Your SlideShare is downloading. ×
Sami Khoury - Selected Projects List
Upcoming SlideShare
Loading in...5
×

Thanks for flagging this SlideShare!

Oops! An error has occurred.

×
Saving this for later? Get the SlideShare app to save on your phone or tablet. Read anywhere, anytime – even offline.
Text the download link to your phone
Standard text messaging rates apply

Sami Khoury - Selected Projects List

410

Published on

Published in: Design
0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total Views
410
On Slideshare
0
From Embeds
0
Number of Embeds
1
Actions
Shares
0
Downloads
0
Comments
0
Likes
0
Embeds 0
No embeds

Report content
Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
No notes for slide

Transcript

  • 1. Sami R. Khoury, AIA Los Angeles + JordanSelected Projects List Intl USA Cell: +1.562.250.5621 | Local Cell +962.77.680.6081 Email: sami@samikhoury.com | Linked In | Resume | Short PortfolioMIXED USESt. Regis Hotel and Branded Residences, Al Maabar Mixed Use Development –Amman, Jordan – Year: 2010-2015 (projected) Built Up Area: 126,000 sq m (1.36 mmsf) – Land Area: 18,000 sq m (4.45 acre) – Budget: USD 200 Million Owner: Al Maabar International Investments Hotel Operator: Starwood Interior Designer: Forrest Perkins Design Architect: Perkins Eastman Project Manager: KEO International Architect of Record: Arabtech Jardaneh Cost Consultant: NEA partners Landscape Architect: Cracknell Program: Hospitality (Five Star Hotel) – Branded Residences – Luxury Retail – Spa and Wellness Job title: Senior Projects Engineer, Development (at Al Maabar International Investments) Reviewing and approving design and technical architectural deliverables against design standards, corporate and hotel operator intent. Setting up and managing the legal parcelization and by-laws technical documents. Consultants and specialty consultants management including the programme management consultant, design architect, architect of record, landscape architect, interior designer, geotechnical, civil, structural & MEP engineers, cost consultants, facilities manager, kitchen & waste management consultant, security consultant, lighting consultant, fire safety, wind consultant, vertical transportation consultant, traffic engineer, retail mix consultant, procurement agents. Procurement and management of General and subcontractors. Client representative on construction progress meetings.Dubai Festival City, Festival Waterfront Centre – Dubai, UAE – Year: 2005-2007 Built up Area: 2.5 mmsf (232k sq m) – Land Area: 78 acres (31.6 ha) – Cost: approx USD 1 billion Client: Al Futtaim Group Engineers: Hyder Consulting + Ove Arup Architects: Jerde Partnership + HOK Contractors: Al Futtaim Carillion + Waagner Biro Program: Retail – Entertainment Job title: Project Manager, Middle East (at the Jerde Partnership) Commercial account management, Contract administration, sub-consultant management. Design development, project coordination, construction documentation and construction administration of pivotal complex geometrical elements.DIFC - Dubai International Financial Center, Woven Gardens Retail Link – Dubai, UAE – Year: 2008 Built up Area: 805,384 sq m (8.67 mmsf) – Land Area: 110,157 sq m (27.2 acres) – Budget: USD 1.5 Billion Client: DIFC Architect: Jerde Partnership Program: Retail – Entertainment – Cultural – Commercial – Residential Job title: Project Manager, Middle East (at the Jerde Partnership) Project manager and design coordinator for the retail podium linking the DIFC district towers.San Diego Navy Broadway Complex, Waterfront Masterplan – San Diego, California – Year: 2005 Built up Area: 3,250,000 sq ft (301,934 sq m) – Land Area: 12 acres (4.86 ha) – Budget: USD 115 million Client: Clark Real Estate Hotel Operator: Starwood Architect: Jerde Partnership Project Finance: Merrill Lynch Program: Retail – Entertainment – Commercial – Hospitality – Cultural – Institutional – Military Job title: Project Manager (at the Jerde Partnership) Project Manager for this USD 250K-fee design competition. Monitored scope & developed an additional USD 40K of fees for additional services.
  • 2. Sami R. Khoury, AIA Los Angeles + JordanSelected Projects List Intl USA Cell: +1.562.250.5621 | Local Cell +962.77.680.6081 Email: sami@samikhoury.com | Linked In | Resume | Short PortfolioMIXED USEIbn Battuta Mall Expansion – Dubai, UAE – Year: 2009 Expansion Built up Area: 4,500,000 sq ft (41,800 sq m)– Budget: US$1.2 Billion Client: Nakheel Retail Corp. Architect: Cubellis Costa International Engineer: Norr Project Manager: Thinc Projects Cost Consultant: Davis Langdon Program: Retail – Entertainment – Commercial Job title: Design Architect – Senior Project Designer (at Cubellis Costa International) Designer on the project expansion, coordinating works with structural, MEP consultants. Road Traffic Interface Coordination with Dubai railway. Site as-builts and construction observation for retail shops.Commerce Town Center – Commerce, Los Angeles, California – Year: 2005 Built up area: 350,000 sq ft (32,500 sq m) – Land Area: 36 acres (14.6 ha)– Budget: Approx USD 80 million Developer: J.h Snyder Co. Architect: Jerde Partnership Program: Retail – Food and Beverage – Entertainment Job title: Designer (at the Jerde Partnership) Masterplan concept designer for a town center with an open court and outdoor activities. Laid out retail, including 4 anchor stores, 16 screen cinema, 34 shops and parking.Bella Terra – Huntington Beach, California – Year: 2002 Built up Area: 770,000 sq ft (71,500 sq m)– Land Area: 50 acres (20.2 ha) – Cost: USD 170 million Developers: J.h. Snyder Co. – DJM Capital Partners, Inc. – The Ezralow Company Architects: Perkowitz + Ruth – Jerde Partnership – L.A. Group (Landscape Design) Program: Retail – Food and Beverage – Entertainment Job title: Design Staff (at Perkowitz + Ruth Architects) Elevation design and colored rendering. Parking layout and delivery truck Autoturn design coordination.Airport Retail ConcessionairesTerminal 4 – The LAX modernization project – Los Angeles, California – Year: 2010 Concessions Area in Terminal 4: 18,000 sq ft (1,670 sq m) – Terminal 4 Area: 200,000 sq ft (18,580 sq m) Owner: LAWA – Los Angeles World Airports Concessionaires Retail Renovation Architect: Corsini Stark Architects Program: Airport – Retail – Food and Beverage – Interior Design and Storefront Renovations Job title: Design and Management Consultant (at Corsini Stark Architects) Support in creating the base master schedule MS project file for the architectural design works of the retail concessionaires of the Tom Bradley Terminal. Support in Concept and schematic design. 3D modeling and visualization of the project.
  • 3. Sami R. Khoury, AIA Los Angeles + JordanSelected Projects List Intl USA Cell: +1.562.250.5621 | Local Cell +962.77.680.6081 Email: sami@samikhoury.com | Linked In | Resume | Short PortfolioURBAN DEVELOPMENTSMarsa Zayed Waterfront Urban Development – Aqaba, Jordan – Year: 2012-2015 (Phase I projected completion) Built up Area: 6.4 million (69 mmsf)– Land Area: 3.2 million sq m (790 ac) – Budget: USA 10 billion Developer: Al Maabar International Master Plan Cost Consultant: AECOM Program Manager: Hill International Phase 1 Quantity Surveyor: NEA Architect: Maisam Architects and Engineers Business Consultants: Jones Lang La Salle Landscape Architect: Franco Zagari Branding Consultant: Brash Master Planners: Callison Primary Infrastructure Contractor: Hussein Atieh Est. Infrastructure Consultant: Arabtech Jardaneh Job title: Senior Projects Engineer, Development (at Al Maabar International Investments) Procurement management including pre-qualification of consultants and contractors, invitation to tender, managing tender queries, tender evaluation, award and final negotiation. Client representative on site progress meetings involving architect, contractor, project manager, quantity surveyors, making sure development goals are met. Managing peer review workshops and third party QA/QC consultants. Specifications review. Government and city authorities’ presentations.Jumeirah Garden City Master – Dubai, UAE – Year: 2007 Urban Redevelopment Land Area: 9 million sq m (2,224 acres) – Budget: USD 95 billion Client: MERAAS Holding Urban Planning Design Architect: the Jerde Partnership Job title: Project Manager, Middle East (at the Jerde Partnership) Client management, design coordination and project presentation. Contract and commercial account manager.Jumeirah Hills – Dubai, UAE – Year: 2007 Land Area: 1.5 million sq m (371 acres) – Built up Area (GFA): 4.64 million sq m (50 million sq ft) Client: Sama Dubai Urban Planning Design Architect: Jerde Partnership Job title: Project Manager, Middle East (at the Jerde Partnership) Participation in 3D modeling and design of the masterplan central elements. Client management, additional service fee negotiation, Contract and commercial account manager.RESIDENTIALSouthwestern Law School Graduate Housing – Los Angeles, California – Year: 2009-2013 (Projected) Built Up Area: 105,000 sq ft (9,755 sq m) – Land Area: 1.27 acres (5,140 sq m) – Budget: USD 20 million Architect: Corsini Stark Architects Client: Southwestern Law School Job title: Design and Management Consultant (at Corsini Stark Architects) 3D BIM modeling & project visualization services. CD and SD design and project management support.Delaware Avenue Condominiums – Santa Monica, California – Year: 2005 Built up Area: 7,000 sq ft (650 sq m) – Land Area: 8,200 sq f (762 sq m) – Budget: USD 1.6 million Architect: Corsini Stark Architects Job title: Design and Management Consultant (at Corsini Stark Architects) FormZ modeling, clash interference detection, and 3ds max visualization.
  • 4. Sami R. Khoury, AIA Los Angeles + JordanSelected Projects List Intl USA Cell: +1.562.250.5621 | Local Cell +962.77.680.6081 Email: sami@samikhoury.com | Linked In | Resume | Short PortfolioCommercial414 Bamboo Lane Mixed Use – Chinatown, Los Angeles, California – Year: 2006 Built up Area: 6,266 sq ft (582 sq m)– Land Area: 2,443 sq ft (227 sq m)– Budget: USD 1.3 million Architect: Corsini Stark Architects Job title: Design and Management Consultant (at Corsini Stark Architects) Rhino 3d modeling and 3ds max visualization of building. Full texture mapped modeling of site context for city plan check review and neighborhood approval.FEDERAL – INSTITUTIONALUnited States Courthouse – Bakersfield, California – Year: 2004 Built up Area: 41,500 sq ft (3,855 sq m)–Land Area: 229,000 sq ft (2.1 ha)–Budget: approx. USD 25 million Client: General Services Administration Tenants: Magistrate Court, U.S. Marshals Service, and U.S. Probation & Pretrial Services Architect: Carrier Johnson + Culture Job title: Designer (at Carrier Johnson + Culture) Prepared Concept design drawings package. Participated in solving program & circulation. Created 3D model, presentation renderings and flythrough animation.EDUCATIONALComputer Science Building 3, UC Irvine – Irvine, California – Year: 2004 Built up Area: 160,000 sq ft (14,864 sq m) – Cost: $40.2 million Client: University of California Irvine Contractor: Hensel Phelps Construction Co. Architect: Carrier Johnson + Culture Project Award: LEED Gold (2009) Job title: Designer (at Carrier Johnson + Culture) Prepared colored presentation plans for concept design. Coordinated concept plans and elevations in preparation for Revit modeling. Started the BIM Model after schematic design at the outset of Revit implementation in the firm’s pipeline.RELIGIOUSSheikh Zayed Bin Sultan Al Nahyan Grand Masjid – Aqaba, Jordan – Year: 2012-2014 (projected) Built up Area: 3,885 sq m (41,817 sq ft) – Land Area: 18,000 sq m (4.5 acre) – Cost: USD 6 million Client: Al Maabar International Investments Cost Consultants: AECOM, NEA & Partners Architect: Dar Al Omran Project Manager: Hill International Job title: Senior Projects Engineer, Development (at Al Maabar International Investments) Design review and recommendations. Project progress reporting. Client representative for the site primary infrastructure construction. Participation in procurement management, tender evaluation and final negotiation for superstructure contractor.

×