATION BELT WEIGHER BYPASSSTATUS TABLE
  12. 12. EQUIPMENTS FUNCTIONS Conveyors Auto /manual operation of gates/ Dust suppression system valves/ dampers, pumps, drives, Paddle feeders Local / remote selection of Mobile trippers over bunkers operation, Belt weighers Status indication, annunciation, interlo Metal Detectors ck and protection of pumps/drives Inline Magnetic separators Suspended Magnets Coal sampling Units Hydraulic scoop Coupling
  13. 13. It consists of a series of overlapping Heavy Duty Pans (or Flights) thatcarry the material.Used for handling more abrasive, heavy and lumpy material. Thematerial is carried on an overlapping metal plate called pans, which ismounted between strands of the conveyor chain.Apron feeders are placed under storage bin for regulating the feedmaterial
  14. 14. An Apron Feeder can regulate the flow of material based onvolume. The pan speed and the gate cut off height can be regulated toprovide an even volumetric feed down stream. .
  15. 15. A short belt conveyor. The belt is flat and supported on closely spacedidlers or on a smooth slide plate.Belt feeders are used for handling fine / free flowing / abrasivematerials. Even properly designed belt feeders are used for handlinglumpy material.Increased redundancy and flexibility
  16. 16. Used when only one outlet is used to feed two different belts2 in no. in stage 3Location - Crusher house
  17. 17. Used when only one outlet is used to feed two different belts2 in no. in stage 3Location - Crusher house
  18. 18. More flexibilityMore availability
  19. 19. Location – PH 1 headManual Stone Picking arrangement at conveyor gallery before the crusherhouse shall be provided complete with stone picking accessoriesFour (4) nos. manual pickersTwo (2) nos. manual pickers shall be positioned on each beltEach manual picker shall cover 3 m long belt stretchDisposal chute from discharge hoods of length up to 2 meters from groundlevelConveyor Gallery shall be 2 meters wide
  20. 20. DESCRIPTION STAGE I STAGE II STAGE III BELT CAPACITY 1250 MT 1500 MT 1500 MT BELT SPEED 3.2 m/s 3.2 m/s 3.2 m/s BELT WIDTH 1400 mm 1400 mm 1400 mm TOTAL NO OF BELTs 29 20 40 TOTAL BELT LENGTH 6.98 Km 6.14 Km 16.93 km TRACK HOPPER CAPACITY 2700 MT 3400 MT 4562.16 MTWAGON TRIPPLER CAPACITY NA NA 194.33 MTPADDLE FEEDER CAPACITY 625 TPH 1125 TPH 1125 TPH CRUSHER CAPACITY 625 TPH 940 TPH 825 TPH TOTAL NO OF BUNKERs 16 20 18 BUNKER CAPACITY 800 MT 1140 MT 800 MT YARD CAPACITY ----- 192500 MT 182900 MT
  21. 21. Santosh Kumar VermaCHP-OPN (Group D)